<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Nuclear &#8211; Energy Collective</title>
	<atom:link href="https://theenergycollective.com/category/nuclear/feed/" rel="self" type="application/rss+xml" />
	<link>https://theenergycollective.com</link>
	<description>Charting the clean energy transition</description>
	<lastBuildDate>Mon, 23 Nov 2026 16:08:39 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://theenergycollective.com/wp-content/uploads/2025/09/the-energy-collective-logo-92x96.png</url>
	<title>Nuclear &#8211; Energy Collective</title>
	<link>https://theenergycollective.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Pros and cons of nuclear energy</title>
		<link>https://theenergycollective.com/pros-and-cons-of-nuclear-energy/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Tue, 24 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1153</guid>

					<description><![CDATA[US nuclear reactors ran at a 91% capacity factor in 2025, higher than other types of power plants, but Georgia&#8217;s two newest reactors cost more than $30 billion&#8230;]]></description>
										<content:encoded><![CDATA[<p>US nuclear reactors ran at a <a href="https://www.eia.gov/energyexplained/nuclear/us-nuclear-industry.php" target="_blank" rel="noopener">91% capacity factor in 2025</a>, higher than other types of power plants, but Georgia&#8217;s two newest reactors cost <a href="https://www.eia.gov/todayinenergy/detail.php?id=57280" target="_blank" rel="noopener">more than $30 billion</a> to build. The US also holds <a href="https://www.congress.gov/crs_external_products/R/PDF/R42853/R42853.43.pdf" target="_blank" rel="noopener">about 99,000 metric tons of spent fuel</a> and still has no permanent place to put it. The figures come mostly from EIA and DOE, along with GAO reports and a peer-reviewed land-use study, and they describe 2025 or 2026 unless a line says otherwise.</p>
<h2>Top nuclear energy statistics</h2>
<ul>
<li>Nuclear plants produced <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_1" target="_blank" rel="noopener">785 billion kWh in 2025</a>, which works out to 17.7% of US utility-scale electricity, a share calculated from EIA&#8217;s generation table.</li>
<li>DOE says nuclear plants <a href="https://www.energy.gov/ne/articles/advantages-and-challenges-nuclear-energy" target="_blank" rel="noopener">can employ up to 800 workers each</a> and produce nearly half of the nation&#8217;s emissions-free electricity.</li>
<li>The IPCC&#8217;s 2014 review put nuclear&#8217;s median lifecycle emissions at <a href="https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf" target="_blank" rel="noopener">12 grams of CO2 equivalent per kWh</a>.</li>
<li>Vogtle Units 3 and 4 were <a href="https://www.eia.gov/todayinenergy/detail.php?id=57280" target="_blank" rel="noopener">expected to cost $14 billion</a> when construction began in 2009 and now cost more than double that.</li>
<li>South Carolina&#8217;s V.C. Summer project was abandoned on July 31, 2017 after <a href="https://www.neimagazine.com/news/newsus-utilities-pull-out-of-vc-summer-project-5887728" target="_blank" rel="noopener">about $9 billion</a> had been spent on two reactors that never ran.</li>
<li>GAO counted <a href="https://www.gao.gov/products/GAO-21-603" target="_blank" rel="noopener">about 86,000 metric tons of spent fuel at 75 US sites</a> in 2021.</li>
<li>DOE terminated its Yucca Mountain licensing effort in <a href="https://www.gao.gov/products/GAO-21-603" target="_blank" rel="noopener">2010</a> and Congress stopped funding the site.</li>
<li>NRC says decommissioning a reactor <a href="https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning" target="_blank" rel="noopener">generally costs $300 million to $400 million</a>.</li>
</ul>
<h2>What are the pros and cons of nuclear energy?</h2>
<p>Nuclear power&#8217;s strongest numbers are a <a href="https://www.eia.gov/energyexplained/nuclear/us-nuclear-industry.php" target="_blank" rel="noopener">91% capacity factor in 2025</a> and low lifecycle emissions. Its weak spots are Vogtle&#8217;s cost overruns and a spent-fuel stockpile with no repository.</p>
<table>
<thead>
<tr>
<th>Point</th>
<th>Pro or con</th>
<th>Number</th>
<th>Period and scope</th>
</tr>
</thead>
<tbody>
<tr>
<td>Lifecycle emissions</td>
<td>Pro</td>
<td>12 g CO2e per kWh, median</td>
<td>IPCC literature review, 2014</td>
</tr>
<tr>
<td>Capacity factor</td>
<td>Pro</td>
<td>91.1%</td>
<td>US utility-scale reactors, 2025</td>
</tr>
<tr>
<td>Land use</td>
<td>Pro</td>
<td>7.1 ha per TWh per year, median</td>
<td>Direct and indirect land, 2022 study</td>
</tr>
<tr>
<td>Clean electricity</td>
<td>Pro</td>
<td>Nearly half of emissions-free power</td>
<td>US, DOE</td>
</tr>
<tr>
<td>Jobs</td>
<td>Pro</td>
<td>Up to 800 workers per plant</td>
<td>US plants, DOE</td>
</tr>
<tr>
<td>Construction cost</td>
<td>Con</td>
<td>More than $30 billion against $14 billion planned</td>
<td>Vogtle 3 and 4, 2024</td>
</tr>
<tr>
<td>Build time</td>
<td>Con</td>
<td>Service dates of 2023 and 2024 against targets of 2016 and 2017</td>
<td>Vogtle 3 and 4</td>
</tr>
<tr>
<td>Cancelled reactors</td>
<td>Con</td>
<td>About $9 billion spent</td>
<td>V.C. Summer 2 and 3, 2017</td>
</tr>
<tr>
<td>Spent fuel</td>
<td>Con</td>
<td>About 99,000 metric tons, up about 2,200 a year</td>
<td>US commercial reactors, May 2026</td>
</tr>
<tr>
<td>Waste disposal</td>
<td>Con</td>
<td>No repository, no Yucca funding since FY2010</td>
<td>US, 2026</td>
</tr>
<tr>
<td>Decommissioning</td>
<td>Con</td>
<td>$300 million to $400 million per reactor</td>
<td>NRC, generally</td>
</tr>
<tr>
<td>Accidents</td>
<td>Con</td>
<td>28 of 134 Chernobyl workers with radiation sickness died within three months</td>
<td>Chernobyl, 1986</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf" target="_blank" rel="noopener">IPCC, AR5 Annex III</a>, <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_b" target="_blank" rel="noopener">EIA, Electric Power Monthly Table 6.07.B</a>, <a href="https://doi.org/10.1371/journal.pone.0270155" target="_blank" rel="noopener">PLOS ONE land-use study</a>, <a href="https://www.energy.gov/ne/articles/advantages-and-challenges-nuclear-energy" target="_blank" rel="noopener">DOE, Advantages and challenges of nuclear energy</a>, <a href="https://www.eia.gov/todayinenergy/detail.php?id=61963" target="_blank" rel="noopener">EIA, Today in Energy, May 2024</a>, <a href="https://www.everycrsreport.com/reports/IN10750.html" target="_blank" rel="noopener">CRS, Rising costs and delays doom new nuclear reactors in South Carolina</a>, <a href="https://www.congress.gov/crs-product/R42853" target="_blank" rel="noopener">CRS, Nuclear Energy: Overview of Congressional Issues</a>, <a href="https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning" target="_blank" rel="noopener">NRC, Decommissioning fact sheet</a>, <a href="https://www.unscear.org/unscear/en/chernobyl.html" target="_blank" rel="noopener">UNSCEAR, Chernobyl</a>.</p>
<p>The pros show up once a plant is running, and the cons sit at either end of its life, in the construction bill at the start and the waste and cleanup at the end. EIA counted <a href="https://www.eia.gov/tools/faqs/faq.php?id=207&amp;t=3" target="_blank" rel="noopener">94 reactors in operation at 54 plants across 28 states</a> in March 2026, and <a href="https://theenergycollective.com/nuclear-outlook/">nuclear power&#8217;s future in the US</a> starts from that fleet.</p>
<h2>How much carbon does nuclear power produce?</h2>
<p>The IPCC&#8217;s review put nuclear&#8217;s median lifecycle emissions at <a href="https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf" target="_blank" rel="noopener">12 grams of CO2 equivalent per kWh</a>, with studies ranging from 3.7 to 110.</p>
<h2>How reliable is nuclear power?</h2>
<p>Nuclear plants ran at a <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_b" target="_blank" rel="noopener">91.1% capacity factor in 2025</a>, the highest in EIA&#8217;s table of non-fossil sources, against 33.8% for wind and 24.0% for solar PV. EIA reports <a href="https://theenergycollective.com/capacity-factor/">average capacity factors</a> by plant type, which compare a year&#8217;s output with the most the plants could have made.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Capacity factor, 2025 (%)</th>
<th>Utility-scale capacity (MW)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Nuclear</td>
<td>91.1</td>
<td>98,408.2</td>
</tr>
<tr>
<td>Geothermal</td>
<td>65.9</td>
<td>2,681.2</td>
</tr>
<tr>
<td>Wood</td>
<td>55.8</td>
<td>7,289.1</td>
</tr>
<tr>
<td>Hydroelectric</td>
<td>34.4</td>
<td>79,984.0</td>
</tr>
<tr>
<td>Wind</td>
<td>33.8</td>
<td>155,344.4</td>
</tr>
<tr>
<td>Solar photovoltaic</td>
<td>24.0</td>
<td>134,526.3</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_07_b" target="_blank" rel="noopener">EIA, Electric Power Monthly, Table 6.07.B</a>, 2025 annual figures.</p>
<h2>How much of America&#8217;s clean electricity is nuclear?</h2>
<p>About <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_1" target="_blank" rel="noopener">42% of US carbon-free electricity in 2025</a> came from nuclear, a share calculated from EIA&#8217;s generation table, and DOE puts it at <a href="https://www.energy.gov/ne/articles/advantages-and-challenges-nuclear-energy" target="_blank" rel="noopener">nearly half</a>. The calculation adds nuclear, conventional hydro, solar and EIA&#8217;s category for other renewables, which includes biomass.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Generation, 2025 (GWh)</th>
<th>Share of carbon-free total (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Nuclear</td>
<td>785,304</td>
<td>42.5</td>
</tr>
<tr>
<td>Renewables excluding hydro and solar</td>
<td>522,497</td>
<td>28.3</td>
</tr>
<tr>
<td>Solar, utility-scale</td>
<td>300,303</td>
<td>16.2</td>
</tr>
<tr>
<td>Conventional hydro</td>
<td>241,303</td>
<td>13.0</td>
</tr>
<tr>
<td>Total</td>
<td>1,849,407</td>
<td>100.0</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_1" target="_blank" rel="noopener">EIA, Electric Power Monthly, Table 1.1</a>. Shares are calculated from EIA&#8217;s 2025 utility-scale figures.</p>
<h2>How much land does nuclear power need?</h2>
<p>Nuclear had the lowest median land use in a 2022 PLOS ONE study of real plants, <a href="https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0270155" target="_blank" rel="noopener">7.1 hectares per terawatt-hour a year</a>, against 2,000 for ground-mounted solar PV.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Median land use (ha per TWh per year)</th>
<th>Observations</th>
</tr>
</thead>
<tbody>
<tr>
<td>Nuclear</td>
<td>7.1</td>
<td>59</td>
</tr>
<tr>
<td>Wind, footprint basis</td>
<td>130</td>
<td>57</td>
</tr>
<tr>
<td>Natural gas, footprint basis</td>
<td>410</td>
<td>17</td>
</tr>
<tr>
<td>Hydroelectric, single-purpose dams</td>
<td>650</td>
<td>952</td>
</tr>
<tr>
<td>Coal</td>
<td>1,000</td>
<td>30</td>
</tr>
<tr>
<td>Natural gas, spacing basis</td>
<td>1,900</td>
<td>4</td>
</tr>
<tr>
<td>Ground-mounted solar PV</td>
<td>2,000</td>
<td>94</td>
</tr>
<tr>
<td>Wind, spacing basis</td>
<td>12,000</td>
<td>57</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0270155" target="_blank" rel="noopener">Lovering and colleagues, PLOS ONE, 2022, Table 1</a>. Medians of direct and indirect land use, including fuel mining.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/pros-and-cons-land-use-2026-11-19.png" alt="Bar chart of median land use per terawatt-hour a year, from 7.1 hectares for nuclear to 2,000 for solar PV, with wind at 130, natural gas at 410, hydro at 650 and coal at 1,000" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0270155" target="_blank" rel="noopener">PLOS ONE, 2022</a>.</figcaption></figure>
<p>Wind and natural gas appear twice because the authors report them on two bases, and for wind the gap between the two is wide. The chart uses the footprint figures. The same authors found that adding the exclusion zones around Chernobyl and Fukushima <a href="https://doi.org/10.1371/journal.pone.0270155" target="_blank" rel="noopener">raises nuclear&#8217;s figure by 3.9 hectares per TWh a year</a>.</p>
<h2>What did Vogtle 3 and 4 cost?</h2>
<p>Georgia&#8217;s two new Vogtle reactors cost <a href="https://www.eia.gov/todayinenergy/detail.php?id=61963" target="_blank" rel="noopener">more than $30 billion against the $14 billion first expected</a>. The Associated Press calculated the owners&#8217; cost at <a href="https://www.apr.org/news/2024-04-29/a-second-new-nuclear-reactor-is-completed-in-georgia-for-customers-including-alabama" target="_blank" rel="noopener">$31 billion</a>.</p>
<table>
<thead>
<tr>
<th>Estimate</th>
<th>Date</th>
<th>Cost ($ billion)</th>
<th>What it covers</th>
</tr>
</thead>
<tbody>
<tr>
<td>First estimate</td>
<td>2009</td>
<td>14</td>
<td>Units 3 and 4, all owners</td>
</tr>
<tr>
<td>Power Engineering report</td>
<td>November 2021</td>
<td>28.5</td>
<td>Excludes $3.68 billion Westinghouse repaid</td>
</tr>
<tr>
<td>Georgia Power fact sheet</td>
<td>February 2023</td>
<td>10.2</td>
<td>Georgia Power&#8217;s share only</td>
</tr>
<tr>
<td>EIA Today in Energy</td>
<td>August 2023</td>
<td>More than 30</td>
<td>Whole project</td>
</tr>
<tr>
<td>AP calculation</td>
<td>April 2024</td>
<td>31</td>
<td>Owners&#8217; cost, 35 with Westinghouse payments</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/todayinenergy/detail.php?id=57280" target="_blank" rel="noopener">EIA, Today in Energy, August 2023</a>, <a href="https://www.power-eng.com/nuclear/nuclear-plant-price-doubles-to-28-5b-as-other-owners-balk/" target="_blank" rel="noopener">Power Engineering, November 2021</a>, <a href="https://www.georgiapower.com/content/dam/georgia-power/pdfs/company-pdfs/20230504-EA_NUC_Feb-2023-Fact-Sheet_DESIGN_Final.pdf" target="_blank" rel="noopener">Georgia Power, Vogtle 3 and 4 fact sheet, February 2023</a>, <a href="https://www.apr.org/news/2024-04-29/a-second-new-nuclear-reactor-is-completed-in-georgia-for-customers-including-alabama" target="_blank" rel="noopener">Associated Press via Alabama Public Radio</a>.</p>
<p>The figures differ because they count different things. Georgia Power&#8217;s <a href="https://www.georgiapower.com/content/dam/georgia-power/pdfs/company-pdfs/20230504-EA_NUC_Feb-2023-Fact-Sheet_DESIGN_Final.pdf" target="_blank" rel="noopener">$10.2 billion</a> is its own share, and the others cover every owner, with or without the <a href="https://www.power-eng.com/nuclear/nuclear-plant-price-doubles-to-28-5b-as-other-owners-balk/" target="_blank" rel="noopener">$3.68 billion</a> Westinghouse repaid after its bankruptcy.</p>
<p>Unit 3 went commercial on <a href="https://southerncompany.mediaroom.com/2024-04-29-Vogtle-Unit-4-enters-commercial-operation" target="_blank" rel="noopener">July 31, 2023</a> and Unit 4 followed on April 29, 2024, against targets of 2016 and 2017. If you&#8217;re a Georgia Power customer, the AP reported that <a href="https://www.apr.org/news/2024-04-29/a-second-new-nuclear-reactor-is-completed-in-georgia-for-customers-including-alabama" target="_blank" rel="noopener">electric customers in Georgia already have paid billions</a> for the plant.</p>
<p>SCE&amp;G and Santee Cooper <a href="https://www.wfae.org/energy-environment/2017-07-31/sc-utilities-abandon-nuclear-plant-expansion" target="_blank" rel="noopener">abandoned the V.C. Summer project on July 31, 2017</a> after spending <a href="https://www.wfae.org/energy-environment/2017-07-31/sc-utilities-abandon-nuclear-plant-expansion" target="_blank" rel="noopener">about $9 billion</a> when Westinghouse went bankrupt. In 2008 the owners planned Unit 2 for 2016 and Unit 3 for 2019, at <a href="https://www.everycrsreport.com/reports/IN10750.html" target="_blank" rel="noopener">$9.8 billion for both</a>.</p>
<table>
<thead>
<tr>
<th>Reactor</th>
<th>First in-service target</th>
<th>Outcome</th>
<th>Date</th>
</tr>
</thead>
<tbody>
<tr>
<td>Vogtle Unit 3</td>
<td>2016</td>
<td>Commercial operation</td>
<td>July 31, 2023</td>
</tr>
<tr>
<td>Vogtle Unit 4</td>
<td>2017</td>
<td>Commercial operation</td>
<td>April 29, 2024</td>
</tr>
<tr>
<td>V.C. Summer Unit 2</td>
<td>2016</td>
<td>Abandoned</td>
<td>July 31, 2017</td>
</tr>
<tr>
<td>V.C. Summer Unit 3</td>
<td>2019</td>
<td>Abandoned</td>
<td>July 31, 2017</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/todayinenergy/detail.php?id=61963" target="_blank" rel="noopener">EIA, Today in Energy, May 2024</a>, <a href="https://southerncompany.mediaroom.com/2024-04-29-Vogtle-Unit-4-enters-commercial-operation" target="_blank" rel="noopener">Southern Company, Vogtle Unit 4 release</a>, <a href="https://www.everycrsreport.com/reports/IN10750.html" target="_blank" rel="noopener">CRS, Insight IN10750</a>.</p>
<p>If you were an SCE&amp;G customer, your bills had <a href="https://www.neimagazine.com/news/newsus-utilities-pull-out-of-vc-summer-project-5887728" target="_blank" rel="noopener">already carried about $1.4 billion</a> for reactors that never produced power. Construction bills like these are one input into how <a href="https://theenergycollective.com/solar-vs-nuclear-cost/">nuclear and solar costs</a> compare.</p>
<h2>How much spent nuclear fuel does the US have?</h2>
<p>The US held about 99,000 metric tons of commercial spent fuel in May 2026 and adds <a href="https://www.congress.gov/crs-product/R42853" target="_blank" rel="noopener">about 2,200 metric tons a year</a>, CRS estimated.</p>
<table>
<thead>
<tr>
<th>Date</th>
<th>Spent fuel (metric tons)</th>
<th>Source basis</th>
</tr>
</thead>
<tbody>
<tr>
<td>December 2011</td>
<td>More than 67,000</td>
<td>CRS, metric tons</td>
</tr>
<tr>
<td>June 30, 2013</td>
<td>70,300.8</td>
<td>EIA, tons of uranium</td>
</tr>
<tr>
<td>December 31, 2017</td>
<td>79,825.1</td>
<td>EIA, tons of uranium</td>
</tr>
<tr>
<td>2021</td>
<td>About 86,000</td>
<td>GAO, metric tons</td>
</tr>
<tr>
<td>May 2026</td>
<td>About 99,000</td>
<td>CRS, metric tons</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.everycrsreport.com/files/20120524_R42513_ee7e094aee48bd591b471cb19c4240249221e297.html" target="_blank" rel="noopener">CRS, Spent fuel storage, May 2012</a>, <a href="https://www.eia.gov/nuclear/spent_fuel/" target="_blank" rel="noopener">EIA, Nuclear fuel data survey</a>, <a href="https://www.gao.gov/products/GAO-21-603" target="_blank" rel="noopener">GAO-21-603</a>, <a href="https://www.congress.gov/crs-product/R42853" target="_blank" rel="noopener">CRS, Nuclear Energy: Overview of Congressional Issues</a>.</p>
<p>US reactors loaded <a href="https://www.eia.gov/energyexplained/nuclear/the-nuclear-fuel-cycle.php" target="_blank" rel="noopener">44.4 million pounds of uranium oxide in 2022</a>, and the <a href="https://theenergycollective.com/uranium/">uranium supply chain</a> behind that fuel runs from mining through enrichment. DOE says the spent fuel is <a href="https://www.energy.gov/ne/articles/5-fast-facts-about-spent-nuclear-fuel" target="_blank" rel="noopener">stored at more than 70 sites in 35 states</a>, which may include yours, and that all of it would fit on a football field stacked less than 10 yards deep. DOE&#8217;s <a href="https://www.energy.gov/ne/articles/5-fast-facts-about-spent-nuclear-fuel" target="_blank" rel="noopener">2,000 metric tons a year</a> runs a little below CRS&#8217;s estimate, and neither source gives its method.</p>
<p>The US has <a href="https://www.eia.gov/energyexplained/nuclear/nuclear-power-and-the-environment.php" target="_blank" rel="noopener">no permanent disposal facility</a> for high-level waste. DOE applied for a Yucca Mountain license on <a href="https://www.nrc.gov/waste/hlw-disposal/yucca-lic-app.html" target="_blank" rel="noopener">June 3, 2008</a>, and CRS reported in August 2026 that <a href="https://www.congress.gov/crs_external_products/R/PDF/R42853/R42853.43.pdf" target="_blank" rel="noopener">no new funding has been appropriated since FY2010</a> while it remains the sole authorized candidate site. Reprocessing is <a href="https://www.eia.gov/energyexplained/nuclear/the-nuclear-fuel-cycle.php" target="_blank" rel="noopener">not permitted in the United States</a>, though DOE says <a href="https://www.energy.gov/ne/articles/5-fast-facts-about-spent-nuclear-fuel" target="_blank" rel="noopener">more than 90% of the fuel&#8217;s potential energy</a> remains in it.</p>
<p>EIA says uranium is <a href="https://www.eia.gov/energyexplained/nuclear/" target="_blank" rel="noopener">considered a nonrenewable energy source</a>, which is the short answer to whether <a href="https://theenergycollective.com/is-nuclear-energy-renewable/">nuclear energy is renewable</a>.</p>
<h2>What does it cost to decommission a nuclear plant?</h2>
<p>NRC says decommissioning <a href="https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/decommissioning" target="_blank" rel="noopener">generally costs $300 million to $400 million</a> a reactor, and the work must finish within 60 years of shutdown. NRC lets owners cover that bill through <a href="https://www.nrc.gov/waste/decommissioning/finan-assur" target="_blank" rel="noopener">a trust fund or a parent company guarantee</a>, so the money is meant to be set aside before a reactor near you closes.</p>
<p>EIA says <a href="https://www.eia.gov/energyexplained/nuclear/us-nuclear-industry.php" target="_blank" rel="noopener">19 reactors at 15 sites</a> are in various stages of decommissioning, and those units sit outside the <a href="https://theenergycollective.com/how-many-nuclear-power-plants/">count of operating US nuclear power plants</a>.</p>
<h2>What is the nuclear accident record?</h2>
<p>UNSCEAR reported that <a href="https://www.unscear.org/unscear/en/chernobyl.html" target="_blank" rel="noopener">134 of 600 workers at Chernobyl</a> received high doses in 1986 and 28 of them died within three months. It also counted <a href="https://www.unscear.org/unscear/en/chernobyl.html" target="_blank" rel="noopener">more than 6,000 thyroid cancer cases</a> among children and adolescents exposed at the time, reported through 2005.</p>
<p>At Three Mile Island in 1979, NRC says <a href="https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/3mile-isle" target="_blank" rel="noopener">small radioactive releases had no detectable health effects</a> on workers or the public. Those two events anchor the argument over <a href="https://theenergycollective.com/is-nuclear-power-safe/">nuclear power&#8217;s safety record</a>.</p>
<h2>Where these numbers come from</h2>
<p>We calculated nuclear&#8217;s carbon-free share from EIA&#8217;s utility-scale generation table and left small-scale solar out, so it won&#8217;t match DOE&#8217;s figure exactly. The Vogtle table shows each estimate with what it covers, and the spent-fuel table keeps each source&#8217;s units because EIA counts the uranium in the fuel and CRS and GAO count the whole fuel.</p>
<h2>What Vogtle&#8217;s reactors will leave behind</h2>
<p>Georgia Power says the new units will supply <a href="https://southerncompany.mediaroom.com/2024-04-29-Vogtle-Unit-4-enters-commercial-operation" target="_blank" rel="noopener">emissions-free energy for at least 60 to 80 years</a>. DOE invited states on <a href="https://www.congress.gov/crs_external_products/R/PDF/R42853/R42853.43.pdf" target="_blank" rel="noopener">January 28, 2026</a> to host Nuclear Lifecycle Innovation Campuses that could include spent fuel storage and disposal sites.</p>
<p>Until one exists, DOE says the spent fuel can stay at reactor sites, and the fuel Vogtle makes will join the rest in pools and then dry casks beside the plant.</p>
<p class="ec-photo-credit"><small>Top photo: <a href="https://commons.wikimedia.org/wiki/File:2025-03-11_-_Waynesboro,_Georgia,_USA_-_Plant_Vogtle.jpg" target="_blank" rel="noopener">Kai NeSmith</a>, <a href="https://creativecommons.org/licenses/by/4.0" target="_blank" rel="noopener">CC BY 4.0</a>, via Wikimedia Commons, cropped.</small></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>What is nuclear fusion and how close is it to powering the grid?</title>
		<link>https://theenergycollective.com/nuclear-fusion/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Thu, 19 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1124</guid>

					<description><![CDATA[Nuclear fusion is the reaction that powers the sun, in which light atomic nuclei merge and release energy, and the best laboratory shot so far released 8.6 megajoules&#8230;]]></description>
										<content:encoded><![CDATA[<p>Nuclear fusion is the reaction that powers the sun, in which light atomic nuclei merge and release energy, and the best laboratory shot so far released <a href="https://lasers.llnl.gov/news/nif-jlf-user-groups-celebrate-milestones-new-capabilities" target="_blank" rel="noopener">8.6 megajoules</a> at the US National Ignition Facility (NIF) in 2025. Firing the laser behind that shot takes <a href="https://physicsworld.com/a/national-ignition-facilitys-ignition-milestone-sparks-fresh-push-for-laser-fusion/" target="_blank" rel="noopener">around 400 megajoules of electricity</a> by Physics World&#8217;s estimate, so it returned far less energy than the facility drew. ITER, the largest tokamak under construction, plans to start burning deuterium and tritium in <a href="https://physicsworld.com/a/iter-fusion-reactor-hit-by-massive-decade-long-delay-and-e5bn-price-hike/" target="_blank" rel="noopener">2039</a>. The figures come mostly from national labs, ITER and the Fusion Industry Association (FIA).</p>
<h2>Top nuclear fusion statistics</h2>
<ul>
<li>NIF set its record yield of 8.6 megajoules on April 7, 2025, at a <a href="https://lasers.llnl.gov/news/nif-jlf-user-groups-celebrate-milestones-new-capabilities" target="_blank" rel="noopener">target gain above 4</a>.</li>
<li>On June 20, 2026, NIF reached ignition for an <a href="https://lasers.llnl.gov/science/pursuit-of-ignition" target="_blank" rel="noopener">11th time</a>, with a yield of 7.9 megajoules.</li>
<li>JET&#8217;s final run in 2023 produced <a href="https://www.gov.uk/government/news/jets-final-tritium-experiments-yield-new-fusion-energy-record" target="_blank" rel="noopener">69 megajoules over 5 seconds</a> from 0.2 milligrams of fuel, a record for a single pulse.</li>
<li>China&#8217;s EAST tokamak held a steady-state high-confinement plasma for <a href="https://www.physicsworld.com/a/chinas-experimental-advanced-superconducting-tokamak-smashes-fusion-confinement-record/" target="_blank" rel="noopener">1066 seconds</a> in 2025.</li>
<li>ITER&#8217;s July 2024 baseline puts the start of deuterium-tritium operation in <a href="https://www.iter.org/node/28514" target="_blank" rel="noopener">2039</a>.</li>
<li>Fusion companies reported raising <a href="https://wnn.world-nuclear.org/articles/fusion-industry-raised-usd45-billion-over-past-year-report-says" target="_blank" rel="noopener">$4.48 billion in the 12 months to July 2026</a>, the most in any of the six annual FIA surveys, for a total of <a href="https://www.power-technology.com/newsletters/nuclear-fusion-industry-attracts-record-annual-funding-of-4-48bn" target="_blank" rel="noopener">$14.24 billion</a> since 2021.</li>
<li>The IAEA counted <a href="https://world-nuclear-news.org/articles/fusion-entering-implementation-phase-grossi" target="_blank" rel="noopener">more than 160 fusion devices</a> that were operating, under construction or planned in its World Fusion Outlook 2025.</li>
<li>Every cubic metre of seawater holds <a href="https://iter.org/sci/fusionfuels" target="_blank" rel="noopener">33 grams of deuterium</a>, one of the two fuels energy researchers focus on.</li>
</ul>
<h2>What is nuclear fusion and how does it work?</h2>
<p>Fusion happens when <a href="https://www.energy.gov/science/doe-explainsnuclear-fusion-reactions" target="_blank" rel="noopener">two light nuclei merge to form a single heavier nucleus</a>, and the energy comes from the small amount of mass that goes missing in the merger. Energy research centers on deuterium and tritium, two forms of hydrogen. Their reaction <a href="https://www.energy.gov/science/doe-explainsnuclear-fusion-reactions" target="_blank" rel="noopener">makes a neutron and a helium nucleus</a> and releases <a href="https://www.iter.org/node/20687/magic-cocktail-deuterium-and-tritium" target="_blank" rel="noopener">17.6 million electron volts</a> each time.</p>
<p>Deuterium comes from water. Tritium is scarce in nature, so a power plant would make it from lithium, and ITER names <a href="https://www.iter.org/sci/Fusion" target="_blank" rel="noopener">breeding and recovering tritium reliably</a> as a major hurdle.</p>
<p>The hard part is the heat. ITER designed its plasma for <a href="https://iter.org/sci/fusionfuels" target="_blank" rel="noopener">150,000,000 degrees C</a>, so reactors hold the plasma in place with magnets or lasers. Inside a tokamak such as ITER&#8217;s, <a href="https://www.iter.org/machine/what-tokamak" target="_blank" rel="noopener">strong magnetic fields</a> confine the plasma in a doughnut-shaped vacuum chamber. NIF takes the other route and <a href="https://www.aip.org/fyi/2022/national-ignition-facility-achieves-long-sought-fusion-goal" target="_blank" rel="noopener">focuses 192 laser beams</a> into a cylinder that encases a spherical target of hydrogen fuel.</p>
<h2>How is nuclear fusion different from fission?</h2>
<p>Fission splits a heavy atom and fusion joins light ones. DOE describes fission as <a href="https://www.energy.gov/node/3485684" target="_blank" rel="noopener">a neutron slamming into a larger atom so it splits</a>, which is how nuclear power plants make heat.</p>
<table>
<thead>
<tr>
<th></th>
<th>Fission</th>
<th>Fusion</th>
</tr>
</thead>
<tbody>
<tr>
<td>What happens</td>
<td>A neutron splits a heavy atom</td>
<td>Two light nuclei merge</td>
</tr>
<tr>
<td>Common fuel</td>
<td>Uranium and plutonium</td>
<td>Deuterium and tritium</td>
</tr>
<tr>
<td>What&#8217;s left over</td>
<td>Fission products and hot spent fuel</td>
<td>Helium and a neutron</td>
</tr>
<tr>
<td>High-level waste</td>
<td>Decays over hundreds of thousands of years</td>
<td>No long-lived, high-activity waste (ITER)</td>
</tr>
<tr>
<td>Energy per equal mass</td>
<td>1</td>
<td>4</td>
</tr>
<tr>
<td>Status</td>
<td>Supplies power to the grid</td>
<td>Experimental</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.energy.gov/node/3485684" target="_blank" rel="noopener">US Department of Energy, Fission and Fusion</a>, <a href="https://www.nrc.gov/waste/high-level-waste.html" target="_blank" rel="noopener">US Nuclear Regulatory Commission, High-Level Waste</a>, <a href="https://www.nrc.gov/reading-rm/basic-ref/students/science-101/what-is-an-nuclear-fuel" target="_blank" rel="noopener">NRC, What is Nuclear Fuel?</a> and <a href="https://www.iter.org/sci/Fusion" target="_blank" rel="noopener">ITER, Advantages of Fusion</a>. Energy per equal mass is ITER&#8217;s comparison, set to 1 for fission.</p>
<p>If your electricity includes nuclear power, it comes from fission, which DOE says supplies <a href="https://www.energy.gov/node/4856386" target="_blank" rel="noopener">nearly 20 percent</a> of US electricity. <a href="/nuclear-outlook/">The future of nuclear power</a> is built on that <a href="/how-many-nuclear-power-plants/">fleet of nuclear power plants</a>, and fission plants carry their own <a href="/is-nuclear-power-safe/">accident and radiation risks</a>.</p>
<p>Fusion&#8217;s waste story has a catch. ITER expects the parts of a reactor that turn radioactive to be <a href="https://www.iter.org/sci/Fusion" target="_blank" rel="noopener">low enough to recycle or reuse within 100 years</a>, depending on the materials. DOE adds that fusion is <a href="https://www.energy.gov/node/3485684" target="_blank" rel="noopener">difficult to sustain for long periods</a> because of the pressure and temperature it needs.</p>
<h2>How much energy has NIF&#8217;s laser fusion produced?</h2>
<p>NIF&#8217;s fusion yield rose from <a href="https://lasers.llnl.gov/science/pursuit-of-ignition" target="_blank" rel="noopener">3.15 megajoules in December 2022</a> to a record 8.6 megajoules in April 2025, and every shot in the table gave back more energy than the laser delivered to the target.</p>
<table>
<thead>
<tr>
<th>Date</th>
<th>Laser energy on target (MJ)</th>
<th>Fusion yield (MJ)</th>
<th>Target gain</th>
</tr>
</thead>
<tbody>
<tr>
<td>Dec. 5, 2022</td>
<td>2.05</td>
<td>3.15</td>
<td>1.54</td>
</tr>
<tr>
<td>July 30, 2023</td>
<td>2.05</td>
<td>3.88</td>
<td>1.89</td>
</tr>
<tr>
<td>Feb. 12, 2024</td>
<td>2.2</td>
<td>5.2 (estimated)</td>
<td>2.36</td>
</tr>
<tr>
<td>Nov. 18, 2024</td>
<td>2.2</td>
<td>4.1</td>
<td>1.86</td>
</tr>
<tr>
<td>Feb. 23, 2025</td>
<td>2.05</td>
<td>5.0</td>
<td>2.44</td>
</tr>
<tr>
<td>Apr. 7, 2025</td>
<td>2.08</td>
<td>8.6</td>
<td>4.13</td>
</tr>
<tr>
<td>Oct. 1, 2025</td>
<td>2.065</td>
<td>3.5</td>
<td>1.74</td>
</tr>
<tr>
<td>June 20, 2026</td>
<td>Not listed</td>
<td>7.9</td>
<td>About 3.8</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://lasers.llnl.gov/science/pursuit-of-ignition" target="_blank" rel="noopener">Lawrence Livermore National Laboratory, Achieving Fusion Ignition</a>. Target gain is yield divided by laser energy. LLNL published the gains for Feb. 23, 2025, Apr. 7, 2025, Oct. 1, 2025 and June 20, 2026, and we calculated the other four.</p>
<p>A Los Alamos-led team also reached ignition at NIF on June 22, 2025, with a <a href="https://www.lanl.gov/media/news/0731-fusion-ignition" target="_blank" rel="noopener">yield of 2.4 megajoules</a>.</p>
<p>Target gain compares the fusion energy with the laser light that hit the fuel, and it leaves out the electricity the laser pulled from the wall. Think of rating a heater by the heat in the room without reading the electric meter. Physics World reported that NIF&#8217;s flash-lamp pumped laser needed <a href="https://physicsworld.com/a/national-ignition-facilitys-ignition-milestone-sparks-fresh-push-for-laser-fusion/" target="_blank" rel="noopener">around 400 megajoules</a> of electricity for a 2 megajoule pulse, a wall-plug efficiency of 0.5%. LLNL hasn&#8217;t published that figure for each shot.</p>
<p>Lasers pumped by diodes could reach <a href="https://physicsworld.com/a/national-ignition-facilitys-ignition-milestone-sparks-fresh-push-for-laser-fusion/" target="_blank" rel="noopener">efficiencies as high as 20%</a>, according to Riccardo Betti of the University of Rochester, and a power plant would still need higher target gains than NIF has shown. NIF also <a href="https://www.energy.gov/nnsa/articles/nnsa-and-lawrence-livermore-national-laboratory-advance-laser-upgrade-nuclear-0" target="_blank" rel="noopener">remains the only facility to have achieved ignition</a>, the US National Nuclear Security Administration says.</p>
<h2>What are the nuclear fusion records for energy and duration?</h2>
<p>JET holds the record for fusion energy from a single pulse, with <a href="https://www.gov.uk/government/news/jets-final-tritium-experiments-yield-new-fusion-energy-record" target="_blank" rel="noopener">69 megajoules in 5 seconds</a> in its last deuterium-tritium run in 2023.</p>
<table>
<thead>
<tr>
<th>Facility</th>
<th>Year</th>
<th>Record</th>
<th>Value</th>
</tr>
</thead>
<tbody>
<tr>
<td>JET (UK)</td>
<td>2023</td>
<td>Fusion energy in one pulse</td>
<td>69 MJ over 5 s</td>
</tr>
<tr>
<td>NIF (US)</td>
<td>2025</td>
<td>Fusion yield from lasers</td>
<td>8.6 MJ</td>
</tr>
<tr>
<td>EAST (China)</td>
<td>2025</td>
<td>Steady-state high-confinement plasma</td>
<td>1066 s</td>
</tr>
<tr>
<td>WEST (France)</td>
<td>2025</td>
<td>Plasma duration</td>
<td>1337 s</td>
</tr>
<tr>
<td>Wendelstein 7-X (Germany)</td>
<td>2025</td>
<td>Triple product in long discharges</td>
<td>43 s</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.gov.uk/government/news/jets-final-tritium-experiments-yield-new-fusion-energy-record" target="_blank" rel="noopener">UK Atomic Energy Authority, JET release</a>, <a href="https://lasers.llnl.gov/news/nif-jlf-user-groups-celebrate-milestones-new-capabilities" target="_blank" rel="noopener">LLNL, NIF user group news</a>, <a href="https://www.physicsworld.com/a/chinas-experimental-advanced-superconducting-tokamak-smashes-fusion-confinement-record/" target="_blank" rel="noopener">Physics World on EAST</a>, <a href="https://oenergetice.cz/en/nuclear-power/global-race-for-fusion-energy-frances-west-quickly-breaks-chinas-record" target="_blank" rel="noopener">Oenergetice on WEST</a> and <a href="https://euro-fusion.org/eurofusion-news/wendelstein-7-x-sets-world-record-for-long-plasma-triple-product/" target="_blank" rel="noopener">EUROfusion on Wendelstein 7-X</a>.</p>
<p>The records measure different things, so the rows can&#8217;t be ranked. EAST&#8217;s 1066 seconds <a href="https://www.physicsworld.com/a/chinas-experimental-advanced-superconducting-tokamak-smashes-fusion-confinement-record/" target="_blank" rel="noopener">broke its own 2023 record of 403 seconds</a>.</p>
<p>WEST then held plasma for <a href="https://oenergetice.cz/en/nuclear-power/global-race-for-fusion-energy-frances-west-quickly-breaks-chinas-record" target="_blank" rel="noopener">22 minutes and 17 seconds</a>. Oenergetice and <a href="https://www.neimagazine.com/analysis/nuclear-fusion-records-tumble/" target="_blank" rel="noopener">Nuclear Engineering International</a> give 1337 seconds, and Physics World&#8217;s update gives 1336.</p>
<p>Wendelstein 7-X is a stellarator, and its record is for the <a href="https://euro-fusion.org/eurofusion-news/wendelstein-7-x-sets-world-record-for-long-plasma-triple-product/" target="_blank" rel="noopener">triple product in long discharges</a>, with high performance sustained for <a href="https://euro-fusion.org/eurofusion-news/wendelstein-7-x-sets-world-record-for-long-plasma-triple-product/" target="_blank" rel="noopener">43 seconds</a>, so it isn&#8217;t a duration record.</p>
<p>That JET figure is energy released. ITER lists a different JET result as the magnetic-confinement power record, <a href="https://www.iter.org/proj/inafewlines" target="_blank" rel="noopener">16 megawatts of fusion power from 24 megawatts of heating in 1997</a>.</p>
<h2>When will ITER start running, and what will it cost?</h2>
<p>ITER&#8217;s July 2024 baseline moves the start of research operation to <a href="https://physicsworld.com/a/iter-fusion-reactor-hit-by-massive-decade-long-delay-and-e5bn-price-hike/" target="_blank" rel="noopener">2034</a>, almost a decade later than the 2016 plan&#8217;s first plasma in 2025.</p>
<table>
<thead>
<tr>
<th>Milestone</th>
<th>Year</th>
<th>Plan</th>
</tr>
</thead>
<tbody>
<tr>
<td>First plasma</td>
<td>2025</td>
<td>2016 baseline</td>
</tr>
<tr>
<td>Start of research operation</td>
<td>2034</td>
<td>July 2024 baseline</td>
</tr>
<tr>
<td>Full magnetic energy</td>
<td>2036</td>
<td>July 2024 baseline</td>
</tr>
<tr>
<td>Deuterium-tritium operation</td>
<td>2039</td>
<td>July 2024 baseline</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.iter.org/node/28514" target="_blank" rel="noopener">ITER Organization, press conference on the new baseline</a> and <a href="https://physicsworld.com/a/iter-fusion-reactor-hit-by-massive-decade-long-delay-and-e5bn-price-hike/" target="_blank" rel="noopener">Physics World on ITER&#8217;s new baseline</a>. ITER presented the July 2024 baseline as a working reference that its Members were still evaluating.</p>
<p>ITER is designed for <a href="https://www.iter.org/proj/inafewlines" target="_blank" rel="noopener">500 megawatts of fusion power from 50 megawatts of heating</a>, a Q of 10. It won&#8217;t convert that heat into electricity, so ITER won&#8217;t send any power to your meter.</p>
<p>ITER has no official total cost to quote. Many parts are built by its Members as in-kind contributions, and governments aren&#8217;t required to publish what they cost. The one official figure is ITER&#8217;s statement in July 2024 that the new plan adds <a href="https://www.iter.org/node/28514" target="_blank" rel="noopener">EUR 5 billion</a> for the ITER Organization, a figure the Members were still reviewing.</p>
<h2>How much money have fusion companies raised?</h2>
<p>Fusion companies reported raising <a href="https://www.innovationnewsnetwork.com/fusion-industry-scores-record-annual-funding-of-4-48bn/71676/" target="_blank" rel="noopener">$4.48 billion in the year to July 2026</a>, the highest total across FIA&#8217;s six annual surveys.</p>
<table>
<thead>
<tr>
<th>FIA report year</th>
<th>Cumulative funding (USD billion)</th>
<th>Raised in the prior 12 months (USD billion)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2022</td>
<td>4.8</td>
<td>2.8</td>
</tr>
<tr>
<td>2023</td>
<td>6.21</td>
<td>1.4</td>
</tr>
<tr>
<td>2024</td>
<td>7.1</td>
<td>0.9</td>
</tr>
<tr>
<td>2025</td>
<td>9.766</td>
<td>2.64</td>
</tr>
<tr>
<td>2026</td>
<td>14.24</td>
<td>4.48</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://world-nuclear-news.org/articles/investment-in-fusion-has-reached-usd6-21-billion," target="_blank" rel="noopener">FIA&#8217;s 2022 and 2023 reports via World Nuclear News</a>, <a href="https://dev.ans.org/news/article-6226/fia-publishes-snapshot-in-time-fusion-industry-report" target="_blank" rel="noopener">ANS Nuclear News</a>, <a href="https://world-nuclear-news.org/articles/funding-and-jobs-growing-fast-in-fusion,-says-key" target="_blank" rel="noopener">World Nuclear News on the 2024 report</a>, <a href="https://world-nuclear-news.org/articles/access-to-funding-remains-a-major-issue-for-fusion-says-fia" target="_blank" rel="noopener">World Nuclear News on the 2025 report</a> and <a href="https://www.power-technology.com/newsletters/nuclear-fusion-industry-attracts-record-annual-funding-of-4-48bn" target="_blank" rel="noopener">Power Technology on the 2026 report</a>. The 2022 row is the figure the 2023 report gave as the year before, and the 2022 new-funding figure is ANS&#8217;s.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/fusion-private-funding-2026-11-12.png" alt="Cumulative fusion company funding reported to FIA rose from $4.8 billion in the 2022 report to $14.24 billion in the 2026 report" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://world-nuclear-news.org/articles/access-to-funding-remains-a-major-issue-for-fusion-says-fia" target="_blank" rel="noopener">Fusion Industry Association surveys, via World Nuclear News</a>.</figcaption></figure>
<p>FIA counts the <a href="https://world-nuclear-news.org/articles/access-to-funding-remains-a-major-issue-for-fusion-says-fia" target="_blank" rel="noopener">private and public funding</a> its member companies report, and the 2026 survey covered 56 companies, <a href="https://www.innovationnewsnetwork.com/fusion-industry-scores-record-annual-funding-of-4-48bn/71676/" target="_blank" rel="noopener">up from 23 in 2021</a>. The largest rounds in the 2026 report were <a href="https://www.innovationnewsnetwork.com/fusion-industry-scores-record-annual-funding-of-4-48bn/71676/" target="_blank" rel="noopener">$863 million for Commonwealth Fusion Systems and $518 million for Proxima Fusion</a>.</p>
<p>Among those 56 firms, <a href="https://wnn.world-nuclear.org/articles/fusion-industry-raised-usd45-billion-over-past-year-report-says" target="_blank" rel="noopener">48% pursue magnetic confinement and 21% inertial confinement</a>. The IAEA reported investment <a href="https://smr.nucnet.org/news/investment-exceeds-usd10-billion-as-nuclear-fusion-becomes-cornerstone-of-national-energy-strategies-10-3-2025" target="_blank" rel="noopener">exceeding $10 billion</a> across nearly 40 countries in October 2025, a count with a different scope from FIA&#8217;s.</p>
<h2>What are the fusion companies promising?</h2>
<p>These are company targets, each dated to when it was reported, and none of them is a result yet.</p>
<table>
<thead>
<tr>
<th>Company</th>
<th>Target</th>
<th>Date reported</th>
</tr>
</thead>
<tbody>
<tr>
<td>Commonwealth Fusion Systems</td>
<td>SPARC shows more fusion energy than it uses (Q above 1) in 2027</td>
<td>Aug. 24, 2026</td>
</tr>
<tr>
<td>Commonwealth Fusion Systems</td>
<td>400 MW ARC plant in Virginia on the grid in the early 2030s</td>
<td>July 1, 2025</td>
</tr>
<tr>
<td>Google</td>
<td>Buys 200 MW from the first ARC plant</td>
<td>June 30, 2025</td>
</tr>
<tr>
<td>Helion</td>
<td>Orion plant online by 2028 at 50 MWe or more</td>
<td>July 31, 2025</td>
</tr>
<tr>
<td>Microsoft</td>
<td>Agreement to buy electricity from Helion&#8217;s first plant</td>
<td>May 2023</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://utilitydive.com/news/what-a-billion-dollar-funding-means-for-commonwealth-fusion-systems-and-its/828515" target="_blank" rel="noopener">Utility Dive on Commonwealth Fusion Systems</a>, <a href="https://world-nuclear-news.org/articles/google-backs-fusion-power" target="_blank" rel="noopener">World Nuclear News on Google and CFS</a>, <a href="https://www.ans.org/news/article-7164/google-announces-power-purchase-agreement-with-commonwealth-fusion/" target="_blank" rel="noopener">ANS Nuclear News on the Google deal</a> and <a href="https://world-nuclear-news.org/articles/helion-begins-work-on-fusion-power-plant" target="_blank" rel="noopener">World Nuclear News on Helion</a>.</p>
<p>Commonwealth Fusion Systems says SPARC will <a href="https://cfs.energy/technology/sparc" target="_blank" rel="noopener">produce more energy from fusion than it needs</a>, a plasma gain above 1, and its CEO said SPARC is <a href="https://utilitydive.com/news/what-a-billion-dollar-funding-means-for-commonwealth-fusion-systems-and-its/828515" target="_blank" rel="noopener">about 80% complete</a> in August 2026. Helion describes its Polaris prototype as <a href="https://www.helionenergy.com/polaris/" target="_blank" rel="noopener">built to demonstrate converting fusion energy into electricity</a>.</p>
<p>In FIA&#8217;s 2026 survey, <a href="https://wnn.world-nuclear.org/articles/fusion-industry-raised-usd45-billion-over-past-year-report-says" target="_blank" rel="noopener">71% of companies expect</a> a fusion plant to deliver power to the grid by the 2030s. DOE&#8217;s roadmap, released October 16, 2025, aims to <a href="https://www.energy.gov/articles/energy-department-announces-fusion-science-and-technology-roadmap-accelerate-commercial" target="_blank" rel="noopener">deliver commercial fusion power to the grid by the mid-2030s</a>. Utility Dive notes that <a href="https://utilitydive.com/news/what-a-billion-dollar-funding-means-for-commonwealth-fusion-systems-and-its/828515" target="_blank" rel="noopener">experts remain divided</a> on how soon fusion can be commercial.</p>
<h2>Where these numbers come from</h2>
<p>We calculated the target gains marked in the NIF table by dividing yield by laser energy, and nothing else on the page is computed. FIA&#8217;s totals are the funding its member companies report, they include public money, and they come through news coverage because FIA&#8217;s own report files wouldn&#8217;t load. World Nuclear News says the 2023 report&#8217;s 43 companies were up from <a href="https://world-nuclear-news.org/articles/investment-in-fusion-has-reached-usd6-21-billion," target="_blank" rel="noopener">27</a> and NucNet says up from <a href="https://www.nucnet.org/news/total-investment-surpasses-usd6-million-says-report-7-4-2023" target="_blank" rel="noopener">33</a>, so the page leaves the 2022 company count out.</p>
<h2>The fusion machines already built, funded or scheduled</h2>
<p>NIF&#8217;s laser is getting an upgrade. The US Department of Energy and the National Nuclear Security Administration approved a project in April 2026 to <a href="https://www.energy.gov/nnsa/articles/nnsa-and-lawrence-livermore-national-laboratory-advance-laser-upgrade-nuclear-0" target="_blank" rel="noopener">raise its peak laser energy from 2.2 to 2.6 megajoules</a>, which is aimed at nuclear stockpile work.</p>
<p>Helion began earthwork on the site of its Orion plant in Malaga, Washington, in <a href="https://world-nuclear-news.org/articles/helion-begins-work-on-fusion-power-plant" target="_blank" rel="noopener">July 2025</a>.</p>
<p>The open problem is the one ITER names itself, breeding tritium and recovering it reliably. Until a fusion plant feeds a grid, every nuclear kilowatt-hour on your bill comes from fission, the older technology that already competes with <a href="/solar-vs-nuclear-cost/">solar on cost</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>What is uranium?</title>
		<link>https://theenergycollective.com/uranium/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Tue, 17 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1120</guid>

					<description><![CDATA[Uranium is a dense, weakly radioactive metal, element 92 on the periodic table, and only 0.7% of natural uranium is U-235, the isotope that keeps a reactor&#8217;s chain&#8230;]]></description>
										<content:encoded><![CDATA[<p>Uranium is a dense, weakly radioactive metal, <a href="https://www.energy.gov/ne/nuclear-fuel-facts-uranium" target="_blank" rel="noopener">element 92</a> on the periodic table, and only <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/introduction/what-is-uranium-how-does-it-work" target="_blank" rel="noopener">0.7% of natural uranium</a> is U-235, the isotope that keeps a reactor&#8217;s chain reaction going. Nuclear plants supply <a href="https://pubs.usgs.gov/fs/2025/3057/fs20253057.pdf" target="_blank" rel="noopener">about 20% of US electricity</a>, and <a href="https://www.eia.gov/uranium/marketing/" target="_blank" rel="noopener">7% of the uranium delivered to US reactors in 2025</a> was mined in the United States. Most of the numbers here come from the US Energy Information Administration (EIA), the Department of Energy (DOE) and the World Nuclear Association (WNA), and each carries its own period.</p>
<h2>Top uranium statistics</h2>
<ul>
<li>Natural uranium is <a href="https://www.energy.gov/ne/nuclear-fuel-facts-uranium" target="_blank" rel="noopener">99.27% U-238 and 0.711% U-235</a>, according to DOE.</li>
<li>Enrichment raises the U-235 share to <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/uranium-resources/uranium-and-depleted-uranium" target="_blank" rel="noopener">3% to 5%</a> for most of the world&#8217;s reactors.</li>
<li>Kazatomprom, the world&#8217;s largest producer, mined <a href="https://sk.kz/ar2025/en/production-mining.html" target="_blank" rel="noopener">25.8 thousand tonnes of uranium (tU) in 2025</a>, about 20% of global primary output by its own estimate.</li>
<li>Canada was the top source for US reactors in 2025, supplying <a href="https://www.eia.gov/uranium/marketing/" target="_blank" rel="noopener">32% of deliveries</a>, with Kazakhstan close behind at 28%.</li>
<li>US mills and in-situ plants produced <a href="https://www.eia.gov/uranium/production/annual/" target="_blank" rel="noopener">2.1 million pounds of U3O8 in 2025</a>, up from 657,000 pounds in 2024.</li>
<li>The NRC says DOE stores <a href="https://www.nrc.gov/materials/fuel-cycle-fac/ur-deconversion/faq-depleted-ur-decon" target="_blank" rel="noopener">more than 700,000 metric tons of depleted uranium hexafluoride</a>, the leftover from enrichment.</li>
<li>Cameco&#8217;s month-end spot price peaked at <a href="https://www.cameco.com/invest/markets/uranium-price" target="_blank" rel="noopener">$136 per pound of U3O8 in June 2007</a> and was $91.55 on October 30, 2026.</li>
<li>The OECD Nuclear Energy Agency counted <a href="https://oecd-nea.org/jcms/pl_103308/sufficient-uranium-resources-exist-however-investments-needed-to-sustain-high-nuclear-energy-growth" target="_blank" rel="noopener">7,934,500 tU of identified recoverable resources</a> as of January 1, 2023.</li>
</ul>
<h2>What is uranium used for?</h2>
<p>Uranium is used mostly as reactor fuel, and nuclear plants make <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/introduction/what-is-uranium-how-does-it-work" target="_blank" rel="noopener">about 9% of the world&#8217;s electricity, over 2,500 TWh a year</a>, according to WNA. Roughly one in five kilowatt-hours on a US power bill comes from that fuel, which sits inside the US fleet of <a href="/how-many-nuclear-power-plants/">nuclear power plants</a>.</p>
<p>The same reactors also supply <a href="https://pubs.usgs.gov/fs/2025/3057/fs20253057.pdf" target="_blank" rel="noopener">district heating and seawater desalination</a>, USGS says. How much more uranium reactors will want depends on the <a href="/nuclear-outlook/">outlook for nuclear power</a>.</p>
<h2>What are the isotopes of uranium?</h2>
<p>U-238 carries <a href="https://www.nrc.gov/materials/fuel-cycle-fac/ur-enrichment" target="_blank" rel="noopener">three more neutrons than U-235</a>, and that small weight difference is what enrichment plants exploit.</p>
<p>The lighter isotope is the one reactors burn. When its nucleus splits, it <a href="https://www.nrc.gov/materials/fuel-cycle-fac/ur-enrichment" target="_blank" rel="noopener">produces both heat and extra neutrons</a>, and under controlled conditions those neutrons split neighboring atoms. Uranium itself is everywhere, since <a href="https://www.epa.gov/radiation/radionuclide-basics-uranium" target="_blank" rel="noopener">EPA says it&#8217;s present in virtually all soil, rock and water</a>, which includes the dirt in your yard.</p>
<p>Grades are named by how far the uranium has been enriched.</p>
<table>
<thead>
<tr>
<th>Material</th>
<th>U-235 share (%)</th>
<th>Where it&#8217;s used</th>
</tr>
</thead>
<tbody>
<tr>
<td>Depleted uranium</td>
<td>0.711 or less</td>
<td>Counterweights, shielding</td>
</tr>
<tr>
<td>Natural uranium</td>
<td>0.711</td>
<td>Feed for enrichment</td>
</tr>
<tr>
<td>Low enriched uranium (LEU)</td>
<td>0.711 to 20</td>
<td>Power reactors</td>
</tr>
<tr>
<td>Typical reactor fuel</td>
<td>3 to 5</td>
<td>Light-water reactors</td>
</tr>
<tr>
<td>High-assay low-enriched uranium (HALEU)</td>
<td>5 to under 20</td>
<td>Advanced reactors</td>
</tr>
<tr>
<td>Highly enriched uranium (HEU)</td>
<td>Above 20</td>
<td>Naval reactors, weapons, some research reactors</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.energy.gov/ne/nuclear-fuel-facts-uranium" target="_blank" rel="noopener">DOE, Nuclear Fuel Facts: Uranium</a>, <a href="https://www.energy.gov/ne/articles/what-high-assay-low-enriched-uranium-haleu" target="_blank" rel="noopener">DOE, What is HALEU</a>.</p>
<h2>How is uranium enriched?</h2>
<p>Commercial enrichment lifts U-235 to <a href="https://www.nrc.gov/materials/fuel-cycle-fac/ur-enrichment" target="_blank" rel="noopener">3% to 5%</a>, the grade most reactors burn. Mined uranium is converted into uranium hexafluoride gas before it goes in, because the gas works at a suitable temperature for the machines.</p>
<p>Making one kilogram of 5% fuel takes <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/conversion-enrichment-and-fabrication/uranium-enrichment" target="_blank" rel="noopener">7.9 separative work units (SWU) at a 0.25% tails assay</a>, and SWU is the unit enrichers use to measure their work.</p>
<table>
<thead>
<tr>
<th>Operator</th>
<th>2022 capacity (thousand SWU a year)</th>
<th>2025 capacity (thousand SWU a year)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Rosatom</td>
<td>27,100</td>
<td>29,133</td>
</tr>
<tr>
<td>Urenco</td>
<td>17,300</td>
<td>17,300</td>
</tr>
<tr>
<td>CNNC (estimate)</td>
<td>10,613</td>
<td>13,789</td>
</tr>
<tr>
<td>Orano</td>
<td>7,500</td>
<td>7,500</td>
</tr>
<tr>
<td>Other</td>
<td>128</td>
<td>355</td>
</tr>
<tr>
<td>World total</td>
<td>62,641</td>
<td>68,076</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/conversion-enrichment-and-fabrication/uranium-enrichment" target="_blank" rel="noopener">World Nuclear Association, Uranium Enrichment</a>. CNNC&#8217;s figures are the association&#8217;s estimate.</p>
<p>US reactor owners bought <a href="https://www.eia.gov/uranium/marketing/" target="_blank" rel="noopener">13 million SWU in 2025 at $108.70 each</a>, and 77% of that work came from foreign plants. Centrus says its Piketon, Ohio, plant is the <a href="https://www.centrusenergy.com/" target="_blank" rel="noopener">only US facility licensed by the NRC to produce HALEU</a>.</p>
<h2>What is depleted uranium?</h2>
<p>Depleted uranium is the leftover from enrichment. The NRC gives the arithmetic: <a href="https://www.nrc.gov/materials/fuel-cycle-fac/ur-deconversion/faq-depleted-ur-decon" target="_blank" rel="noopener">85 kg of enriched fuel and 915 kg of depleted uranium</a> from every 1,000 kg of natural uranium.</p>
<p>Most of it sits in storage. Depleted uranium is <a href="https://www.nrc.gov/materials/fuel-cycle-fac/ur-deconversion/faq-depleted-ur-decon" target="_blank" rel="noopener">mostly kept as hexafluoride in 14-ton cylinders</a> near enrichment plants. DOE&#8217;s Portsmouth site in Ohio and Paducah site in Kentucky hold <a href="https://www.energy.gov/em/articles/pppos-cylinder-management-helps-shape-nuclear-renaissance" target="_blank" rel="noopener">more than 67,000 cylinders</a> of it.</p>
<p>Depleted uranium is <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/uranium-resources/uranium-and-depleted-uranium" target="_blank" rel="noopener">1.7 times as dense as lead</a>, which is why it ends up in counterweights, shielding and military penetrators.</p>
<h2>Where is uranium mined?</h2>
<p>World mining output reached <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/mining-of-uranium/world-uranium-mining-production" target="_blank" rel="noopener">60,213 tU in 2024</a>, up from 47,731 tU in 2020.</p>
<table>
<thead>
<tr>
<th>Country</th>
<th>2020 (tU)</th>
<th>2024 (tU)</th>
<th>2024 share of world (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Kazakhstan</td>
<td>19,477</td>
<td>23,270</td>
<td>38.6</td>
</tr>
<tr>
<td>Canada</td>
<td>3,885</td>
<td>14,309</td>
<td>23.8</td>
</tr>
<tr>
<td>Namibia</td>
<td>5,413</td>
<td>7,333</td>
<td>12.2</td>
</tr>
<tr>
<td>Australia</td>
<td>6,203</td>
<td>4,598</td>
<td>7.6</td>
</tr>
<tr>
<td>Uzbekistan (estimate)</td>
<td>3,500</td>
<td>4,000</td>
<td>6.6</td>
</tr>
<tr>
<td>Russia</td>
<td>2,846</td>
<td>2,738</td>
<td>4.5</td>
</tr>
<tr>
<td>China (estimate)</td>
<td>1,885</td>
<td>1,600</td>
<td>2.7</td>
</tr>
<tr>
<td>Niger</td>
<td>2,991</td>
<td>962</td>
<td>1.6</td>
</tr>
<tr>
<td>United States</td>
<td>6</td>
<td>260</td>
<td>0.4</td>
</tr>
<tr>
<td>World total</td>
<td>47,731</td>
<td>60,213</td>
<td>100</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/mining-of-uranium/world-uranium-mining-production" target="_blank" rel="noopener">WNA, World Uranium Mining Production</a>. Shares are calculated from the association&#8217;s tonnes.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/uranium-production-by-country-2026-11-12.png" alt="Kazakhstan mined 23,270 tonnes of uranium in 2024, Canada 14,309 and Namibia 7,333, while the United States mined 260 tonnes" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/mining-of-uranium/world-uranium-mining-production" target="_blank" rel="noopener">WNA, World Uranium Mining Production</a>.</figcaption></figure>
<p>Cameco reported 2025 output of <a href="https://www.world-nuclear-news.org/articles/Cameco-Kazatomprom-release-2025-Figures" target="_blank" rel="noopener">19.1 million pounds of U3O8 at Cigar Lake and 15.1 million at McArthur River and Key Lake</a>, counting each site at 100%. Kazatomprom&#8217;s 2025 production was <a href="https://sk.kz/ar2025/en/production-mining.html" target="_blank" rel="noopener">25.8 thousand tonnes on a 100% basis</a>, about 20% of global primary output by the company&#8217;s own estimate.</p>
<p>Company figures use a different basis than the country table. The OECD and IAEA Red Book counted <a href="https://world-nuclear-news.org/articles/invest-now-to-secure-long-term-uranium-future-red-book-says" target="_blank" rel="noopener">54,345 tU for 2023</a>, a count that rests on country reports and estimates like the association&#8217;s.</p>
<p>The Red Book put identified recoverable resources at <a href="https://oecd-nea.org/jcms/pl_103308/sufficient-uranium-resources-exist-however-investments-needed-to-sustain-high-nuclear-energy-growth" target="_blank" rel="noopener">7,934,500 tU as of January 1, 2023</a>, recoverable at costs from $40 to $260 per kgU. Australia held <a href="https://www.ans.org/news/article-6925/latest-red-book-stresses-need-for-boosts-in-uranium-development" target="_blank" rel="noopener">28% of that total and Kazakhstan 14%</a>.</p>
<p>So the resource ranking doesn&#8217;t match the mining ranking. The agencies say the resource base is <a href="https://oecd-nea.org/jcms/pl_103308/sufficient-uranium-resources-exist-however-investments-needed-to-sustain-high-nuclear-energy-growth" target="_blank" rel="noopener">sufficient for both low and high nuclear growth through 2050 and beyond</a>, if mining investment keeps pace, though EIA <a href="https://theenergycollective.com/is-nuclear-energy-renewable/">classes uranium as nonrenewable</a>.</p>
<h2>Where do US reactors get their uranium?</h2>
<p>US reactor owners took delivery of <a href="https://www.eia.gov/uranium/marketing/pdf/umar.pdf" target="_blank" rel="noopener">46.9 million pounds of U3O8 equivalent in 2025</a>, and if a nuclear plant feeds your local grid, the fuel inside it was most likely mined abroad.</p>
<table>
<thead>
<tr>
<th>Origin</th>
<th>2021</th>
<th>2022</th>
<th>2023</th>
<th>2024</th>
<th>2025</th>
</tr>
</thead>
<tbody>
<tr>
<td>Canada</td>
<td>6,908</td>
<td>11,110</td>
<td>13,162</td>
<td>18,600</td>
<td>15,207</td>
</tr>
<tr>
<td>Kazakhstan</td>
<td>16,557</td>
<td>10,019</td>
<td>10,622</td>
<td>12,375</td>
<td>13,331</td>
</tr>
<tr>
<td>Australia</td>
<td>6,712</td>
<td>3,620</td>
<td>10,605</td>
<td>8,577</td>
<td>7,077</td>
</tr>
<tr>
<td>Uzbekistan</td>
<td>2,499</td>
<td>4,438</td>
<td>4,887</td>
<td>4,503</td>
<td>3,258</td>
</tr>
<tr>
<td>Namibia</td>
<td>3,214</td>
<td>1,961</td>
<td>1,546</td>
<td>2,206</td>
<td>1,652</td>
</tr>
<tr>
<td>Russia</td>
<td>6,314</td>
<td>4,781</td>
<td>6,042</td>
<td>2,031</td>
<td>W</td>
</tr>
<tr>
<td>United States</td>
<td>2,474</td>
<td>2,052</td>
<td>2,386</td>
<td>4,331</td>
<td>3,376</td>
</tr>
<tr>
<td>Total foreign</td>
<td>44,263</td>
<td>38,467</td>
<td>49,239</td>
<td>51,590</td>
<td>43,495</td>
</tr>
<tr>
<td>Total purchases</td>
<td>46,736</td>
<td>40,519</td>
<td>51,625</td>
<td>55,921</td>
<td>46,871</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/uranium/marketing/pdf/umar.pdf" target="_blank" rel="noopener">EIA, 2025 Uranium Marketing Annual Report, Table 3</a>. Figures are thousand pounds of U3O8 equivalent delivered in each year, by country where the uranium was mined. W means EIA withheld the figure to avoid disclosing company data.</p>
<p><a href="https://www.eia.gov/energyexplained/nuclear/where-our-uranium-comes-from.php" target="_blank" rel="noopener">Russia supplied 12% of US uranium purchases in 2022</a>, and EIA withheld its 2025 figure. Origin means the country where the ore was mined. It&#8217;s a different thing from the seller.</p>
<h2>How much uranium does the US mine?</h2>
<p>US mills and in-situ plants produced <a href="https://www.eia.gov/uranium/production/annual/" target="_blank" rel="noopener">2.1 million pounds of U3O8 in 2025</a>, the most since 2017 in the table below.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>US uranium concentrate production (thousand pounds U3O8)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2011</td>
<td>3,991</td>
</tr>
<tr>
<td>2012</td>
<td>4,146</td>
</tr>
<tr>
<td>2013</td>
<td>4,659</td>
</tr>
<tr>
<td>2014</td>
<td>4,891</td>
</tr>
<tr>
<td>2015</td>
<td>3,343</td>
</tr>
<tr>
<td>2016</td>
<td>2,916</td>
</tr>
<tr>
<td>2017</td>
<td>2,443</td>
</tr>
<tr>
<td>2018</td>
<td>1,447</td>
</tr>
<tr>
<td>2019</td>
<td>174</td>
</tr>
<tr>
<td>2020</td>
<td>W</td>
</tr>
<tr>
<td>2021</td>
<td>21</td>
</tr>
<tr>
<td>2022</td>
<td>194</td>
</tr>
<tr>
<td>2023</td>
<td>50</td>
</tr>
<tr>
<td>2024</td>
<td>657</td>
</tr>
<tr>
<td>2025</td>
<td>2,109</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/uranium/production/annual/pdf/uprodshiptbl3.pdf" target="_blank" rel="noopener">EIA, 2025 Domestic Uranium Production Report, Table 3</a>. W means EIA withheld the figure to avoid disclosing company data.</p>
<p>EIA&#8217;s earlier reports show <a href="https://www.eia.gov/uranium/production/annual/archive/dupr2013.pdf" target="_blank" rel="noopener">3.1 million pounds produced in 1993 and 6.3 million in 1996</a>. The World Nuclear Association puts the US peak at <a href="https://world-nuclear.org/information-library/country-profiles/countries-t-z/usa-nuclear-fuel-cycle" target="_blank" rel="noopener">16,800 tU in 1980, when over 250 mines were operating</a>.</p>
<p>At the end of 2025, EIA counted <a href="https://www.eia.gov/uranium/production/annual/" target="_blank" rel="noopener">five in-situ recovery plants operating with 13.3 million pounds a year of capacity</a>, five more on standby and seven planned in three states. EPA describes the method as <a href="https://www.epa.gov/radtown/radioactive-waste-uranium-mining-and-milling" target="_blank" rel="noopener">pumping chemicals into groundwater to dissolve uranium</a> from porous rock. If a project is proposed in your county, ask where the wells and the water monitoring sit.</p>
<h2>Is uranium dangerous?</h2>
<p>Uranium is weakly radioactive. EPA says it decays by alpha particles, so <a href="https://www.epa.gov/radiation/radionuclide-basics-uranium" target="_blank" rel="noopener">the skin blocks external exposure</a>, and that <a href="https://www.epa.gov/radiation/radionuclide-basics-uranium" target="_blank" rel="noopener">ingestion is a hazard because of its chemical properties</a>.</p>
<p>Mining leaves the bigger problem. EPA reports that the decay products separated from uranium during milling <a href="https://www.epa.gov/radtown/radioactive-waste-uranium-mining-and-milling" target="_blank" rel="noopener">hold 80% to 90% of the radioactivity in the ore</a>, That is why mill tailings are stored in specially designed disposal cells. Reactors carry their own risks, and whether <a href="/is-nuclear-power-safe/">nuclear power is safe</a> is a separate question.</p>
<h2>What has uranium cost over time?</h2>
<p>Uranium doesn&#8217;t trade on an open exchange, so quoted prices are industry averages. Cameco&#8217;s month-end spot price ended 2025 at <a href="https://www.cameco.com/invest/markets/uranium-price" target="_blank" rel="noopener">$81.55 per pound of U3O8</a> and stood at $91.55 on October 30, 2026.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>Cameco&#8217;s month-end spot price, last of year (USD per lb U3O8)</th>
<th>Highest month-end</th>
<th>Lowest month-end</th>
</tr>
</thead>
<tbody>
<tr>
<td>2004</td>
<td>20.60</td>
<td>20.60</td>
<td>15.55</td>
</tr>
<tr>
<td>2005</td>
<td>36.38</td>
<td>36.38</td>
<td>21.10</td>
</tr>
<tr>
<td>2006</td>
<td>72.00</td>
<td>72.00</td>
<td>37.50</td>
</tr>
<tr>
<td>2007</td>
<td>90.00</td>
<td>136.00</td>
<td>75.00</td>
</tr>
<tr>
<td>2008</td>
<td>52.50</td>
<td>78.00</td>
<td>45.00</td>
</tr>
<tr>
<td>2009</td>
<td>44.50</td>
<td>51.50</td>
<td>42.00</td>
</tr>
<tr>
<td>2010</td>
<td>62.25</td>
<td>62.25</td>
<td>40.75</td>
</tr>
<tr>
<td>2011</td>
<td>51.88</td>
<td>72.63</td>
<td>49.13</td>
</tr>
<tr>
<td>2012</td>
<td>43.38</td>
<td>52.13</td>
<td>41.75</td>
</tr>
<tr>
<td>2013</td>
<td>34.50</td>
<td>43.88</td>
<td>34.50</td>
</tr>
<tr>
<td>2014</td>
<td>35.50</td>
<td>39.50</td>
<td>28.23</td>
</tr>
<tr>
<td>2015</td>
<td>34.23</td>
<td>39.45</td>
<td>34.23</td>
</tr>
<tr>
<td>2016</td>
<td>20.25</td>
<td>34.70</td>
<td>18.00</td>
</tr>
<tr>
<td>2017</td>
<td>22.32</td>
<td>24.50</td>
<td>19.60</td>
</tr>
<tr>
<td>2018</td>
<td>27.75</td>
<td>29.10</td>
<td>21.00</td>
</tr>
<tr>
<td>2019</td>
<td>24.93</td>
<td>28.90</td>
<td>24.05</td>
</tr>
<tr>
<td>2020</td>
<td>30.20</td>
<td>33.93</td>
<td>24.63</td>
</tr>
<tr>
<td>2021</td>
<td>42.05</td>
<td>45.75</td>
<td>27.98</td>
</tr>
<tr>
<td>2022</td>
<td>47.68</td>
<td>58.20</td>
<td>43.08</td>
</tr>
<tr>
<td>2023</td>
<td>91.00</td>
<td>91.00</td>
<td>50.48</td>
</tr>
<tr>
<td>2024</td>
<td>72.63</td>
<td>100.25</td>
<td>72.63</td>
</tr>
<tr>
<td>2025</td>
<td>81.55</td>
<td>82.63</td>
<td>64.23</td>
</tr>
<tr>
<td>2026 (to October 30)</td>
<td>91.55</td>
<td>94.28</td>
<td>84.18</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.cameco.com/invest/markets/uranium-price" target="_blank" rel="noopener">Cameco, Uranium Price</a>, which averages month-end prices published by UxC and TradeTech. Prices are nominal dollars.</p>
<p>USGS says the spot price <a href="https://pubs.usgs.gov/fs/2025/3057/fs20253057.pdf" target="_blank" rel="noopener">rose to a 17-year high of $106 per pound in January 2024</a>, while Cameco&#8217;s month-end figure for that January is $100.25. Cameco&#8217;s table holds month-end averages, which can sit below a peak inside the month.</p>
<p>The price US reactor owners paid is a separate series. It&#8217;s a weighted average of deliveries in each year, and most of it comes from older long-term contracts.</p>
<table>
<thead>
<tr>
<th>Delivery year</th>
<th>Purchases (thousand lb U3O8e)</th>
<th>EIA weighted-average price paid (USD per lb U3O8e)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2021</td>
<td>46,736</td>
<td>33.91</td>
</tr>
<tr>
<td>2022</td>
<td>40,519</td>
<td>39.08</td>
</tr>
<tr>
<td>2023</td>
<td>51,625</td>
<td>43.80</td>
</tr>
<tr>
<td>2024</td>
<td>55,921</td>
<td>52.71</td>
</tr>
<tr>
<td>2025</td>
<td>46,871</td>
<td>58.46</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/uranium/marketing/pdf/umar.pdf" target="_blank" rel="noopener">EIA, 2025 Uranium Marketing Annual Report, Table 3</a>. Dollars are nominal.</p>
<h2>Where these numbers come from</h2>
<p>We calculated the 2024 country shares. EIA&#8217;s 2.1 million pounds converts to <a href="https://www.eia.gov/uranium/production/annual/pdf/uprodshiptbl3.pdf" target="_blank" rel="noopener">about 811 tU</a>. The rate is 0.3846 tU per thousand pounds, from <a href="https://www.world-nuclear-news.org/articles/Cameco-Kazatomprom-release-2025-Figures" target="_blank" rel="noopener">Cameco&#8217;s 21.0 million pounds, which equal 8,078 tU</a>. EIA reports pounds of uranium oxide and WNA reports tonnes of uranium, so the two need that step to compare.</p>
<p>The two price tables measure different things and are kept apart on purpose. We left out forecasts of future prices.</p>
<h2>Kazakhstan&#8217;s 2026 output and the new US enrichment plants</h2>
<p>Kazatomprom expects to produce <a href="https://www.world-nuclear-news.org/articles/Cameco-Kazatomprom-release-2025-Figures" target="_blank" rel="noopener">27,500 to 29,000 tU in 2026</a> on a 100% basis. DOE estimates US demand for HALEU could reach <a href="https://www.energy.gov/ne/articles/what-high-assay-low-enriched-uranium-haleu" target="_blank" rel="noopener">50 metric tons a year by 2035</a>. In the US, the NRC accepted Orano&#8217;s application for its Tennessee enrichment plant for review in <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/conversion-enrichment-and-fabrication/uranium-enrichment" target="_blank" rel="noopener">May 2026</a>.</p>
<p>The material for one of those projects already sits in Ohio and Kentucky. DOE said in April 2026 that it is providing General Matter <a href="https://www.energy.gov/em/articles/pppos-cylinder-management-helps-shape-nuclear-renaissance" target="_blank" rel="noopener">at least 7,600 cylinders</a> as feedstock and plans about 25,000 for Global Laser Enrichment&#8217;s planned plant beside the Paducah site.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Is nuclear energy renewable?</title>
		<link>https://theenergycollective.com/is-nuclear-energy-renewable/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 16 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1118</guid>

					<description><![CDATA[No, nuclear energy isn&#8217;t renewable, because it runs on uranium, which EIA classes as a nonrenewable energy source, but reactors made about 19% of US electricity in 2023&#8230;]]></description>
										<content:encoded><![CDATA[<p>No, nuclear energy isn&#8217;t renewable, because it runs on uranium, which EIA classes as <a href="https://www.eia.gov/energyexplained/nuclear/" target="_blank" rel="noopener">a nonrenewable energy source</a>, but reactors made <a href="https://www.eia.gov/tools/faqs/faq.php?id=427&amp;t=3" target="_blank" rel="noopener">about 19% of US electricity in 2023</a> with very little carbon. Several state laws count it as clean energy next to wind and solar. The figures come mostly from EIA, the IPCC and the OECD Nuclear Energy Agency, and each one says the period it covers.</p>
<h2>Top nuclear energy and renewability statistics</h2>
<ul>
<li>EIA lists uranium as <a href="https://www.eia.gov/energyexplained/nuclear/" target="_blank" rel="noopener">a nonrenewable energy source</a> and says reactors use U-235, an isotope that&#8217;s relatively rare.</li>
<li>The OECD Nuclear Energy Agency and IAEA counted <a href="https://world-nuclear-news.org/articles/red-book-confident-on-uranium-resources-to-meet-future-growth" target="_blank" rel="noopener">more than 8.1 million tonnes</a> of identified uranium resources on 1 January 2025.</li>
<li>At the 64,500 tonnes a year reactors needed on that date, those resources work out to <a href="https://oecd-nea.org/jcms/pl_121582/adequate-uranium-resources-available-but-sustained-investment-essential-to-support-global-nuclear-capacity-growth" target="_blank" rel="noopener">about 125 years of supply</a>.</li>
<li>UNECE put nuclear&#8217;s lifecycle emissions at <a href="https://world-nuclear.org/information-library/energy-and-the-environment/carbon-dioxide-emissions-from-electricity.aspx" target="_blank" rel="noopener">5.1 to 6.4 grams of CO2 equivalent per kWh in 2022</a>.</li>
<li>Nuclear made <a href="https://ember-energy.org/latest-insights/global-electricity-review-2025/" target="_blank" rel="noopener">9.0% of the world&#8217;s electricity in 2024</a>, the lowest share in 45 years.</li>
<li>About <a href="https://www.eia.gov/tools/faqs/faq.php?id=427&amp;t=3" target="_blank" rel="noopener">19% of US electricity in 2023 came from nuclear</a> and about 21% from renewables.</li>
<li>Minnesota&#8217;s 2023 law requires <a href="https://www.cesa.org/projects/100-clean-energy-collaborative/guide/table-of-100-clean-energy-states/" target="_blank" rel="noopener">100% carbon-free electricity by 2040</a>, counting nuclear alongside renewables.</li>
<li>PNNL says the oceans hold <a href="https://www.pnnl.gov/news-media/mining-uranium-seawater" target="_blank" rel="noopener">more than four billion tons of uranium</a>, and an Oak Ridge adsorbent has pulled out 5.2 grams per kilogram in 49 days.</li>
<li>India&#8217;s Prototype Fast Breeder Reactor reached <a href="https://static.pib.gov.in/WriteReadData/specificdocs/documents/2026/apr/doc202647842201.pdf" target="_blank" rel="noopener">first criticality on 6 April 2026</a>.</li>
</ul>
<h2>How do official bodies classify nuclear energy?</h2>
<p>EIA lists nuclear as its own primary energy source, <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">apart from fossil fuels and renewables</a>, and the UN defines renewable energy as <a href="https://www.un.org/en/climatechange/what-is-renewable-energy" target="_blank" rel="noopener">energy from natural sources that nature refills faster than people use it</a>. Wind and sunlight make <a href="/renewable-energy/">the usual list of renewables</a>, and uranium isn&#8217;t on EIA&#8217;s list.</p>
<table>
<thead>
<tr>
<th>Body</th>
<th>How it treats nuclear</th>
<th>Basis</th>
</tr>
</thead>
<tbody>
<tr>
<td>EIA</td>
<td>Uranium is nonrenewable</td>
<td>Energy Explained</td>
</tr>
<tr>
<td>EIA, on state programs</td>
<td>Clean energy standards may include nuclear</td>
<td>Portfolio standards page</td>
</tr>
<tr>
<td>EU Taxonomy</td>
<td>Transitional activity under strict conditions</td>
<td>Parliament vote, 6 July 2022</td>
</tr>
<tr>
<td>Virginia</td>
<td>Carbon-free energy includes nuclear</td>
<td>Code section 1-208.1</td>
</tr>
<tr>
<td>Minnesota</td>
<td>Counts toward 100% carbon-free by 2040</td>
<td>SF 4, 2023</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/energyexplained/nuclear/" target="_blank" rel="noopener">EIA, Nuclear explained</a>, <a href="https://www.eia.gov/energyexplained/renewable-sources/portfolio-standards.php" target="_blank" rel="noopener">EIA, Renewable portfolio and clean energy standards</a>, <a href="https://cyprus.representation.ec.europa.eu/news/eu-taxonomy-commission-welcomes-result-todays-vote-european-parliament-complementary-delegated-act-2022-07-06_en" target="_blank" rel="noopener">European Commission</a>, <a href="https://law.lis.virginia.gov/vacode/title1/chapter2.1/section1-208.1" target="_blank" rel="noopener">Code of Virginia</a>, <a href="https://www.cesa.org/projects/100-clean-energy-collaborative/guide/table-of-100-clean-energy-states/" target="_blank" rel="noopener">Clean Energy States Alliance</a> and EIA&#8217;s <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">U.S. energy facts</a> page.</p>
<p>The EU label is for investors. The Commission said the act ensures <a href="https://cyprus.representation.ec.europa.eu/news/eu-taxonomy-commission-welcomes-result-todays-vote-european-parliament-complementary-delegated-act-2022-07-06_en" target="_blank" rel="noopener">private investments in gas and nuclear meet strict criteria</a>, and it sits apart from the EU&#8217;s renewables count, which reached <a href="https://energy.ec.europa.eu/topics/renewable-energy/renewable-energy-directive-targets-and-rules/renewable-energy-directive_en" target="_blank" rel="noopener">47.2% of EU electricity production in 2025</a>. Reactors that qualify are part of Europe&#8217;s wider <a href="/nuclear-outlook/">nuclear power outlook</a>.</p>
<h2>Which US states count nuclear as clean energy?</h2>
<p>EIA says <a href="https://www.eia.gov/energyexplained/renewable-sources/portfolio-standards.php" target="_blank" rel="noopener">over half of US states</a> have standards or voluntary goals for renewable or clean energy, and no federal standard exists. The wording of each law decides whether a reactor counts.</p>
<table>
<thead>
<tr>
<th>State</th>
<th>Law</th>
<th>Target</th>
<th>Nuclear</th>
</tr>
</thead>
<tbody>
<tr>
<td>Minnesota</td>
<td>SF 4, 2023</td>
<td>100% carbon-free by 2040</td>
<td>Counts</td>
</tr>
<tr>
<td>Virginia</td>
<td>Code 1-208.1</td>
<td>Clean energy definition</td>
<td>Included</td>
</tr>
<tr>
<td>Illinois</td>
<td>SB2408, 2021</td>
<td>100% clean energy by 2050</td>
<td>Zero Emission Credits program</td>
</tr>
<tr>
<td>New York</td>
<td>Clean Energy Standard</td>
<td>Zero-emissions electricity by 2040</td>
<td>Existing plants eligible</td>
</tr>
<tr>
<td>Vermont</td>
<td>H289, 2024</td>
<td>100% renewable by 2035</td>
<td>Standard is labeled renewable</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.cesa.org/projects/100-clean-energy-collaborative/guide/table-of-100-clean-energy-states/" target="_blank" rel="noopener">Clean Energy States Alliance, Table of 100% Clean Energy States</a>, <a href="https://law.lis.virginia.gov/vacode/title1/chapter2.1/section1-208.1" target="_blank" rel="noopener">Code of Virginia</a> and <a href="https://www.nga.org/wp-content/uploads/2019/04/Policy-Update-Nuclear-Energy-Revised-May-14-2019.pdf" target="_blank" rel="noopener">National Governors Association</a>, 2019. The New York and Illinois nuclear entries rest on the NGA paper.</p>
<p>New York was <a href="https://www.nga.org/wp-content/uploads/2019/04/Policy-Update-Nuclear-Energy-Revised-May-14-2019.pdf" target="_blank" rel="noopener">the first state to include existing nuclear generation</a> as an eligible resource, and Illinois adopted a similar approach with Zero Emission Credits. Illinois has <a href="https://www.eia.gov/tools/faqs/faq.php?id=207&amp;t=3" target="_blank" rel="noopener">11 reactors, the most of any state</a>, so if you live there, the Zero Emission Credits program covers plants near you. If your utility advertises a &#8220;clean&#8221; plan, check whether your state&#8217;s law says clean or renewable, because the two words can count different plants.</p>
<h2>How much uranium is left?</h2>
<p>The OECD Nuclear Energy Agency and IAEA put <a href="https://theenergycollective.com/uranium/">identified uranium resources</a> at <a href="https://oecd-nea.org/jcms/pl_121582/adequate-uranium-resources-available-but-sustained-investment-essential-to-support-global-nuclear-capacity-growth" target="_blank" rel="noopener">more than 8.1 million tonnes</a> on 1 January 2025, up 2.1% on the previous edition.</p>
<table>
<thead>
<tr>
<th>Measure</th>
<th>Value</th>
<th>Date</th>
</tr>
</thead>
<tbody>
<tr>
<td>Identified resources, below USD 260/kgU (tU)</td>
<td>More than 8,100,000</td>
<td>1 January 2025</td>
</tr>
<tr>
<td>Identified resources, below USD 130/kgU (tU)</td>
<td>5,864,500</td>
<td>1 January 2025</td>
</tr>
<tr>
<td>Identified resources, USD 40 to 260/kgU (tU)</td>
<td>7,934,500</td>
<td>1 January 2023</td>
</tr>
<tr>
<td>Reactor use per year (tU)</td>
<td>64,500</td>
<td>1 January 2025</td>
</tr>
<tr>
<td>Projected use per year, 2050 low case (tU)</td>
<td>84,800</td>
<td>2050</td>
</tr>
<tr>
<td>Projected use per year, 2050 high case (tU)</td>
<td>143,900</td>
<td>2050</td>
</tr>
<tr>
<td>Years of supply at today&#8217;s use</td>
<td>About 125</td>
<td>Computed</td>
</tr>
<tr>
<td>Years of supply at 2050 high-case use</td>
<td>About 56</td>
<td>Computed</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://oecd-nea.org/jcms/pl_121582/adequate-uranium-resources-available-but-sustained-investment-essential-to-support-global-nuclear-capacity-growth" target="_blank" rel="noopener">OECD Nuclear Energy Agency, Uranium 2026 release</a>, <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/uranium-resources/supply-of-uranium" target="_blank" rel="noopener">World Nuclear Association</a> and <a href="https://oecd-nea.org/jcms/pl_103308/sufficient-uranium-resources-exist-however-investments-needed-to-sustain-high-nuclear-energy-growth" target="_blank" rel="noopener">OECD Nuclear Energy Agency, Uranium 2024 release</a>. The two year figures are computed from those inputs.</p>
<p>The cost cut-off changes the total. Resources recoverable below USD 130 per kilogram are <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/uranium-resources/supply-of-uranium" target="_blank" rel="noopener">5,864,500 tonnes</a>, and the larger figure adds ore that costs more to dig out. Neither number is a depletion date, because both count deposits that have already been identified.</p>
<p>The Red Book&#8217;s own version of the question uses cumulative demand. If capacity stayed at its 2050 level, demand <a href="https://www.ans.org/news/article-6925/latest-red-book-stresses-need-for-boosts-in-uranium-development" target="_blank" rel="noopener">could pass the roughly 8 million tonne resource base</a> by the 2080s in the low-growth case or the 2110s in the high-growth case. A 2016 Scientific American article quoted a DOE official at <a href="https://www.scientificamerican.com/article/uranium-extraction-from-seawater-takes-a-major-step-forward/" target="_blank" rel="noopener">100 to 200 years</a>, an older and looser estimate that sits in the same range.</p>
<p>The table below follows uranium output and exploration spending. A new uranium project takes <a href="https://www.ans.org/news/2026-09-15/article-8391/newest-red-book-notes-the-need-for-more-u-investment/" target="_blank" rel="noopener">15 to 20 years</a> to develop, so output can&#8217;t jump to match a bigger fleet.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>Mine production (tU)</th>
<th>Exploration and development spending (USD million)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2020</td>
<td>n/a</td>
<td>380</td>
</tr>
<tr>
<td>2022</td>
<td>49,490</td>
<td>800</td>
</tr>
<tr>
<td>2023</td>
<td>54,345</td>
<td>840 (preliminary)</td>
</tr>
<tr>
<td>2024</td>
<td>61,924</td>
<td>n/a</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://world-nuclear-news.org/articles/invest-now-to-secure-long-term-uranium-future-red-book-says" target="_blank" rel="noopener">World Nuclear News, 2025</a>, <a href="https://world-nuclear-news.org/articles/red-book-confident-on-uranium-resources-to-meet-future-growth" target="_blank" rel="noopener">World Nuclear News, 2026</a> and <a href="https://www.ans.org/news/article-6925/latest-red-book-stresses-need-for-boosts-in-uranium-development" target="_blank" rel="noopener">American Nuclear Society</a>. Production of 61,924 tU in 2024 was the highest since 2006.</p>
<h2>Can breeder reactors make nuclear effectively renewable?</h2>
<p>DOE says fast reactors that continuously recycle their fuel would need <a href="https://www.energy.gov/node/4851874" target="_blank" rel="noopener">100 times less uranium</a> for the same energy as water-cooled reactors. The same page says recycling could cut <a href="https://www.energy.gov/node/4851874" target="_blank" rel="noopener">waste by 90%</a>. That&#8217;s a ceiling for the technology, and few machines have tried to reach it.</p>
<table>
<thead>
<tr>
<th>Reactor</th>
<th>Country</th>
<th>Milestone</th>
<th>Date</th>
</tr>
</thead>
<tbody>
<tr>
<td>Experimental Breeder Reactor-II</td>
<td>United States</td>
<td>Ceased operations</td>
<td>1994</td>
</tr>
<tr>
<td>BN-800</td>
<td>Russia</td>
<td>First criticality</td>
<td>June 2014</td>
</tr>
<tr>
<td>BN-800</td>
<td>Russia</td>
<td>Full MOX core</td>
<td>Since 2022</td>
</tr>
<tr>
<td>Prototype Fast Breeder Reactor</td>
<td>India</td>
<td>Construction began</td>
<td>2004</td>
</tr>
<tr>
<td>Prototype Fast Breeder Reactor</td>
<td>India</td>
<td>First criticality</td>
<td>6 April 2026</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.energy.gov/node/4832691" target="_blank" rel="noopener">US DOE, Experimental Breeder Reactor-II</a>, <a href="https://www.energy.gov/sites/prod/files/2016/01/f28/QTR2015-4H-Fast-Spectrum-Reactors.pdf" target="_blank" rel="noopener">US DOE, Quadrennial Technology Review 2015</a>, <a href="https://world-nuclear.org/information-library/country-profiles/countries-o-s/russia-nuclear-fuel-cycle" target="_blank" rel="noopener">World Nuclear Association, Russia</a>, <a href="https://world-nuclear.org/information-library/country-profiles/countries-g-n/india" target="_blank" rel="noopener">World Nuclear Association, India</a> and <a href="https://static.pib.gov.in/WriteReadData/specificdocs/documents/2026/apr/doc202647842201.pdf" target="_blank" rel="noopener">Press Information Bureau of India</a>.</p>
<p>The World Nuclear Association counts <a href="https://world-nuclear.org/information-library/current-and-future-generation/fast-neutron-reactors" target="_blank" rel="noopener">about 20 fast neutron reactors</a> that have operated, and says that by the 1980s they weren&#8217;t commercially competitive with light water reactors. India&#8217;s government says that once the Kalpakkam reactor is fully operational the country will be <a href="https://static.pib.gov.in/WriteReadData/specificdocs/documents/2026/apr/doc202647842201.pdf" target="_blank" rel="noopener">the second after Russia</a> to run a commercial fast breeder. The International Panel on Fissile Materials called the plant&#8217;s <a href="https://fissilematerials.org/blog/2026/04/indias_prototype_fast_bre_2.html" target="_blank" rel="noopener">delays and cost escalations</a> illustrative of fast breeders elsewhere.</p>
<p>Recycling is also a policy question. EIA says reprocessing spent fuel <a href="https://www.eia.gov/energyexplained/nuclear/the-nuclear-fuel-cycle.php" target="_blank" rel="noopener">isn&#8217;t permitted in the United States</a>.</p>
<h2>Can uranium from seawater make nuclear renewable?</h2>
<p>PNNL says the oceans hold more than four billion tons of uranium, enough for <a href="https://www.pnnl.gov/news-media/mining-uranium-seawater" target="_blank" rel="noopener">10,000 years</a> of global needs. That&#8217;s how much is dissolved in the water, and it&#8217;s far above the <a href="https://www.ans.org/news/article-6925/latest-red-book-stresses-need-for-boosts-in-uranium-development" target="_blank" rel="noopener">57 million tonnes of unconventional resources</a> the Red Book counts as potential supply.</p>
<p>An Oak Ridge adsorbent tested by PNNL held <a href="https://www.pnnl.gov/news-media/mining-uranium-seawater" target="_blank" rel="noopener">5.2 grams of uranium per kilogram</a> after 49 days in natural seawater. A DOE official called the process <a href="https://www.scientificamerican.com/article/uranium-extraction-from-seawater-takes-a-major-step-forward/" target="_blank" rel="noopener">still inefficient and expensive</a> in 2016. PNNL describes half a century of research with limited success, and its release gives no commercial cost per kilogram.</p>
<h2>How much carbon does nuclear energy produce?</h2>
<p>The IPCC&#8217;s 2014 review puts nuclear&#8217;s lifecycle median at <a href="https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf" target="_blank" rel="noopener">12 grams of CO2 equivalent per kWh</a>, against 820 for coal. That counts mining, building and fuel supply along with the plant.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Minimum (g CO2e/kWh)</th>
<th>Median (g CO2e/kWh)</th>
<th>Maximum (g CO2e/kWh)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Coal</td>
<td>740</td>
<td>820</td>
<td>910</td>
</tr>
<tr>
<td>Gas, combined cycle</td>
<td>410</td>
<td>490</td>
<td>650</td>
</tr>
<tr>
<td>Biomass, dedicated</td>
<td>130</td>
<td>230</td>
<td>420</td>
</tr>
<tr>
<td>Solar PV, utility</td>
<td>18</td>
<td>48</td>
<td>180</td>
</tr>
<tr>
<td>Solar PV, rooftop</td>
<td>26</td>
<td>41</td>
<td>60</td>
</tr>
<tr>
<td>Geothermal</td>
<td>6.0</td>
<td>38</td>
<td>79</td>
</tr>
<tr>
<td>Concentrated solar</td>
<td>8.8</td>
<td>27</td>
<td>63</td>
</tr>
<tr>
<td>Hydropower</td>
<td>1.0</td>
<td>24</td>
<td>2,200</td>
</tr>
<tr>
<td>Wind, offshore</td>
<td>8.0</td>
<td>12</td>
<td>35</td>
</tr>
<tr>
<td>Nuclear</td>
<td>3.7</td>
<td>12</td>
<td>110</td>
</tr>
<tr>
<td>Wind, onshore</td>
<td>7.0</td>
<td>11</td>
<td>56</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf" target="_blank" rel="noopener">IPCC, AR5 Working Group III, Annex III, Table A.III.2</a>. Values include the albedo effect and are from 2014 literature.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/nuclear-lifecycle-emissions-2026-11-12.png" alt="Nuclear&#x27;s IPCC lifecycle median is 12 grams of CO2 equivalent per kWh, level with wind at 11 to 12 and far below coal at 820" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf" target="_blank" rel="noopener">IPCC, AR5 Working Group III, Annex III</a>.</figcaption></figure>
<p>Nuclear&#8217;s median sits level with wind and well below utility solar. If you&#8217;re weighing a rooftop array on your own house, its median in the table is about three times a reactor&#8217;s. UNECE&#8217;s <a href="https://world-nuclear.org/information-library/energy-and-the-environment/carbon-dioxide-emissions-from-electricity.aspx" target="_blank" rel="noopener">5.1 to 6.4</a> is lower again, and the two come from different studies, a worldwide literature range and a UNECE-region assessment, so they don&#8217;t have to match.</p>
<p>EIA says reactors <a href="https://www.eia.gov/energyexplained/nuclear/nuclear-power-and-the-environment.php" target="_blank" rel="noopener">produce no carbon dioxide while operating</a>, and that the major environmental concern is radioactive waste. Waste and accidents are the questions behind <a href="/is-nuclear-power-safe/">whether nuclear power is safe</a>. A renewable label doesn&#8217;t settle carbon either. Dedicated biomass sits at a median of 230 grams in the table above, a case where <a href="/is-biomass-renewable/">biomass counts as renewable</a> and still emits far more than a reactor.</p>
<h2>Why do people group nuclear with renewables?</h2>
<p>The two cover similar ground on the grid. In 2023, utility-scale US generation was <a href="https://www.eia.gov/tools/faqs/faq.php?id=427&amp;t=3" target="_blank" rel="noopener">about 19% nuclear and 21% renewable</a>, and EIA says the two <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">generally have similar shares of US energy production</a>. Worldwide, low-carbon sources together reached <a href="https://ember-energy.org/latest-insights/global-electricity-review-2025/" target="_blank" rel="noopener">40.9% of electricity in 2024</a>.</p>
<p>The US had <a href="https://www.eia.gov/tools/faqs/faq.php?id=207&amp;t=3" target="_blank" rel="noopener">94 operating reactors in March 2026</a> at <a href="/how-many-nuclear-power-plants/">nuclear power plants</a> in 28 states. Ember reported that solar <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">overtook wind and drew close to nuclear in 2025</a>.</p>
<p>Solar generation rose by <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">636 TWh to 2,778 TWh in 2025</a>, up 30%. Ember <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">expects both solar and wind to pass nuclear in 2026</a>.</p>
<h2>Where these numbers come from</h2>
<p>We computed two figures. The 125 years divides <a href="https://world-nuclear-news.org/articles/red-book-confident-on-uranium-resources-to-meet-future-growth" target="_blank" rel="noopener">8.1 million tonnes</a> of resources by <a href="https://www.ans.org/news/2026-09-15/article-8391/newest-red-book-notes-the-need-for-more-u-investment/" target="_blank" rel="noopener">64,500 tonnes</a> of annual use. The 56 years divides the same resources by the <a href="https://www.ans.org/news/2026-09-15/article-8391/newest-red-book-notes-the-need-for-more-u-investment/" target="_blank" rel="noopener">143,900 tonne</a> high case for 2050.</p>
<p>Both treat the resource as fixed and demand as flat, and the longer figure is a floor because the report says resources exceed that total. The Red Book comes out <a href="https://world-nuclear-news.org/articles/red-book-provides-snapshot-of-uranium-situation" target="_blank" rel="noopener">about every two years</a>, and this page will update when the next one lands.</p>
<p>Where sources disagree, the page gives both. The World Nuclear Association puts reactor use at <a href="https://world-nuclear.org/information-library/nuclear-fuel-cycle/uranium-resources/supply-of-uranium" target="_blank" rel="noopener">nearly 69,000 tonnes a year</a>, against 64,500 in the Red Book. WNA counts a larger fleet, and it lists stockpiles and recycling as supply beyond mining. The lifecycle table uses the IPCC&#8217;s 2014 ranges, and the UNECE range comes through WNA.</p>
<h2>Renewable by law in some states, clean by law in others</h2>
<p>Nuclear stays nonrenewable by EIA&#8217;s definition, because the uranium it burns is mined from deposits that are large but finite. What varies is the policy label. Minnesota&#8217;s carbon-free standard counts reactors toward its goal, while Vermont&#8217;s target is written as renewable and leaves them out. Whether a reactor near you counts toward your state&#8217;s goal comes down to which of those two words the law uses.</p>
<p class="ec-photo-credit"><small>Top photo: <a href="https://commons.wikimedia.org/wiki/File:Calvert_Cliffs.jpg" target="_blank" rel="noopener">en:User:Jbs666</a>, <a href="http://creativecommons.org/licenses/by-sa/3.0/" target="_blank" rel="noopener">CC BY-SA 3.0</a>, via Wikimedia Commons, cropped.</small></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>How many nuclear power plants are in the US? (2026)</title>
		<link>https://theenergycollective.com/how-many-nuclear-power-plants/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Wed, 11 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1096</guid>

					<description><![CDATA[The US has 94 operating nuclear reactors at 54 power plants in 28 states, EIA counted in March 2026. A plant is a site and a reactor is&#8230;]]></description>
										<content:encoded><![CDATA[<p>The US has <a href="https://www.eia.gov/energyexplained/nuclear/us-nuclear-industry.php" target="_blank" rel="noopener">94 operating nuclear reactors at 54 power plants</a> in 28 states, EIA counted in March 2026. A plant is a site and a reactor is one generating unit on it, so the reactor count runs higher. The fleet ran at an average <a href="https://www.eia.gov/energyexplained/nuclear/us-nuclear-industry.php" target="_blank" rel="noopener">capacity factor of 91% in 2025</a>. The figures come mostly from EIA, NRC and IAEA and describe 2025 or 2026 unless a line says otherwise.</p>
<h2>Top US nuclear power plant statistics</h2>
<ul>
<li>EIA counted <a href="https://www.eia.gov/tools/faqs/faq.php?id=207&amp;t=3" target="_blank" rel="noopener">94 operating reactors at 54 plants in 28 states</a> as of March 2026.</li>
<li>The NRC&#8217;s list of licensed power reactors had <a href="https://www.nrc.gov/reactors/operating/list-power-reactor-units.html" target="_blank" rel="noopener">95 units on September 14, 2026</a>, because it includes Palisades in Michigan.</li>
<li>US reactors made <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_1" target="_blank" rel="noopener">785 billion kWh in 2025, about 17.7% of utility-scale generation</a>, a share calculated from EIA data.</li>
<li>The fleet peaked at <a href="https://www.eia.gov/totalenergy/data/browser/?tbl=T08.01" target="_blank" rel="noopener">112 operable reactors in 1990 and fell to 92 in 2022</a>.</li>
<li>Illinois has the most reactors of any state, <a href="https://www.eia.gov/tools/faqs/faq.php?id=207&amp;t=3" target="_blank" rel="noopener">11 as of March 2026</a>.</li>
<li>Vogtle Unit 4 in Georgia, the newest reactor, <a href="https://publicpower.org/periodical/article/new-georgia-nuclear-power-unit-enters-commercial-operation" target="_blank" rel="noopener">entered commercial operation on April 29, 2024</a>.</li>
<li>The World Nuclear Association&#8217;s database lists <a href="https://world-nuclear.org/nuclear-reactor-database/summary" target="_blank" rel="noopener">443 operable reactors worldwide</a>, a broader definition than IAEA&#8217;s.</li>
<li>The Energy Secretary said on <a href="https://www.michiganpublic.org/transportation-infrastructure/2026-10-29/historic-palisades-nuclear-plant-restart-may-only-be-weeks-away-energy-secretary-says" target="_blank" rel="noopener">October 29, 2026</a> that the Palisades reactor in Michigan, shut since May 2022, would restart in a few weeks.</li>
</ul>
<h2>How many nuclear power plants and reactors are there in the US?</h2>
<p>The US has <a href="https://www.eia.gov/tools/faqs/faq.php?id=207&amp;t=3" target="_blank" rel="noopener">54 operating nuclear power plants with 94 reactors</a> as of March 2026, according to EIA.</p>
<table>
<thead>
<tr>
<th>Reactors at the plant</th>
<th>Plants</th>
<th>Reactors</th>
</tr>
</thead>
<tbody>
<tr>
<td>1</td>
<td>19</td>
<td>19</td>
</tr>
<tr>
<td>2</td>
<td>31</td>
<td>62</td>
</tr>
<tr>
<td>3</td>
<td>3</td>
<td>9</td>
</tr>
<tr>
<td>4</td>
<td>1</td>
<td>4</td>
</tr>
<tr>
<td>All plants</td>
<td>54</td>
<td>94</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/energyexplained/nuclear/us-nuclear-industry.php" target="_blank" rel="noopener">EIA, U.S. nuclear industry</a>, as of March 2026. The reactor column is plants multiplied by reactors per plant, and the bottom row adds it up.</p>
<p>For where the fleet is headed, the <a href="/nuclear-outlook/">outlook for US nuclear power</a> covers new builds and policy.</p>
<h2>Which states have the most nuclear power plants?</h2>
<p>Illinois has <a href="https://www.energy.gov/sites/default/files/2024-02/ne-2023fastfactsguide-021424.pdf" target="_blank" rel="noopener">11 reactors, the most of any state</a>, according to DOE&#8217;s 2023 fast facts guide. DOE also says nuclear <a href="https://www.energy.gov/ne/articles/advantages-and-challenges-nuclear-energy" target="_blank" rel="noopener">powers communities in 28 states</a>, the same count EIA gives. Pennsylvania and South Carolina come next in the table above.</p>
<p>States with three or more operating reactors:</p>
<table>
<thead>
<tr>
<th>State</th>
<th>Plants</th>
<th>Reactors</th>
<th>Net summer capacity (MW)</th>
<th>Plant names</th>
</tr>
</thead>
<tbody>
<tr>
<td>Illinois</td>
<td>6</td>
<td>11</td>
<td>11,596</td>
<td>Braidwood, Byron, Clinton, Dresden, LaSalle, Quad Cities</td>
</tr>
<tr>
<td>Pennsylvania</td>
<td>4</td>
<td>8</td>
<td>9,094</td>
<td>Beaver Valley, Limerick, Peach Bottom, Susquehanna</td>
</tr>
<tr>
<td>South Carolina</td>
<td>4</td>
<td>7</td>
<td>6,646</td>
<td>Catawba, Oconee, Robinson, Summer</td>
</tr>
<tr>
<td>Georgia</td>
<td>2</td>
<td>6</td>
<td>6,289</td>
<td>Hatch, Vogtle</td>
</tr>
<tr>
<td>Alabama</td>
<td>2</td>
<td>5</td>
<td>5,453</td>
<td>Browns Ferry, Farley</td>
</tr>
<tr>
<td>North Carolina</td>
<td>3</td>
<td>5</td>
<td>5,150</td>
<td>Brunswick, Harris, McGuire</td>
</tr>
<tr>
<td>Florida</td>
<td>2</td>
<td>4</td>
<td>3,649</td>
<td>St. Lucie, Turkey Point</td>
</tr>
<tr>
<td>New York</td>
<td>3</td>
<td>4</td>
<td>3,326</td>
<td>FitzPatrick, Ginna, Nine Mile Point</td>
</tr>
<tr>
<td>Tennessee</td>
<td>2</td>
<td>4</td>
<td>4,523</td>
<td>Sequoyah, Watts Bar</td>
</tr>
<tr>
<td>Texas</td>
<td>2</td>
<td>4</td>
<td>4,980</td>
<td>Comanche Peak, South Texas Project</td>
</tr>
<tr>
<td>Virginia</td>
<td>2</td>
<td>4</td>
<td>3,568</td>
<td>North Anna, Surry</td>
</tr>
<tr>
<td>Arizona</td>
<td>1</td>
<td>3</td>
<td>3,937</td>
<td>Palo Verde</td>
</tr>
<tr>
<td>Michigan</td>
<td>2</td>
<td>3</td>
<td>3,318</td>
<td>D.C. Cook, Fermi</td>
</tr>
<tr>
<td>Minnesota</td>
<td>2</td>
<td>3</td>
<td>1,657</td>
<td>Monticello, Prairie Island</td>
</tr>
<tr>
<td>New Jersey</td>
<td>2</td>
<td>3</td>
<td>3,459</td>
<td>Hope Creek, Salem</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/nuclear/generation/xls/usreact26.xlsx" target="_blank" rel="noopener">EIA data file U.S. Nuclear Generation and Generating Capacity for June 2026</a>. Capacity is net summer capacity in megawatts. Plants are counted by EIA plant ID and states are EIA&#8217;s. Palisades in Michigan and Crane in Pennsylvania are left out because they aren&#8217;t running.</p>
<p>States with one or two operating reactors:</p>
<table>
<thead>
<tr>
<th>State</th>
<th>Plants</th>
<th>Reactors</th>
<th>Net summer capacity (MW)</th>
<th>Plant names</th>
</tr>
</thead>
<tbody>
<tr>
<td>Arkansas</td>
<td>1</td>
<td>2</td>
<td>1,808</td>
<td>Arkansas Nuclear One</td>
</tr>
<tr>
<td>California</td>
<td>1</td>
<td>2</td>
<td>2,240</td>
<td>Diablo Canyon</td>
</tr>
<tr>
<td>Connecticut</td>
<td>1</td>
<td>2</td>
<td>2,108</td>
<td>Millstone</td>
</tr>
<tr>
<td>Louisiana</td>
<td>2</td>
<td>2</td>
<td>2,055</td>
<td>River Bend, Waterford 3</td>
</tr>
<tr>
<td>Maryland</td>
<td>1</td>
<td>2</td>
<td>1,745</td>
<td>Calvert Cliffs</td>
</tr>
<tr>
<td>Ohio</td>
<td>2</td>
<td>2</td>
<td>2,134</td>
<td>Davis-Besse, Perry</td>
</tr>
<tr>
<td>Wisconsin</td>
<td>1</td>
<td>2</td>
<td>1,189</td>
<td>Point Beach</td>
</tr>
<tr>
<td>Kansas</td>
<td>1</td>
<td>1</td>
<td>1,177</td>
<td>Wolf Creek</td>
</tr>
<tr>
<td>Mississippi</td>
<td>1</td>
<td>1</td>
<td>1,397</td>
<td>Grand Gulf</td>
</tr>
<tr>
<td>Missouri</td>
<td>1</td>
<td>1</td>
<td>1,190</td>
<td>Callaway</td>
</tr>
<tr>
<td>Nebraska</td>
<td>1</td>
<td>1</td>
<td>769</td>
<td>Cooper</td>
</tr>
<tr>
<td>New Hampshire</td>
<td>1</td>
<td>1</td>
<td>1,247</td>
<td>Seabrook</td>
</tr>
<tr>
<td>Washington</td>
<td>1</td>
<td>1</td>
<td>1,151</td>
<td>Columbia</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/nuclear/generation/xls/usreact26.xlsx" target="_blank" rel="noopener">EIA data file U.S. Nuclear Generation and Generating Capacity for June 2026</a>. The 28 state rows add up to 54 plants and 94 reactors with 96,855 MW of net summer capacity, a sum we calculated from EIA&#8217;s rows.</p>
<p>If you live in Connecticut, Dominion says its Millstone station produces <a href="https://www.dominionenergy.com/projects-and-facilities/nuclear-facilities" target="_blank" rel="noopener">nearly half of the state&#8217;s energy</a>. If you&#8217;re in South Carolina, the company says its V.C. Summer station <a href="https://www.dominionenergy.com/projects-and-facilities/nuclear-facilities" target="_blank" rel="noopener">produces electricity for 225,000 homes</a>. Dominion also runs <a href="https://www.dominionenergy.com/projects-and-facilities/nuclear-facilities" target="_blank" rel="noopener">two nuclear stations in Virginia</a>, Surry and North Anna.</p>
<p>To find the reactors near you, look up your state in the tables above.</p>
<h2>Why do agencies report different reactor counts?</h2>
<p>The NRC&#8217;s list of power reactor units totals <a href="https://www.nrc.gov/reactors/operating/list-power-reactor-units.html" target="_blank" rel="noopener">95 units</a> and includes Palisades, which Holtec is working to restart. EIA&#8217;s unit-level file lists <a href="https://www.eia.gov/nuclear/generation/xls/usreact26.xlsx" target="_blank" rel="noopener">96 units</a>, including Palisades and Crane with zero generation from January to June 2026.</p>
<p>NRC lists Crane, the former Three Mile Island reactor, among its <a href="https://www.nrc.gov/info-finder/decommissioning/power-reactor/index.html" target="_blank" rel="noopener">sites undergoing decommissioning</a> and leaves it off its operating list.</p>
<p>Agencies also place a few plants in different states. The NRC&#8217;s list puts <a href="https://www.nrc.gov/reactors/operating/list-power-reactor-units.html" target="_blank" rel="noopener">Salem and Hope Creek in Delaware and Fermi 2 in Ohio</a>, which is the state of the nearest city, while EIA puts them in New Jersey and Michigan. The tables here follow EIA.</p>
<p>A figure for plants and a figure for reactors can both be right, so check which one a page means before comparing.</p>
<h2>How has the number of US nuclear reactors changed since 1957?</h2>
<p>EIA&#8217;s Monthly Energy Review shows <a href="https://www.eia.gov/totalenergy/data/browser/csv.php?tbl=T08.01" target="_blank" rel="noopener">112 operable reactors in 1990 and 94 in 2025</a>, with 1990 the peak.</p>
<table>
<thead>
<tr>
<th>Year-end</th>
<th>Operable reactors</th>
</tr>
</thead>
<tbody>
<tr>
<td>1960</td>
<td>3</td>
</tr>
<tr>
<td>1970</td>
<td>20</td>
</tr>
<tr>
<td>1980</td>
<td>71</td>
</tr>
<tr>
<td>1985</td>
<td>96</td>
</tr>
<tr>
<td>1990</td>
<td>112</td>
</tr>
<tr>
<td>1995</td>
<td>109</td>
</tr>
<tr>
<td>2000</td>
<td>104</td>
</tr>
<tr>
<td>2005</td>
<td>104</td>
</tr>
<tr>
<td>2010</td>
<td>104</td>
</tr>
<tr>
<td>2012</td>
<td>104</td>
</tr>
<tr>
<td>2013</td>
<td>100</td>
</tr>
<tr>
<td>2015</td>
<td>99</td>
</tr>
<tr>
<td>2018</td>
<td>98</td>
</tr>
<tr>
<td>2019</td>
<td>96</td>
</tr>
<tr>
<td>2020</td>
<td>94</td>
</tr>
<tr>
<td>2021</td>
<td>93</td>
</tr>
<tr>
<td>2022</td>
<td>92</td>
</tr>
<tr>
<td>2023</td>
<td>93</td>
</tr>
<tr>
<td>2024</td>
<td>94</td>
</tr>
<tr>
<td>2025</td>
<td>94</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/totalenergy/data/browser/csv.php?tbl=T08.01" target="_blank" rel="noopener">EIA, Monthly Energy Review, Table 8.1 Nuclear Energy Overview</a>, total operable nuclear generating units at year-end.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/how-many-nuclear-power-plants-reactor-history-2026-11-05.png" alt="US operable nuclear reactors rose from 1 in 1957 to a peak of 112 in 1990, then settled at 94 in 2025" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://www.eia.gov/totalenergy/data/browser/csv.php?tbl=T08.01" target="_blank" rel="noopener">EIA Monthly Energy Review, Table 8.1</a>.</figcaption></figure>
<p>The count <a href="https://www.eia.gov/totalenergy/data/browser/?tbl=T08.01" target="_blank" rel="noopener">sat at 104 from 1998 to 2012</a> and then dropped to 92 by 2022 as reactors closed. The two new Vogtle reactors brought it <a href="https://www.eia.gov/totalenergy/data/browser/?tbl=T08.01" target="_blank" rel="noopener">back to 94 by 2024</a>.</p>
<h2>What share of US electricity comes from nuclear?</h2>
<p>Nuclear plants made about <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_1" target="_blank" rel="noopener">17.7% of US utility-scale electricity in 2025</a>, calculated from EIA&#8217;s Electric Power Monthly.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>Nuclear generation (billion kWh)</th>
<th>Share of US generation (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>1980</td>
<td>251.1</td>
<td>11.0</td>
</tr>
<tr>
<td>1990</td>
<td>576.9</td>
<td>19.0</td>
</tr>
<tr>
<td>2000</td>
<td>753.9</td>
<td>19.8</td>
</tr>
<tr>
<td>2010</td>
<td>807.0</td>
<td>19.6</td>
</tr>
<tr>
<td>2023</td>
<td>774.9</td>
<td>18.5</td>
</tr>
<tr>
<td>2024</td>
<td>781.9</td>
<td>18.1</td>
</tr>
<tr>
<td>2025</td>
<td>785.3</td>
<td>17.7</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/totalenergy/data/annual/showtext.php?t=ptb0902" target="_blank" rel="noopener">EIA, Annual Energy Review 2011, Table 9.2</a> for 1980 to 2010, and a calculation from <a href="https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_1_1" target="_blank" rel="noopener">EIA, Electric Power Monthly, Table 1.1</a> for 2023 to 2025 that divides nuclear by total utility-scale generation.</p>
<p>The share reached <a href="https://www.eia.gov/totalenergy/data/annual/showtext.php?t=ptb0902" target="_blank" rel="noopener">20.6% in 2001</a> in EIA&#8217;s historical series.</p>
<p>DOE says US plants produced <a href="https://www.energy.gov/sites/default/files/2024-02/ne-2023fastfactsguide-021424.pdf" target="_blank" rel="noopener">772 billion kWh in 2022, enough for over 72 million homes</a>. The share of its maximum output a reactor actually delivers is <a href="/capacity-factor/">its capacity factor</a>.</p>
<h2>Which US nuclear reactors have opened or closed since 2020?</h2>
<p>Vogtle Unit 3 in Georgia <a href="https://publicpower.org/periodical/article/new-georgia-nuclear-power-unit-enters-commercial-operation" target="_blank" rel="noopener">entered commercial operation on July 31, 2023</a>, and Unit 4 followed in April 2024. DOE says they were the first new reactors to begin construction in the US in <a href="https://www.energy.gov/ne/articles/advantages-and-challenges-nuclear-energy" target="_blank" rel="noopener">more than 30 years</a>.</p>
<table>
<thead>
<tr>
<th>Date</th>
<th>Plant</th>
<th>What happened</th>
</tr>
</thead>
<tbody>
<tr>
<td>April 30, 2020</td>
<td>Indian Point 2, New York</td>
<td>Closed</td>
</tr>
<tr>
<td>April 30, 2021</td>
<td>Indian Point 3, New York</td>
<td>Closed</td>
</tr>
<tr>
<td>May 2022</td>
<td>Palisades, Michigan</td>
<td>Ceased operations</td>
</tr>
<tr>
<td>July 31, 2023</td>
<td>Vogtle 3, Georgia</td>
<td>Commercial operation</td>
</tr>
<tr>
<td>April 29, 2024</td>
<td>Vogtle 4, Georgia</td>
<td>Commercial operation</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.neimagazine.com/news/final-closure-of-indian-point-npp-8718804/" target="_blank" rel="noopener">Nuclear Engineering International on Indian Point</a>, <a href="https://www.powermag.com/indian-point-unit-2-will-shut-down-april-30/" target="_blank" rel="noopener">POWER Magazine on Indian Point 2</a>, <a href="https://www.nucnet.org/news/unit-3-set-for-closure-despite-warnings-on-emissions-4-5-2021" target="_blank" rel="noopener">NucNet on Indian Point 3</a>, <a href="https://www.neimagazine.com/news/palisades-restart-enters-final-phase/" target="_blank" rel="noopener">Nuclear Engineering International on Palisades</a>, <a href="https://publicpower.org/periodical/article/new-georgia-nuclear-power-unit-enters-commercial-operation" target="_blank" rel="noopener">American Public Power Association on Vogtle</a> and <a href="https://ans.org/news/article-5994/vogtle4-enters-commercial-operation" target="_blank" rel="noopener">American Nuclear Society on Vogtle 4</a>.</p>
<p>Indian Point 3 closed on <a href="https://www.neimagazine.com/news/final-closure-of-indian-point-npp-8718804/" target="_blank" rel="noopener">April 30, 2021</a>, the last of three reactors at the New York station and a year after Unit 2. If you&#8217;re a Georgia Power customer, the company says Unit 4 can power <a href="https://ans.org/news/article-5994/vogtle4-enters-commercial-operation" target="_blank" rel="noopener">an estimated 500,000 homes and businesses</a>. If safety is your question, the data on <a href="/is-nuclear-power-safe/">how safe nuclear power is</a> compares death rates across energy sources.</p>
<h2>How many nuclear power plants are in the world?</h2>
<p>IAEA counted <a href="https://www-pub.iaea.org/MTCD/Publications/PDF/RDS-2-45_web.pdf" target="_blank" rel="noopener">417 operational reactors</a> at the end of 2024, with 377 GW of capacity in 31 member states. The World Nuclear Association&#8217;s database counts a broader group it calls operable and lists <a href="https://world-nuclear.org/nuclear-reactor-database/summary" target="_blank" rel="noopener">443 reactors, with 80 under construction</a>. The two differ in definition and date.</p>
<p>US reactors made <a href="https://www-pub.iaea.org/MTCD/Publications/PDF/RDS-2-45_web.pdf" target="_blank" rel="noopener">781.9 TWh in 2024, 30% of the world total</a>, the most of any country, according to IAEA.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>US reactors</th>
<th>World reactors</th>
</tr>
</thead>
<tbody>
<tr>
<td>1995</td>
<td>108</td>
<td>434</td>
</tr>
<tr>
<td>2000</td>
<td>103</td>
<td>435</td>
</tr>
<tr>
<td>2005</td>
<td>103</td>
<td>440</td>
</tr>
<tr>
<td>2010</td>
<td>104</td>
<td>436</td>
</tr>
<tr>
<td>2015</td>
<td>99</td>
<td>416</td>
</tr>
<tr>
<td>2020</td>
<td>94</td>
<td>414</td>
</tr>
<tr>
<td>2023</td>
<td>93</td>
<td>413</td>
</tr>
<tr>
<td>2024</td>
<td>94</td>
<td>417</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www-pub.iaea.org/MTCD/Publications/PDF/RDS-2-45_web.pdf" target="_blank" rel="noopener">IAEA, Nuclear Power Reactors in the World, 2025 edition, Table 5</a>. Counts are operational reactors on the grid, latest in each year.</p>
<p>Germany moved the other way with <a href="/germany-nuclear-phase-out-emissions-coal/">a full nuclear phase-out</a>.</p>
<h2>How we compiled these numbers</h2>
<p>Plant and reactor counts come from EIA&#8217;s March 2026 page and its June 2026 unit-level file, which we used to build the state tables, counting plants by EIA plant ID. We left Palisades and Crane out of every operating count, as EIA&#8217;s headline does.</p>
<p>The history table uses EIA&#8217;s year-end count of operable units and the world table uses IAEA&#8217;s annual report, and since they count at different dates we kept them apart. Shares for 2023 to 2025 and the capacity totals are our arithmetic, with utility-scale generation as the denominator. The page will be updated when Palisades or Crane connects to the grid, and as EIA publishes each month&#8217;s Electric Power Monthly and IAEA its annual report.</p>
<h2>Palisades and Crane, the two idle reactors that could lift the count to 96</h2>
<p>Palisades, an 800 MWe reactor, <a href="https://www.neimagazine.com/news/palisades-restart-enters-final-phase/" target="_blank" rel="noopener">ceased operations in May 2022</a>. Michigan Public noted the planned restart <a href="https://www.michiganpublic.org/transportation-infrastructure/2026-10-29/historic-palisades-nuclear-plant-restart-may-only-be-weeks-away-energy-secretary-says" target="_blank" rel="noopener">has been delayed before</a>. Holtec&#8217;s estimate of <a href="https://www.ans.org/news/2026-07-08/article-8187/" target="_blank" rel="noopener">reconnection by the end of February 2026</a> passed without a restart.</p>
<p>In July 2026 the company said <a href="https://www.ans.org/news/2026-07-08/article-8187/" target="_blank" rel="noopener">more than 5,000 work activities</a> remained. Holtec&#8217;s CEO, Kris Singh, told the Financial Times he expects <a href="https://www.ans.org/news/2026-07-08/article-8187/" target="_blank" rel="noopener">a restart this year, ahead of a March 2027 power contract</a>, ANS reported in July 2026.</p>
<p>Constellation says it still expects to restart Crane, which would add 835 MW, <a href="https://wnn.world-nuclear.org/articles/constellation-seeks-regulators-help-for-2027-plant-restart" target="_blank" rel="noopener">in 2027</a>. The company&#8217;s CEO told investors that connecting to the PJM grid <a href="https://wnn.world-nuclear.org/articles/constellation-seeks-regulators-help-for-2027-plant-restart" target="_blank" rel="noopener">could slip into the 2030s</a>, World Nuclear News reported in April 2026.</p>
<p>DOE&#8217;s loan guarantee for the Palisades restart is <a href="https://www.powermag.com/doe-approves-fifth-loan-disbursement-to-holtec-for-historic-restart-of-palisades-nuclear-plant/" target="_blank" rel="noopener">$1.52 billion, with $335.1 million paid out by August 2025</a>.</p>
<p>Until one of them feeds power to the grid, EIA&#8217;s operating count doesn&#8217;t change, and the NRC&#8217;s reactor list shows where each one stands. If you&#8217;re comparing what a new reactor costs against other sources, <a href="/solar-vs-nuclear-cost/">solar versus nuclear cost</a> puts the two side by side.</p>
<p class="ec-photo-credit"><small>Top photo: <a href="https://commons.wikimedia.org/wiki/File:Byron_Nuclear_Generating_Station.jpg" target="_blank" rel="noopener">Bill Tracey, w:Flickr user iluvcocacola</a>, <a href="https://creativecommons.org/licenses/by/2.0" target="_blank" rel="noopener">CC BY 2.0</a>, via Wikimedia Commons, cropped.</small></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>What Germany&#8217;s nuclear phase-out did to emissions and coal</title>
		<link>https://theenergycollective.com/germany-nuclear-phase-out-emissions-coal/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 28 Sep 2026 18:18:05 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/germany-nuclear-phase-out-emissions-coal/</guid>

					<description><![CDATA[Germany shut down its last three nuclear reactors on April 15, 2023, and for most of the decade after Fukushima, the power nuclear used to supply went mostly to coal, not to wind and solar.]]></description>
										<content:encoded><![CDATA[<p>Germany shut its last three nuclear reactors on <a href="https://www.cleanenergywire.org/factsheets/history-behind-germanys-nuclear-phase-out" target="_blank" rel="noopener">April 15, 2023</a>. That year, the country&#8217;s power-sector emissions fell <a href="https://www.agora-energiewende.org/news-events/germanys-co2-emissions-drop-to-record-low-but-reveal-gaps-in-countrys-climate-policies" target="_blank" rel="noopener">21 percent to a record low of 177 million tons</a>. Coal absorbed nuclear&#8217;s lost output for most of the decade before that, but renewables have since pulled ahead of it and coal&#8217;s share keeps shrinking.</p>
<p>If you&#8217;re trying to figure out whether a nuclear phase-out helps or hurts a climate plan, Germany already ran the experiment. Coal came back before renewables did, and emissions fell anyway once they caught up.</p>
<h2>What filled the hole nuclear left behind</h2>
<p>Nuclear supplied more than a quarter of German electricity as recently as 2010, when the country&#8217;s 17 reactors generated <a href="https://world-nuclear.org/information-library/country-profiles/countries-g-n/germany" target="_blank" rel="noopener">133 terawatt-hours</a>. After <a href="https://www.eia.gov/todayinenergy/detail.php?id=55559" target="_blank" rel="noopener">8 of those 17 reactors</a> went offline in 2011, cutting nuclear output roughly in half, the lost generation didn&#8217;t shift to wind turbines. Reporting on the years since Fukushima shows reductions in nuclear generation were offset primarily by increases in coal, not by the renewable buildout that was supposed to be the long-term answer (<a href="https://www.cnn.com/2023/04/15/europe/germany-nuclear-phase-out-climate-intl/index.html" target="_blank" rel="noopener">CNN</a>).</p>
<p>Renewables kept growing through the 2010s, but not fast enough to close the gap outright. By the time the last three reactors closed in April 2023, nuclear was still supplying about <a href="https://www.eia.gov/todayinenergy/detail.php?id=55559" target="_blank" rel="noopener">6 percent of German electricity</a>, and coal had climbed to more than <a href="https://www.cnn.com/2023/04/15/europe/germany-nuclear-phase-out-climate-intl/index.html" target="_blank" rel="noopener">30 percent</a>.</p>
<p>When a reactor goes offline, the grid needs something to answer the gap that same hour. A coal plant already sits on standby, its stacks built and permitted, while a solar field a few miles away still needs two or three years of construction before it can connect to the grid. Wind and solar add capacity gradually. Without enough storage or transmission to move their output where it&#8217;s needed, they can&#8217;t step in for a retired reactor on short notice.</p>
<p>The 2022 energy crisis pushed the same lever harder. If you heated a German home that winter, you felt it directly. Gas covers <a href="https://www.eia.gov/todayinenergy/detail.php?id=55559" target="_blank" rel="noopener">almost half of German home heating</a>, and Russia had supplied <a href="https://www.eia.gov/todayinenergy/detail.php?id=55559" target="_blank" rel="noopener">55 percent of the country&#8217;s gas imports in 2021</a>.</p>
<p>When Russian gas deliveries collapsed after the invasion of Ukraine, Berlin passed the Substitute Power Plants Maintenance Act to bring mothballed coal capacity back into the grid. It moved roughly <a href="https://www.cleanenergywire.org/news/qa-germany-reverting-coal-fight-gas-supply-crunch" target="_blank" rel="noopener">2.7 gigawatts of lignite units</a> and several gigawatts of hard coal plants out of cold reserve between mid-2022 and early 2023, to save gas for winter heating. Delaying the nuclear exit and reviving coal plants were two sides of the same emergency response.</p>
<p>Climate scientists don&#8217;t agree on whether losing that last <a href="https://www.eia.gov/todayinenergy/detail.php?id=55559" target="_blank" rel="noopener">6 percent of nuclear</a> was worth it, or how <a href="https://theenergycollective.com/is-nuclear-power-safe/">safe those reactors were</a> to begin with. Hans von Storch, a climate researcher at Germany&#8217;s Institute for Coastal Research, called the decision <a href="https://www.cnbc.com/2023/04/18/germany-shuts-down-last-nuclear-power-plants-some-scientists-aghast.html" target="_blank" rel="noopener">&#8220;incomprehensible&#8221;</a> from a climate standpoint. Niklas Höhne, who studies climate policy at Wageningen University, took the opposite position. Phasing out nuclear, he argued, gave renewables the certainty to scale <a href="https://www.cnbc.com/2023/04/18/germany-shuts-down-last-nuclear-power-plants-some-scientists-aghast.html" target="_blank" rel="noopener">&#8220;much faster, cheaper and safer&#8221;</a> than nuclear power could.</p>
<h2>What economists found it cost</h2>
<p>An economics team, Stephen Jarvis, Olivier Deschenes and Akshaya Jha, tried to put a number on that substitution. Their study traced what happened after Germany shut down <a href="https://www.lse.ac.uk/granthaminstitute/publication/the-private-and-external-costs-of-germanys-nuclear-phase-ou/" target="_blank" rel="noopener">more than half its nuclear capacity</a> in the wake of Fukushima. It circulated first as an <a href="https://www.nber.org/papers/w26598" target="_blank" rel="noopener">NBER working paper in 2019</a> and was published in 2022 in the Journal of the European Economic Association.</p>
<p>Their finding matches the pattern above. The lost nuclear output was replaced primarily by coal-fired production and net electricity imports.</p>
<p>The published version puts the added social cost of that substitution at <a href="https://www.lse.ac.uk/granthaminstitute/publication/the-private-and-external-costs-of-germanys-nuclear-phase-ou/" target="_blank" rel="noopener">€3 billion to €8 billion a year</a>, mostly from the mortality risk that local air pollution from burning coal creates. If you live near one of the plants that picked up nuclear&#8217;s old load, that mortality risk is the bill you paid instead of a bigger charge on a power statement. Most of the total has nothing to do with carbon.</p>
<p>An earlier working-paper version of the same research had put the annual toll at <a href="https://www.nber.org/papers/w26598" target="_blank" rel="noopener">about $12 billion, with more than 70 percent of it</a> coming from that same air-pollution mortality channel. The estimates moved between drafts. The conclusion didn&#8217;t. The accident and waste-disposal risks that motivated the phase-out were real, and by the authors&#8217; own accounting, still smaller than the health and climate costs of running coal harder in nuclear&#8217;s place.</p>
<h2>Where German power emissions stand now</h2>
<p>The <a href="https://theenergycollective.com/renewable-energy/">renewable energy buildout</a> that was meant to replace nuclear has largely caught up, years after the fact. Renewables supplied more than half of Germany&#8217;s gross electricity consumption for the first time in 2023, the same year power-sector CO2 emissions fell <a href="https://www.agora-energiewende.org/news-events/germanys-co2-emissions-drop-to-record-low-but-reveal-gaps-in-countrys-climate-policies" target="_blank" rel="noopener">21 percent to 177 million tons</a>. In 2024, renewables reached <a href="https://www.agora-energiewende.org/news-events/renewables-cut-german-electricity-costs-and-emissions-lack-of-momentum-seen-in-buildings-and-transport-sectors" target="_blank" rel="noopener">55 percent of consumption</a>, and coal-fired generation dropped <a href="https://www.agora-energiewende.org/news-events/renewables-cut-german-electricity-costs-and-emissions-lack-of-momentum-seen-in-buildings-and-transport-sectors" target="_blank" rel="noopener">another 16 percent year on year</a>.</p>
<p>Germany&#8217;s federal environment agency put the energy sector&#8217;s 2024 emissions decline at <a href="https://www.umweltbundesamt.de/themen/finale-daten-fuer-2024-emissionen-um-drei-prozent" target="_blank" rel="noopener">more than 15 million tons, a 7.4 percent year-on-year drop</a>, driven mainly by lower <a href="https://theenergycollective.com/how-is-coal-formed/">coal and lignite</a> burning. The carbon intensity of German grid power fell alongside it, from <a href="https://www.umweltbundesamt.de/themen/co2-emissionen-pro-kilowattstunde-strom-2024" target="_blank" rel="noopener">433 grams of CO2 per kilowatt-hour in 2022</a> to 386 grams in 2023 and <a href="https://www.umweltbundesamt.de/themen/co2-emissionen-pro-kilowattstunde-strom-2024" target="_blank" rel="noopener">363 grams in 2024</a>. That&#8217;s a cleaner electron for anything you plug in, a dishwasher or an EV charger, than the German grid delivered two years earlier.</p>
<h2>What 2025 looked like without nuclear at all</h2>
<p>The full 2025 numbers show the same trend continuing, with no nuclear anywhere in the mix. Wind became Germany&#8217;s <a href="https://www.ise.fraunhofer.de/en/press-media/press-releases/2026/german-public-electricity-generation-in-2025-wind-and-solar-power-take-the-lead.html" target="_blank" rel="noopener">largest electricity source for the year at 132 terawatt-hours</a>, and solar generation <a href="https://www.ise.fraunhofer.de/en/press-media/press-releases/2026/german-public-electricity-generation-in-2025-wind-and-solar-power-take-the-lead.html" target="_blank" rel="noopener">rose 21 percent to overtake lignite for the first time on record</a>. That&#8217;s what solar can do without nuclear left to lean on, and it&#8217;s real context if you&#8217;re weighing panels for your own roof. Renewables held at <a href="https://www.ise.fraunhofer.de/en/press-media/press-releases/2026/german-public-electricity-generation-in-2025-wind-and-solar-power-take-the-lead.html" target="_blank" rel="noopener">55.9 percent of net public electricity generation</a>, per Fraunhofer ISE.</p>
<p><a href="https://theenergycollective.com/coal-decline/">Coal</a> hasn&#8217;t gone away. It still covers the gaps on windless, sunless days, the moment you&#8217;d notice it most if you lived on that grid, and it came back briefly during the <a href="https://www.cleanenergywire.org/news/qa-germany-reverting-coal-fight-gas-supply-crunch" target="_blank" rel="noopener">2022 gas crisis</a>. Every year since the phase-out finished, though, coal has lost ground to renewables and imports.</p>
<h2>How the phase-out happened</h2>
<p>Germany&#8217;s exit from <a href="https://theenergycollective.com/nuclear-outlook/">nuclear power</a> didn&#8217;t start with Fukushima. It started nine years earlier, when Chancellor Gerhard Schröder&#8217;s SPD-Green government struck what&#8217;s known in Germany as the nuclear consensus, a 2000 deal with the country&#8217;s utilities to cap reactor lifespans at roughly <a href="https://www.cleanenergywire.org/factsheets/history-behind-germanys-nuclear-phase-out" target="_blank" rel="noopener">32 years and wind the fleet down by around 2022</a>, written into law in 2002 as an amendment to the Atomic Energy Act.</p>
<p>The center-right government elected in 2009 tried to undo it. Angela Merkel&#8217;s coalition with the FDP extended reactor operating licenses by <a href="https://www.cleanenergywire.org/factsheets/history-behind-germanys-nuclear-phase-out" target="_blank" rel="noopener">eight to fourteen years in 2010</a>, which drew large protests. Roughly <a href="https://www.cleanenergywire.org/factsheets/history-behind-germanys-nuclear-phase-out" target="_blank" rel="noopener">40,000 people</a> marched in Berlin that autumn.</p>
<p>Then came <a href="https://theenergycollective.com/fukushima-daiichi-explained/">Fukushima</a>. Merkel imposed a three-month moratorium within days of the disaster and took <a href="https://www.eia.gov/todayinenergy/detail.php?id=55559" target="_blank" rel="noopener">8 of the country&#8217;s 17 operating reactors</a> offline for review. By June, she had reversed course for good, keeping those reactors shut permanently and setting the remaining nine to close by <a href="https://www.cleanenergywire.org/factsheets/history-behind-germanys-nuclear-phase-out" target="_blank" rel="noopener">2022 with support from more than 80 percent of Bundestag members</a>.</p>
<p>The last three plants, Emsland, Isar 2 and Neckarwestheim, were due to close at the end of <a href="https://www.cleanenergywire.org/factsheets/history-behind-germanys-nuclear-phase-out" target="_blank" rel="noopener">2022</a>. Russia&#8217;s invasion of Ukraine and the resulting gas squeeze pushed Berlin to delay that by three and a half months. Parliament approved a one-time extension to <a href="https://www.eia.gov/todayinenergy/detail.php?id=55559" target="_blank" rel="noopener">April 15, 2023</a>, with no further extensions on offer. That&#8217;s the date nuclear power in Germany ended, and the last day it showed up on a German electricity bill in any form.</p>
<table>
<thead>
<tr>
<th>Date</th>
<th>What happened</th>
</tr>
</thead>
<tbody>
<tr>
<td>2000-2002</td>
<td>Schröder government and utilities agree the &#8220;nuclear consensus,&#8221; written into law as an Atomic Energy Act amendment</td>
</tr>
<tr>
<td>2010</td>
<td>Merkel government extends reactor lifespans by 8-14 years</td>
</tr>
<tr>
<td>March 2011</td>
<td>Fukushima triggers a moratorium, and 8 of Germany&#8217;s 17 reactors go offline</td>
</tr>
<tr>
<td>June 2011</td>
<td>Bundestag votes to close the remaining nine reactors by 2022</td>
</tr>
<tr>
<td>Late 2022</td>
<td>Gas crisis prompts a short extension for the last three plants</td>
</tr>
<tr>
<td>April 15, 2023</td>
<td>Emsland, Isar 2 and Neckarwestheim close, taking German nuclear output to zero</td>
</tr>
</tbody>
</table>
<p>Source: Clean Energy Wire, U.S. Energy Information Administration (EIA)</p>
<h2>Fusion and small reactors are the only nuclear left on the table</h2>
<p>Katherina Reiche, Germany&#8217;s energy minister, said in <a href="https://www.cleanenergywire.org/news/germanys-new-energy-minister-rules-out-return-conventional-nuclear" target="_blank" rel="noopener">May 2025</a> that the phase-out is complete, and that restarting conventional reactors would need investor money and trust the country doesn&#8217;t have right now. &#8220;I don&#8217;t see companies investing on their own initiative,&#8221; she said. The coalition agreement she serves under still funds <a href="https://www.cleanenergywire.org/news/germanys-new-energy-minister-rules-out-return-conventional-nuclear" target="_blank" rel="noopener">a first nuclear fusion reactor</a> in Germany, and Reiche called small modular reactors <a href="https://www.cleanenergywire.org/news/germanys-new-energy-minister-rules-out-return-conventional-nuclear" target="_blank" rel="noopener">&#8220;another matter&#8221;</a> worth a separate look.</p>
<p>Everything else in her ministry&#8217;s actual plan, wind, solar, storage and transmission, is the technology already running the German grid without a single reactor. Conventional nuclear in Germany is closed for good. The <a href="https://theenergycollective.com/nuclear-fusion/">fusion reactor</a> and the small modular reactors Reiche mentioned are still lines in a coalition agreement. Neither one has produced a kilowatt-hour yet.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>What happened at Fukushima Daiichi, explained simply</title>
		<link>https://theenergycollective.com/fukushima-daiichi-explained/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 28 Sep 2026 18:17:05 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/fukushima-daiichi-explained/</guid>

					<description><![CDATA[On March 11, 2011, a magnitude 9.0 earthquake off Japan's coast triggered a tsunami that knocked out power and cooling at Fukushima Daiichi, and the fuel in three reactors melted down within days.]]></description>
										<content:encoded><![CDATA[<p>A <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">magnitude 9.0 earthquake</a> struck off Japan&#8217;s northeast coast on March 11, 2011, and the tsunami it triggered knocked out power and cooling at the Fukushima Daiichi nuclear plant. Fuel inside three of its six reactors melted down within days. Regulators rated it a <a href="https://www.iaea.org/topics/response/fukushima-daiichi-nuclear-accident" target="_blank" rel="noopener">Level 7 accident</a>, <a href="https://www.iaea.org/sites/default/files/ines.pdf" target="_blank" rel="noopener">the top of the seven-level scale built to measure nuclear accidents</a>, the same rating <a href="https://www.iaea.org/sites/default/files/ines.pdf" target="_blank" rel="noopener">Chernobyl got in 1986</a>. TEPCO still expects <a href="https://www.world-nuclear-news.org/articles/fuel-debris-removal-from-fukushima-reactors-delayed" target="_blank" rel="noopener">full decommissioning to take 30 to 40 years from the accident</a>, as of September 2026.</p>
<h2>The quake, then the wave</h2>
<p>The earthquake hit at <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">2:46 p.m. local time</a>. Fukushima Daiichi&#8217;s three operating reactors, <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">units 1 through 3, shut down automatically the instant the shaking started</a>, exactly what a reactor is built to do. <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">Units 4 through 6</a> were already offline for maintenance. The quake alone didn&#8217;t cause a meltdown.</p>
<p>What came next did.</p>
<p>The first tsunami wave reached the plant <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">about 41 minutes later, at 3:42 p.m.</a>. It crested at 14 to 15 meters, more than double the <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">6.1-meter seawall</a> TEPCO had built by 2009. That wall was itself a jump from the plant&#8217;s <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">original 3.1-meter design</a> from the 1960s.</p>
<p>The water went over the wall, <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">drowning 12 of the plant&#8217;s 13 backup generators</a> along with the seawater pumps that cooled them. <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">All six of the plant&#8217;s off-site power lines were already dead</a> from the earthquake itself, so units 1 through 3 lost every source of power for their cooling systems at once. No grid power and no working generators is called a station blackout, the condition that turned an earthquake and a flood into a nuclear accident. It&#8217;s the failure you might have during a bad storm at home, except here the backup pumps were what stood between the reactor cores and overheating.</p>
<h2>Why a shut-down reactor still needs cooling</h2>
<p>A reactor that&#8217;s shut down isn&#8217;t a reactor that&#8217;s cold. The moment the control rods drop and the chain reaction stops, the fuel still holds radioactive fission byproducts such as cesium and iodine. They keep decaying on their own, and that decay throws off heat. Decay heat runs <a href="https://engineeringlibrary.org/reference/heat-transfer-decay-heat-doe-handbook" target="_blank" rel="noopener">about 7% of full power at shutdown</a>, falling to roughly 2% within the first hour and about 1% after a day, according to DOE reactor operator training material.</p>
<p>You don&#8217;t need reactor physics to feel why one percent still isn&#8217;t nothing, since a pot pulled off a hot burner stays too hot to touch long after the flame&#8217;s out. <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">Unit 1 was rated at 460 megawatts of electrical output</a>, so even a sliver of its full power is real heat with nowhere to go unless water keeps moving through the core. Cut the pumps, and the water already in the vessel boils away on its own. Once the fuel rods sit exposed to steam instead of water, the zirconium cladding around them reacts with that steam, throws off hydrogen gas, and the fuel starts to melt.</p>
<h2>How three reactors melted down</h2>
<p>With no power for the pumps, each of the plant&#8217;s three running reactors melted on its own timeline, as the hours below show.</p>
<table>
<thead>
<tr>
<th>Reactor</th>
<th>Core damage began</th>
<th>What happened to the fuel</th>
</tr>
</thead>
<tbody>
<tr>
<td>Unit 1</td>
<td>About 4 hours after shutdown</td>
<td>Most fuel melted and pooled at the bottom of the pressure vessel by early March 12</td>
</tr>
<tr>
<td>Unit 2</td>
<td>About 77 hours after shutdown</td>
<td>Substantial fuel melting, containment damaged</td>
</tr>
<tr>
<td>Unit 3</td>
<td>About 44 hours after shutdown</td>
<td>Fuel melted through the morning of March 13</td>
</tr>
</tbody>
</table>
<p><em>Source: <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">World Nuclear Association</a></em></p>
<p>Plant operators tried venting steam and pumping in seawater, improvised responses to a situation the plant wasn&#8217;t built for. It&#8217;s the kind of call you&#8217;d dread making at work with half your instruments dead, except here the stakes were three reactor cores. Neither stopped the melting, and the fuel in all three reactors slumped, in places burning through the steel of the vessels themselves.</p>
<p>The hydrogen building up inside the damaged reactors found an ignition source in three separate buildings. <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">Unit 1&#8217;s reactor building exploded on the afternoon of March 12</a>, blowing the roof and upper walls apart, and Unit 3&#8217;s building went the same way on the morning of March 14. Unit 4 had no fuel loaded in its own reactor, but it exploded anyway, after hydrogen vented from Unit 3 backed up through shared ducts and <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">ignited early on March 15</a>.</p>
<p>The blasts scattered debris and made it much harder for workers to get close enough to restore cooling.</p>
<h2>Evacuating a quarter million people, and the deaths that followed</h2>
<p>Japan widened its evacuation zone in stages as the accident worsened, starting with <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">a 2-kilometer radius</a> on the evening of March 11. By the next evening, the radius had grown to <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">3, then 10, then 20 kilometers</a>.</p>
<p>At its peak, in May 2012, about <a href="https://www.pref.fukushima.lg.jp/site/portal-english/en-1-4-1.html" target="_blank" rel="noopener">160,000 people had left their homes</a>, roughly 100,000 of them still inside Fukushima Prefecture and the other 60,000 scattered elsewhere in Japan. As of <a href="https://www.pref.fukushima.lg.jp/site/portal-english/en-1-4-1.html" target="_blank" rel="noopener">May 1, 2026, the prefecture still counted 22,625 people as evacuees</a>. If you had to leave your own town and still couldn&#8217;t move back nearly fifteen years later, that&#8217;s what the number means, since many of those evacuees come from towns where the return order has never fully lifted.</p>
<p>The evacuation itself had a body count. A peer-reviewed study covering March 2011 through July 2021 <a href="https://www.sciencedirect.com/science/article/pii/S2666765722000837" target="_blank" rel="noopener">found 2,326 certified disaster-related deaths in Fukushima Prefecture</a>, deaths from the physical and medical strain of the evacuation itself. The study separates these from deaths the earthquake and tsunami caused directly, and from any radiation-linked deaths. Elderly hospital and nursing-home patients were hit hardest, moved long distances under chaotic conditions with medical care interrupted.</p>
<p>That toll, <a href="https://www.sciencedirect.com/science/article/pii/S2666765722000837" target="_blank" rel="noopener">2,326 disaster-related deaths</a>, was well above the 1,610 people Fukushima Prefecture lost directly to the earthquake and tsunami.</p>
<h2>What radiation did to people&#8217;s health</h2>
<p>The United Nations Scientific Committee on the Effects of Atomic Radiation, known as UNSCEAR, <a href="https://www.unscear.org/unscear/en/areas-of-work/fukushima-report-faq.html" target="_blank" rel="noopener">studied Fukushima&#8217;s radiation exposures for a decade</a>, publishing its fullest assessment in 2020 and 2021. It found <a href="https://www.unscear.org/unscear/en/areas-of-work/fukushima-report-faq.html" target="_blank" rel="noopener">no adverse health effects among residents that could be attributed to radiation</a> from the accident. It also expects <a href="https://www.unscear.org/unscear/en/areas-of-work/fukushima-report-faq.html" target="_blank" rel="noopener">future radiation-linked health effects to stay undetectable</a> because the doses were so low.</p>
<p>The thyroid cancers found in screened children weren&#8217;t caused by radiation either. UNSCEAR attributes them to <a href="https://www.unscear.org/unscear/en/areas-of-work/fukushima-report-faq.html" target="_blank" rel="noopener">an unusually sensitive ultrasound program</a> that caught thyroid abnormalities doctors wouldn&#8217;t otherwise have found at that age.</p>
<p>Emergency workers got a heavier dose than the public, as you&#8217;d expect from people running hoses inside a damaged plant. They <a href="https://www.unscear.org/unscear/en/areas-of-work/fukushima-report-faq.html" target="_blank" rel="noopener">averaged about 13 millisieverts between March 2011 and March 2012</a>, and 36% of them received more than 10 millisieverts. UNSCEAR still didn&#8217;t attribute any deaths or any likely detectable rise in cancer to that exposure. That finding runs against the popular fear surrounding the disaster, worth keeping in mind whenever people debate <a href="https://theenergycollective.com/is-nuclear-power-safe/">whether nuclear power is safe</a>.</p>
<h2>Treated water out, fuel debris still stuck inside</h2>
<p>Cooling the melted cores never stopped, and the water used has to go somewhere once it&#8217;s contaminated. TEPCO built the Advanced Liquid Processing System, ALPS, to <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">filter out 62 of the water&#8217;s radioactive elements</a> before releasing it through an offshore pipe starting August 24, 2023, keeping everything but tritium, which is chemically bound into the water and can&#8217;t be filtered out. If you&#8217;ve heard concerns about seafood near Fukushima, this is the process built to answer them, stripping out everything the filters can catch before any of it reaches the ocean.</p>
<p>By the end of 2025, TEPCO had discharged <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">roughly 133,000 cubic meters across 17 batches</a>, each diluted below regulatory tritium limits before release. The IAEA&#8217;s most recent review <a href="https://www.ans.org/news/2025-09-16/article-7369/iaea-report-confirms-safety-of-discharged-fukushima-water/" target="_blank" rel="noopener">found the discharge meeting international safety standards</a> in its September 2025 report.</p>
<p>The parts of the plant that could be defueled the normal way mostly have been. <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">1,331 spent fuel assemblies came out of Unit 4&#8217;s storage pool</a> by December 2014, and Unit 3&#8217;s pool was emptied by February 2021. The harder problem is the <a href="https://www.world-nuclear-news.org/articles/fuel-debris-removal-from-fukushima-reactors-delayed" target="_blank" rel="noopener">roughly 880 tonnes of melted fuel debris</a> fused with structural metal and concrete inside units 1 through 3, in ways nobody has fully mapped yet.</p>
<p>Progress there is slow on purpose. Workers pulled <a href="https://www.nippon.com/en/japan-topics/g02501/the-first-small-steps-debris-removal-at-fukushima-daiichi.html" target="_blank" rel="noopener">the first trial sample of fuel debris from Unit 2</a>, about 0.7 grams, in November 2024, gripped by a tool built to reach through a small opening in the damaged container. TEPCO has since concluded that <a href="https://www.world-nuclear-news.org/articles/fuel-debris-removal-from-fukushima-reactors-delayed" target="_blank" rel="noopener">preparing for full-scale removal alone needs 12 to 15 years</a>, pushing the start date to 2037 at the earliest, well past the early-2030s target officials once set.</p>
<p>A 2017 government estimate put the total decommissioning cost near <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">22 trillion yen, about $190 billion at the time</a>, double what officials had projected a few years earlier.</p>
<h2>What the nuclear industry changed afterward</h2>
<p>Fukushima happened because a plant lost every source of power at once with no way to cool its cores. Regulators everywhere rewrote their rules around that failure mode. In the United States, <a href="https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/japan-events" target="_blank" rel="noopener">the NRC ordered reactors to keep portable pumps and generators on hand</a>, along with battery packs and chargers, starting in March 2012, all capable of cooling the reactor and its spent fuel pool through an event beyond the plant&#8217;s original design.</p>
<p>The industry built this out under the name FLEX, backed by <a href="https://www.nei.org/resources/fact-sheets/upgrades-backup-safety-systems-fukushima-response" target="_blank" rel="noopener">two national response centers</a> in Memphis and Phoenix that can ship heavier equipment to any reactor site within 24 hours. If a reactor near you shares Fukushima&#8217;s General Electric containment design, it already has the hardened vents and spent fuel pool instrumentation the NRC ordered for the <a href="https://www.nei.org/resources/fact-sheets/upgrades-backup-safety-systems-fukushima-response" target="_blank" rel="noopener">31 U.S. reactors built that way</a>. The industry finished installing all of it at every <a href="https://theenergycollective.com/how-many-nuclear-power-plants/">U.S. nuclear power plant</a>, <a href="https://www.nei.org/resources/fact-sheets/upgrades-backup-safety-systems-fukushima-response" target="_blank" rel="noopener">at a combined cost topping $4 billion</a>, according to the Nuclear Energy Institute.</p>
<p>Spending that much money is what it costs to guard against an accident nobody predicted, not the one the plants were designed for. Not every country chose to keep paying it. <a href="https://theenergycollective.com/germany-nuclear-phase-out-emissions-coal/">Germany shut its nuclear fleet down entirely</a> rather than retrofit it, a decision that still shapes the <a href="https://theenergycollective.com/nuclear-outlook/">nuclear power outlook</a> for the reactors still running today.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Nuclear energy&#8217;s future in the US and worldwide</title>
		<link>https://theenergycollective.com/nuclear-outlook/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 28 Sep 2026 17:18:58 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/nuclear-outlook/</guid>

					<description><![CDATA[The future of nuclear energy includes US plant restarts backed by tech money and a Chinese reactor-building boom that's now roughly half the world's total.]]></description>
										<content:encoded><![CDATA[<p><em>Originally published November 26, 2015. Updated September 28, 2026.</em></p>
<p>Nuclear power supplied <a href="https://www.eia.gov/todayinenergy/detail.php?id=65104" target="_blank" rel="noopener">19% of the electricity generated in the US in 2024</a>, and American plants are doing something the industry has never done before. Reactors that fully shut down are switching back on instead of staying closed for good. If you&#8217;re on the US grid, roughly one in five of the electrons reaching your outlet already came from one of those <a href="https://www.eia.gov/todayinenergy/detail.php?id=65104" target="_blank" rel="noopener">94 reactors at 54 plants</a>, which together produce about 97 gigawatts.</p>
<p>Worldwide, reactor counts are flat too, but <a href="https://world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power" target="_blank" rel="noopener">roughly half of the new construction is happening in China</a>. Nuclear&#8217;s <a href="https://www.worldnuclearreport.org/Nuclear-provides-only-9-of-global-electricity" target="_blank" rel="noopener">share of the world&#8217;s electricity has slid to 9% in 2025</a>, down from <a href="https://www.worldnuclearreport.org/Nuclear-provides-only-9-of-global-electricity" target="_blank" rel="noopener">a peak of 17.5% in 1996</a>, per the World Nuclear Industry Status Report.</p>
<h2>How many US reactors are operating</h2>
<p>That fleet of <a href="https://theenergycollective.com/how-many-nuclear-power-plants/">US nuclear power plants</a> isn&#8217;t the whole clean-power picture where you live. <a href="https://carbonherald.com/eia-40-of-us-electricity-now-emissions-free/" target="_blank" rel="noopener">Nuclear and renewables together supplied about 40% of US electricity generation</a> in the first ten months of 2023, with nuclear responsible for 18 of those percentage points and <a href="https://theenergycollective.com/renewable-energy/">renewable energy sources</a> the other 22, since EIA <a href="https://theenergycollective.com/is-nuclear-energy-renewable/">doesn&#8217;t class nuclear as renewable</a>. If you pay a power bill anywhere in the US, roughly two of every five kilowatt-hours behind it already came from a source that doesn&#8217;t burn fuel.</p>
<p>Worldwide, the fleet is bigger and holding roughly steady too. The <a href="https://world-nuclear.org/information-library/current-and-future-generation/nuclear-power-in-the-world-today" target="_blank" rel="noopener">World Nuclear Association counts about 440 reactors running in 31 countries</a>. Combined, those reactors produce <a href="https://world-nuclear.org/information-library/current-and-future-generation/nuclear-power-in-the-world-today" target="_blank" rel="noopener">400 to 404 gigawatts of capacity</a>.</p>
<p>Retirements happen even while that total holds steady. In 2025, the IEA counted <a href="https://www.iea.org/reports/global-energy-review-2026/technology-nuclear" target="_blank" rel="noopener">3 gigawatts of nuclear capacity retired worldwide</a>, two-thirds of it in Belgium, offset by <a href="https://www.iea.org/reports/global-energy-review-2026/technology-nuclear" target="_blank" rel="noopener">3 gigawatts of new capacity in China, India and Russia</a>. What&#8217;s shrinking is nuclear&#8217;s slice of a power market that keeps getting bigger.</p>
<h2>American plants are coming back online</h2>
<p>Palisades, an 805-megawatt plant in Michigan, shut down in May 2022 and <a href="https://www.energy.gov/edf/palisades" target="_blank" rel="noopener">began reloading fuel in late August 2026</a>, aiming to become one of the first US commercial reactors to fully restart after closing for good. Then it hit a real snag.</p>
<p>The NRC confirmed on <a href="https://www.thenationalnews.com/future/technology/2026/09/23/palisades-power-plant-nuclear-incident/" target="_blank" rel="noopener">September 23, 2026</a> that a fuel assembly had tipped during loading, with no radiological release, and the plant&#8217;s final restart date is on hold while regulators sort out next steps.</p>
<p>Pennsylvania&#8217;s Three Mile Island Unit 1, rebranded the Crane Clean Energy Center, is <a href="https://world-nuclear.org/information-library/country-profiles/countries-t-z/usa-nuclear-power" target="_blank" rel="noopener">targeting a 2027 commercial restart at 819 megawatts</a>. Iowa&#8217;s Duane Arnold, at 601 megawatts, is aiming for <a href="https://world-nuclear.org/information-library/country-profiles/countries-t-z/usa-nuclear-power" target="_blank" rel="noopener">an early 2029 return</a>.</p>
<p>California&#8217;s Diablo Canyon, once scheduled to close around 2025, got a <a href="https://www.ans.org/news/2026-04-03/article-7906/nrc-approves-diablo-canyon-license-renewal-extension/" target="_blank" rel="noopener">20-year license renewal from the NRC in April 2026</a> and remains the state&#8217;s only operating nuclear plant, so every nuclear watt reaching a California home or business still comes from that one site. For how nuclear&#8217;s safety compares with other power sources, see <a href="/is-nuclear-power-safe/">how safe nuclear power is</a>.</p>
<h2>AI&#8217;s power demand is paying for the restarts</h2>
<p>The restarts aren&#8217;t happening out of nostalgia. Microsoft signed a 20-year power purchase agreement worth <a href="https://smrintel.com/nuclear-data-center-deals/" target="_blank" rel="noopener">roughly $16 billion, announced in September 2024</a>, to buy electricity from the Crane Clean Energy Center once it&#8217;s running. The US Department of Energy backed the project with <a href="https://world-nuclear.org/information-library/country-profiles/countries-t-z/usa-nuclear-power" target="_blank" rel="noopener">a $1 billion loan in November 2025</a>.</p>
<p>Other companies are signing similar deals. By July 2026, tech companies had committed to <a href="https://smrintel.com/nuclear-data-center-deals/" target="_blank" rel="noopener">roughly 9.8 gigawatts across 13 separate deals</a> for nuclear power as <a href="https://theenergycollective.com/how-much-energy-does-ai-use/">AI energy consumption</a> climbs.</p>
<p>Meta&#8217;s agreements add up to as much as 5.2 gigawatts, including <a href="https://smrintel.com/nuclear-data-center-deals/" target="_blank" rel="noopener">4 gigawatts of TerraPower&#8217;s Natrium reactor for delivery between 2032 and 2035</a>, plus <a href="https://smrintel.com/nuclear-data-center-deals/" target="_blank" rel="noopener">1.2 gigawatts from Oklo&#8217;s Aurora reactor</a>.</p>
<p>Amazon has committed to up to <a href="https://smrintel.com/nuclear-data-center-deals/" target="_blank" rel="noopener">960 megawatts through a dozen X-energy Xe-100 reactors</a>, backed by a <a href="https://smrintel.com/nuclear-data-center-deals/" target="_blank" rel="noopener">$700 million investment</a>. Google struck its own deal with Kairos Power for a <a href="https://smrintel.com/nuclear-data-center-deals/" target="_blank" rel="noopener">500-megawatt fleet of small reactors aimed at 2030</a>.</p>
<p>None of this is free for everyone else on the grid. PJM, the grid operator that covers Washington DC and states from Illinois to New Jersey, expects <a href="https://theenergycollective.com/data-center-statistics/">data center demand</a> to push some customers&#8217; bills up by <a href="https://www.canarymedia.com/articles/data-centers/pjm-record-capacity-costs-rising-bills" target="_blank" rel="noopener">as much as 5% in the year starting June 2026</a>.</p>
<h2>China is building about half of the world&#8217;s new reactors</h2>
<p>China&#8217;s fleet stands at <a href="https://world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power" target="_blank" rel="noopener">64 reactors totaling 63,985 megawatts</a>, and the country isn&#8217;t slowing down. Another <a href="https://world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power" target="_blank" rel="noopener">38 reactors are under construction there</a>, adding up to 39,694 megawatts, which is close to half of the roughly <a href="https://world-nuclear.org/information-library/current-and-future-generation/nuclear-power-in-the-world-today" target="_blank" rel="noopener">80 reactors the World Nuclear Association counts under construction worldwide</a>. In March 2026, China&#8217;s 15th Five-Year Plan set a <a href="https://world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power" target="_blank" rel="noopener">target of 110 gigawatts of nuclear capacity by 2030</a>.</p>
<p>Outside China, growth is thin. Of the <a href="https://www.iea.org/reports/global-energy-review-2026/technology-nuclear" target="_blank" rel="noopener">10 reactor construction starts worldwide in 2025</a>, nine were in China and one was in Russia, according to the International Energy Agency. If you were hoping one of these projects would break ground near you and bring construction jobs with it, the odds outside those two countries were close to zero.</p>
<h2>Small reactors are closer to real, years behind schedule</h2>
<p>NuScale was supposed to prove small modular reactors could work in the US, and it didn&#8217;t. Its VOYGR design became the first SMR <a href="https://smrintel.com/nuscale-what-happened/" target="_blank" rel="noopener">certified by the NRC in January 2023</a>. Its flagship Utah project collapsed in <a href="https://smrintel.com/nuscale-what-happened/" target="_blank" rel="noopener">November 2023, after costs rose from $5.3 billion to $9.2 billion</a>. That overrun pushed the target price from <a href="https://smrintel.com/nuscale-what-happened/" target="_blank" rel="noopener">$58 to $89 per megawatt-hour</a>, the rate the towns and utilities that had signed on would have paid for every megawatt-hour NuScale delivered.</p>
<p>For more on how nuclear&#8217;s costs stack up against other power sources, see <a href="/solar-vs-nuclear-cost/">how solar and nuclear costs compare</a>. NuScale&#8217;s lead project shifted to Romania, a <a href="https://world-nuclear-news.org/articles/final-investment-decision-taken-for-romanias-smrs" target="_blank" rel="noopener">462-megawatt plant with six modules</a> that reached a final investment decision, though construction hadn&#8217;t started there as of September 2026.</p>
<p>Back in the US, the Tennessee Valley Authority&#8217;s BWRX-300 reactor at Clinch River got <a href="https://energiesmedia.com/nrc-recommends-tva-bwrx-300-reactor/" target="_blank" rel="noopener">an NRC staff recommendation for a construction permit in June 2026</a>, with a mandatory hearing held August 13, 2026, and commissioners&#8217; final decision still pending.</p>
<p>Kairos Power <a href="https://www.ans.org/news/2026-04-21/article-7964/kairos-power-breaks-ground-on-first-powerproducing-reactor-in-oak-ridge/" target="_blank" rel="noopener">broke ground in April 2026</a> on its Hermes 2 demonstration reactor in Oak Ridge, Tennessee, its first design meant to generate power, separate from the non-power Hermes 1 test unit it&#8217;s been building since 2024. And TerraPower&#8217;s Natrium reactor in Kemmerer, Wyoming, became the first full-scale advanced reactor design to <a href="https://www.energy.gov/ne/articles/nrc-issues-construction-permit-terrapowers-natrium-advanced-reactor" target="_blank" rel="noopener">win an NRC construction permit in March 2026</a>, a 345-megawatt design that stores heat in molten salt.</p>
<h2>Nuclear&#8217;s slice of the world&#8217;s power keeps shrinking</h2>
<p>Nuclear&#8217;s share of global electricity <a href="https://www.worldnuclearreport.org/Nuclear-provides-only-9-of-global-electricity" target="_blank" rel="noopener">fell to 9% in 2025</a>, down from <a href="https://www.worldnuclearreport.org/Nuclear-provides-only-9-of-global-electricity" target="_blank" rel="noopener">a peak of 17.5% in 1996</a>, according to the World Nuclear Industry Status Report, a group that&#8217;s generally critical of the nuclear industry but whose numbers get cited widely anyway. World electricity demand has grown faster than new reactors have, even as a decade of debate over climate goals argued nuclear needs to be part of the answer.</p>
<p>For anyone whose power already leans on nuclear, that slide doesn&#8217;t cut watts today. Grid planners will have to find the next decade&#8217;s clean-power growth from sources other than nuclear instead, and both the US restart wave and China&#8217;s buildout are still too small to close that gap by themselves.</p>
<h2>The restart wave hasn&#8217;t reversed nuclear&#8217;s shrinking share yet</h2>
<p>A handful of decisions still pending this decade will say whether that changes. The NRC&#8217;s commissioners still have to rule on the Tennessee Valley Authority&#8217;s Clinch River permit after the <a href="https://energiesmedia.com/nrc-recommends-tva-bwrx-300-reactor/" target="_blank" rel="noopener">August 13, 2026 hearing</a>, a ruling that will decide whether TVA&#8217;s BWRX-300 becomes the second advanced reactor design under construction in the US alongside TerraPower&#8217;s Natrium.</p>
<p><a href="https://www.thenationalnews.com/future/technology/2026/09/23/palisades-power-plant-nuclear-incident/" target="_blank" rel="noopener">Palisades&#8217; final restart timeline is on hold</a> while regulators finish reviewing the fuel-assembly incident, and Duane Arnold is <a href="https://world-nuclear.org/information-library/country-profiles/countries-t-z/usa-nuclear-power" target="_blank" rel="noopener">aiming for an early 2029 return</a>. China, meanwhile, still has to close most of the distance to its <a href="https://world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power" target="_blank" rel="noopener">110-gigawatt target for 2030</a> from a base of roughly 64 gigawatts operating and 40 gigawatts under construction.</p>
<p>A federal regulator, a Michigan repair crew, an Iowa utility&#8217;s schedule and Chinese state planners each hold one piece of whether the 2030s look different from the 2020s for anyone counting on nuclear power to help run their grid.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Is Nuclear Power Safe? What the Death-Rate Data Shows</title>
		<link>https://theenergycollective.com/is-nuclear-power-safe/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 28 Sep 2026 17:17:58 +0000</pubDate>
				<category><![CDATA[Nuclear]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/is-nuclear-power-safe/</guid>

					<description><![CDATA[Measured by deaths per unit of electricity produced, nuclear power is one of the safest sources there is, well below coal, oil, gas, and large hydropower. That holds even with Chernobyl and Fukushima counted in.]]></description>
										<content:encoded><![CDATA[<p>Nuclear power is one of the safest ways to generate electricity, at about <a href="https://ourworldindata.org/safest-sources-of-energy" target="_blank" rel="noopener">0.03 deaths per terawatt-hour</a> once Chernobyl and Fukushima are counted in, according to Our World in Data&#8217;s analysis of historical accidents and pollution deaths. That rate sits close to wind and solar and far below coal or oil. If a utility near you is choosing between a new reactor and an aging coal plant, this is the number that choice turns on.</p>
<p>Nuclear waste still has to go somewhere. A bad accident costs far more than the death count alone shows.</p>
<h2>What deaths per terawatt-hour measures</h2>
<p>One terawatt-hour is roughly what a mid-sized country&#8217;s grid delivers in a few hours, or what a single large power plant produces running for a year or two. The comparison below combines <a href="http://large.stanford.edu/courses/2016/ph241/orozco1/docs/markandya.pdf" target="_blank" rel="noopener">a 2007 life-cycle study of electricity and health published in The Lancet</a> with <a href="https://www.osti.gov/etdeweb/biblio/21059421" target="_blank" rel="noopener">a database of 279 major energy accidents</a>.</p>
<p>By that tally, <a href="https://ourworldindata.org/safest-sources-of-energy" target="_blank" rel="noopener">coal kills about 24.6 people per terawatt-hour and oil about 18.4</a>, almost entirely from the sulfur dioxide and fine particulates that combustion pushes into the air year after year. <a href="https://ourworldindata.org/safest-sources-of-energy" target="_blank" rel="noopener">Gas comes in at 2.8</a>, and nuclear is lower still. If your electricity comes from a coal-heavy grid, that pollution does not stay at the plant. It moves into the same air your town breathes, which is what a death rate like this is counting.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Deaths per TWh</th>
<th>Main driver</th>
</tr>
</thead>
<tbody>
<tr>
<td>Coal</td>
<td>24.6</td>
<td>Air pollution</td>
</tr>
<tr>
<td>Oil</td>
<td>18.4</td>
<td>Air pollution</td>
</tr>
<tr>
<td>Gas</td>
<td>2.8</td>
<td>Air pollution, some accidents</td>
</tr>
<tr>
<td>Hydropower</td>
<td>1.3</td>
<td>Dam failures, mostly one event</td>
</tr>
<tr>
<td>Nuclear</td>
<td>0.03</td>
<td>Chernobyl and Fukushima</td>
</tr>
<tr>
<td>Wind</td>
<td>0.04</td>
<td>Construction and maintenance accidents</td>
</tr>
<tr>
<td>Solar</td>
<td>0.02</td>
<td>Installation accidents</td>
</tr>
</tbody>
</table>
<p><em>Source: <a href="https://ourworldindata.org/safest-sources-of-energy" target="_blank" rel="noopener">Our World in Data, &#8220;What are the safest and cleanest sources of energy?&#8221;</a>, combining Markandya and Wilkinson (2007) with a database of historical energy accidents.</em></p>
<p>Hydropower&#8217;s low average hides a single outlier. Nearly all of that death toll traces to one event, the Banqiao Dam failure in China in 1975. The same analysis puts the toll at <a href="https://ourworldindata.org/safest-sources-of-energy" target="_blank" rel="noopener">an estimated 171,000 people</a>.</p>
<p>Estimates for that single event vary widely. Chinese authorities have cited <a href="https://damfailures.org/case-study/banqiao-dam-china-1975" target="_blank" rel="noopener">26,000 confirmed dead, versus a Human Rights Watch estimate of 230,000</a> once deaths from the disease and famine that followed the flood get counted in.</p>
<h2>Chernobyl&#8217;s death toll</h2>
<p>The Chernobyl reactor exploded in April 1986, in what is now Ukraine. By 2005, <a href="https://www.who.int/news/item/05-09-2005-chernobyl-the-true-scale-of-the-accident" target="_blank" rel="noopener">fewer than 50 deaths had been directly attributed to radiation exposure, almost all of them rescue workers who took the highest doses in the accident&#8217;s first hours and months</a>, according to the World Health Organization.</p>
<p>The WHO&#8217;s 2005 assessment also projected <a href="https://www.who.int/news/item/05-09-2005-chernobyl-the-true-scale-of-the-accident" target="_blank" rel="noopener">up to 4,000 eventual deaths from radiation-induced cancer</a> among the roughly 600,000 people most exposed. The agency put that at <a href="https://www.who.int/news/item/05-09-2005-chernobyl-the-true-scale-of-the-accident" target="_blank" rel="noopener">an increase of about 3% over the cancer rate that group would see anyway</a>, too small a rise to observe directly against the background rate. If you had been among that group, the added risk would have been small enough to hide inside your normal odds, invisible on any chart you would see.</p>
<p>Radioactive iodine released by the fire also drove up thyroid cancer among people who were children in the contaminated region at the time. By 2015, close to <a href="https://news.un.org/en/story/2018/04/1008292" target="_blank" rel="noopener">20,000 thyroid cancer cases had been registered in the affected areas, and the United Nations&#8217; scientific committee on radiation attributed about one in four of them to the accident</a>.</p>
<p>The reactor involved was an RBMK design that <a href="https://world-nuclear.org/information-library/appendices/rbmk-reactors" target="_blank" rel="noopener">lacked the containment structure standard on Western reactors</a> and had a control-rod flaw that, on an emergency shutdown, briefly <a href="https://world-nuclear.org/information-library/appendices/rbmk-reactors" target="_blank" rel="noopener">added reactivity to the bottom of the core instead of cutting it</a>. The World Nuclear Association treats that flaw as central to why the accident escalated the way it did.</p>
<h2>Fukushima&#8217;s death toll</h2>
<p>The Fukushima Daiichi meltdown, in March 2011, didn&#8217;t kill anyone through direct radiation exposure. <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">One plant worker died in 2018 of lung cancer that Japan&#8217;s government attributed to his radiation exposure on the job</a>, the only radiation-linked death the accident has produced.</p>
<p>More than <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">100,000 people were moved out of the area as a precaution</a>, on top of about <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">19,500 people killed by the earthquake and tsunami itself</a>. Japan has certified <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">2,313 deaths as disaster-related among Fukushima evacuees</a>, most from disrupted hospital care and the strain of relocating elderly and hospitalized patients during the evacuation. If a meltdown forced an evacuation where you live, the disruption of packing up your home on short notice would likely affect you more than radiation itself.</p>
<p>About <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">27,000 people from Fukushima were still living as evacuees as of November 2025</a>, 14 years on.</p>
<h2>Nuclear waste, in volumes</h2>
<p>A reactor generating 1,000 megawatts produces about <a href="https://world-nuclear.org/nuclear-essentials/what-is-nuclear-waste-and-what-do-we-do-with-it" target="_blank" rel="noopener">3 cubic meters of high-level waste a year when its fuel is reprocessed</a>, roughly the size of a shed you might keep in your backyard, against roughly <a href="https://world-nuclear.org/nuclear-essentials/what-is-nuclear-waste-and-what-do-we-do-with-it" target="_blank" rel="noopener">300,000 tonnes of ash from a coal plant generating a similar amount of power</a>.</p>
<p>High-level waste and used fuel together make up <a href="https://world-nuclear.org/nuclear-essentials/what-is-nuclear-waste-and-what-do-we-do-with-it" target="_blank" rel="noopener">less than 3% of nuclear waste by volume but hold 95% of its radioactivity</a>, the association says. <a href="https://world-nuclear.org/nuclear-essentials/what-is-nuclear-waste-and-what-do-we-do-with-it" target="_blank" rel="noopener">Intermediate-level waste adds another 7%, and the remaining 90% is only lightly contaminated tools and clothing</a>.</p>
<p>About <a href="https://world-nuclear.org/nuclear-essentials/what-is-nuclear-waste-and-what-do-we-do-with-it" target="_blank" rel="noopener">97% of used fuel can be recycled into new fuel, most of it reusable uranium</a>. What can&#8217;t be recycled is vitrified, mixed into glass and sealed inside metal canisters, then buried in deep geological repositories, an approach <a href="https://world-nuclear.org/nuclear-essentials/what-is-nuclear-waste-and-what-do-we-do-with-it" target="_blank" rel="noopener">France, Japan, Belgium and Russia</a> already use for permanent disposal.</p>
<h2>Radiation risk fades with time</h2>
<p>Radioactivity isn&#8217;t a fixed hazard. It decays on a known schedule. <a href="https://world-nuclear.org/nuclear-essentials/what-is-nuclear-waste-and-what-do-we-do-with-it" target="_blank" rel="noopener">Used fuel&#8217;s radioactivity falls to about a thousandth of its initial level after 40 years</a>, the World Nuclear Association says.</p>
<p>The same group states that <a href="https://world-nuclear.org/nuclear-essentials/what-is-nuclear-waste-and-what-do-we-do-with-it" target="_blank" rel="noopener">nuclear waste has never caused harm to people since the civil industry began</a>, a claim that holds up against decades of operating records. That&#8217;s a claim about the industry&#8217;s history, though, not a guarantee about storage arrangements holding for the thousands of years some of this material stays hazardous.</p>
<p>Four decades is close to a full career. If nuclear expansion means new jobs in your county, guarding and monitoring that waste is the part of the job that outlasts whoever signs up for it.</p>
<h2>What the death rate doesn&#8217;t put a price on</h2>
<p>Deaths per terawatt-hour answers one question well. Historically, which sources of electricity have killed the fewest people relative to how much power they&#8217;ve produced? On that question, nuclear does about as well as wind and solar, and far better than <a href="https://theenergycollective.com/fossil-fuels/">any fossil fuel</a>.</p>
<p>It answers a narrower question than people often assume. It&#8217;s a global historical average built mostly from twentieth-century reactors and two accidents. It doesn&#8217;t forecast what a reactor built under current safety regulation would do. It also treats a death from evacuation stress the same as a death from radiation exposure, which is fair for counting purposes but blurs how differently those two causes of death happen.</p>
<p>The number says nothing about what a bad accident costs. Estimates from the 1990s put <a href="https://www.who.int/news/item/05-09-2005-chernobyl-the-true-scale-of-the-accident" target="_blank" rel="noopener">Chernobyl&#8217;s cleanup and economic costs at hundreds of billions of dollars over two decades</a>, the World Health Organization says. Fukushima evacuees alone had received <a href="https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident" target="_blank" rel="noopener">about 9.7 trillion yen in compensation as of January 2021</a>. None of that shows up on your electricity bill today, but it is the bill someone eventually pays when a reactor fails, and it runs far higher for nuclear than for the <a href="https://theenergycollective.com/solar-vs-nuclear-cost/">low-mortality alternatives it gets grouped with</a>.</p>
<p>None of that changes the mortality data. Being statistically safe and having no downsides worth discussing are two different claims, and the costs above show which one survives. In 2024, nuclear supplied <a href="https://world-nuclear.org/information-library/current-and-future-generation/nuclear-power-in-the-world-today" target="_blank" rel="noopener">about 9% of the world&#8217;s electricity, or 2,667 terawatt-hours</a>.</p>
<p>Germany read those same safety numbers and still <a href="https://theenergycollective.com/germany-nuclear-phase-out-emissions-coal/">phased out nuclear power entirely</a>, leaning on coal to fill the gap, a decision about <a href="https://theenergycollective.com/nuclear-outlook/">cost and politics</a> more than accident risk. China read them the other way. <a href="https://www.eia.gov/todayinenergy/detail.php?id=65904" target="_blank" rel="noopener">28 new reactors were under construction there as of mid-2025</a>, the fastest pace of any country. On the death-rate numbers alone, nuclear is about as safe as wind and solar, and far safer than any fuel that burns.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: theenergycollective.com @ 2026-11-24 18:09:40 by W3 Total Cache
-->