<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Grid &amp; storage &#8211; Energy Collective</title>
	<atom:link href="https://theenergycollective.com/category/energy-infrastructure/feed/" rel="self" type="application/rss+xml" />
	<link>https://theenergycollective.com</link>
	<description>Charting the clean energy transition</description>
	<lastBuildDate>Mon, 23 Nov 2026 16:08:43 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://theenergycollective.com/wp-content/uploads/2025/09/the-energy-collective-logo-92x96.png</url>
	<title>Grid &amp; storage &#8211; Energy Collective</title>
	<link>https://theenergycollective.com</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>When was electricity invented?</title>
		<link>https://theenergycollective.com/when-was-electricity-invented/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 23 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1151</guid>

					<description><![CDATA[Nobody invented electricity, because it&#8217;s a natural force that people discovered and then learned to use over about 2,500 years, from the rubbed amber Thales is reported to&#8230;]]></description>
										<content:encoded><![CDATA[<p>Nobody invented electricity, because it&#8217;s a natural force that people discovered and then learned to use over about 2,500 years, from the rubbed amber <a href="https://www.eia.gov/kids/history-of-energy/timelines/electricity.php" target="_blank" rel="noopener">Thales is reported to have studied around 600 BC</a> to <a href="https://ethw.org/Milestones:Pearl_Street_Station,_1882" target="_blank" rel="noopener">Edison&#8217;s Pearl Street Station, which began supplying New York customers on September 4, 1882</a>. Wiring homes took longer, and <a href="https://www2.census.gov/library/publications/1975/compendia/hist_stats_colonial-1970/hist_stats_colonial-1970p2-chS.pdf" target="_blank" rel="noopener">98.8% of US homes had electric service by 1956</a>. Plenty of American families waited decades after Edison for a light switch, since <a href="https://www.richmondfed.org/publications/research/econ_focus/2020/q1/economic_history" target="_blank" rel="noopener">only about one in 10 farms had power in 1930</a>.</p>
<p>The dates come from the Royal Institution, IEEE, the National Park Service, DOE, EIA and the Census Bureau.</p>
<h2>What are the key dates in the history of electricity?</h2>
<p>The step that put electricity on sale was the opening of Pearl Street Station in New York, and the dates before it lead up to that switch.</p>
<table>
<thead>
<tr>
<th>Date</th>
<th>What happened</th>
<th>Who</th>
</tr>
</thead>
<tbody>
<tr>
<td>About 600 BC</td>
<td>Rubbed amber attracts light objects</td>
<td>Thales of Miletus (as reported)</td>
</tr>
<tr>
<td>1600</td>
<td>De Magnete published, &#8220;electrick force&#8221; named</td>
<td>William Gilbert</td>
</tr>
<tr>
<td>June 1752</td>
<td>Kite and key in a thunderstorm (exact day unknown)</td>
<td>Benjamin Franklin</td>
</tr>
<tr>
<td>1799 or 1800</td>
<td>Voltaic pile, the first battery</td>
<td>Alessandro Volta</td>
</tr>
<tr>
<td>29 August 1831</td>
<td>Induction ring shows magnetism can make current</td>
<td>Michael Faraday</td>
</tr>
<tr>
<td>October 1831</td>
<td>First electric generator (dynamo)</td>
<td>Michael Faraday</td>
</tr>
<tr>
<td>1879</td>
<td>Carbon filament bulb</td>
<td>Thomas Edison</td>
</tr>
<tr>
<td>4 September 1882</td>
<td>Pearl Street Station opens in New York</td>
<td>Thomas Edison</td>
</tr>
<tr>
<td>1 May 1888</td>
<td>US patent 381,968 for an electromagnetic motor</td>
<td>Nikola Tesla</td>
</tr>
<tr>
<td>13 July 1895</td>
<td>Folsom Powerhouse sends AC 35 km to Sacramento</td>
<td>Folsom Powerhouse</td>
</tr>
<tr>
<td>1895 to 1896</td>
<td>Niagara Falls hydropower station opens</td>
<td>Niagara Falls station</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/kids/history-of-energy/timelines/electricity.php" target="_blank" rel="noopener">EIA, Energy Kids electricity timeline</a>, <a href="https://pwg.gsfc.nasa.gov/Electric/-E14-history.htm" target="_blank" rel="noopener">NASA, history of electricity</a>, <a href="https://fi.edu/benjamin-franklin/kite-key-experiment" target="_blank" rel="noopener">The Franklin Institute</a>, <a href="https://ethw.org/Alessandro_Volta" target="_blank" rel="noopener">IEEE ETHW, Volta</a>, <a href="https://www.rigb.org/explore-science/explore/collection/michael-faradays-ring-coil-apparatus" target="_blank" rel="noopener">Royal Institution, Faraday&#8217;s ring</a> and <a href="https://www.rigb.org/explore-science/explore/collection/michael-faradays-generator" target="_blank" rel="noopener">Faraday&#8217;s generator</a>, <a href="https://www.nps.gov/edis/learn/kidsyouth/timeline-of-edison-and-his-inventions.htm" target="_blank" rel="noopener">National Park Service, Edison timeline</a>, <a href="https://patents.google.com/patent/US381968" target="_blank" rel="noopener">Google Patents, US 381,968</a> and <a href="https://spectrum.ieee.org/the-birthplace-of-the-ac-grid" target="_blank" rel="noopener">IEEE Spectrum, Folsom</a>.</p>
<p>On its first day Pearl Street served <a href="https://ethw.org/Milestones:Pearl_Street_Station,_1882" target="_blank" rel="noopener">about 85 customers with some 400 lamps</a>. Your electric bill is the modern form of those early accounts.</p>
<h2>Who discovered electricity?</h2>
<p>Thales of Miletus gets the credit for first noticing it, since <a href="https://pwg.gsfc.nasa.gov/Electric/-E14-history.htm" target="_blank" rel="noopener">NASA says he probably knew</a> that rubbed amber attracts light bits of straw and feather. The sources disagree on the cloth, silk in EIA&#8217;s timeline and dry cloth or fur in NASA&#8217;s, and neither can date it precisely.</p>
<p>Static electricity is one of several <a href="/types-of-energy/">forms of energy</a>, and it&#8217;s the kind Thales found. The word on your power bill comes from elektron, the Greek for amber. William Gilbert&#8217;s De Magnete, <a href="https://pwg.gsfc.nasa.gov/Electric/-E14-history.htm" target="_blank" rel="noopener">published in London in 1600</a>, named the pull of rubbed amber the &#8220;electrick force.&#8221;</p>
<p>In June 1752, <a href="https://fi.edu/benjamin-franklin/kite-key-experiment" target="_blank" rel="noopener">Benjamin Franklin flew a kite</a> in a Philadelphia thunderstorm to test whether lightning is electricity. The story is shakier than it sounds. The Franklin Institute notes that <a href="https://fi.edu/node/2483" target="_blank" rel="noopener">the only account came 15 years later</a>, and <a href="https://www.history.com/news/benjamin-franklin-kite-experiment-electricity" target="_blank" rel="noopener">historians aren&#8217;t sure of the date</a>, with some doubting it happened at all.</p>
<p>Franklin&#8217;s lightning rod was a separate idea, <a href="https://fi.edu/node/2483" target="_blank" rel="noopener">an iron rod 8 or 10 feet long</a> sharpened to a point to draw the &#8220;electrical fire&#8221; out of a cloud silently. If a rod stands on a roof near you, that&#8217;s his design at work.</p>
<h2>Who built the first battery and the first generator?</h2>
<p>Alessandro Volta demonstrated the voltaic pile, the first battery, in <a href="https://ethw.org/Alessandro_Volta" target="_blank" rel="noopener">1799</a>. He described it to the Royal Society in a <a href="https://spectrum.ieee.org/voltaic-pile-first-battery" target="_blank" rel="noopener">letter dated 20 March 1800</a>, which is why EIA lists it under 1800.</p>
<p>Michael Faraday then showed that magnetism can make current. He <a href="https://www.rigb.org/explore-science/explore/collection/michael-faradays-ring-coil-apparatus" target="_blank" rel="noopener">succeeded on 29 August 1831</a> with an iron ring wound with two coils, and a few months later he built <a href="https://www.rigb.org/explore-science/explore/collection/michael-faradays-generator" target="_blank" rel="noopener">the first-ever electric generator</a>.</p>
<p>IEEE&#8217;s engineering wiki says <a href="https://ethw.org/Michael_Faraday" target="_blank" rel="noopener">power generation and power transmission would be impossible</a> without his induction result, so the power reaching your outlet rests on it. Batteries and motors that grew out of Volta&#8217;s and Faraday&#8217;s work powered the <a href="/first-electric-car/">earliest electric cars</a> in the 1830s.</p>
<h2>Who invented the light bulb?</h2>
<p>Edison gets the credit, but he patented his bulb <a href="https://www.energy.gov/articles/history-light-bulb" target="_blank" rel="noopener">in 1879 and again in 1880</a>, and DOE notes that William Sawyer and Albon Man held a US patent for the incandescent lamp while Joseph Swan patented his own bulb in England.</p>
<p>His team&#8217;s carbon-thread bulb burned for <a href="https://www.nps.gov/edis/learn/historyculture/edison-biography.htm" target="_blank" rel="noopener">thirteen and a half hours by the National Park Service&#8217;s account</a> and <a href="https://www.energy.gov/articles/history-light-bulb" target="_blank" rel="noopener">14.5 hours by DOE&#8217;s</a>.</p>
<p>DOE also credits Edison with the Edison screw, the standard socket fitting, so if you&#8217;ve screwed a bulb into a lamp, you&#8217;ve used a part of his system.</p>
<h2>Why did Edison and Tesla fight over current?</h2>
<p>Pearl Street sent out direct current, which flows one way and can&#8217;t easily change voltage, and DOE says the fight with Tesla&#8217;s alternating current began in the <a href="https://www.energy.gov/articles/war-currents-ac-vs-dc-power" target="_blank" rel="noopener">late 1880s</a>. Tesla&#8217;s <a href="https://patents.google.com/patent/US381968" target="_blank" rel="noopener">US patent 381,968</a>, granted 1 May 1888, covers a motor run from an alternating-current generator.</p>
<p>The wall outlet in your house delivers alternating current that reverses direction <a href="https://www.energy.gov/articles/war-currents-ac-vs-dc-power" target="_blank" rel="noopener">60 times a second in the US</a>.</p>
<p>AC won in steps. On <a href="https://spectrum.ieee.org/the-birthplace-of-the-ac-grid" target="_blank" rel="noopener">13 July 1895</a>, California&#8217;s Folsom Powerhouse sent high-voltage AC 35 km to Sacramento, which IEEE Spectrum calls a first for long-distance transmission.</p>
<p>The Niagara Falls station made power from falling water, the way <a href="/hydropower/">hydropower</a> still does. It&#8217;s often billed as the first AC hydro plant, but the Edison Tech Center says <a href="https://www.edisontechcenter.org/Niagara.htm" target="_blank" rel="noopener">AC hydropower goes back to the 1870s</a> in Europe.</p>
<h2>When did US homes get electricity?</h2>
<p>The 1940 Census was the first to ask, and it found that <a href="https://www.census.gov/about/history/stories/monthly/2026/september-2026.html" target="_blank" rel="noopener">78.7% of occupied US housing units had electric lights</a>.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>All US homes with service (%)</th>
<th>Farms with service (%)</th>
<th>Urban and rural nonfarm homes (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>1920</td>
<td>34.7</td>
<td>1.6</td>
<td>47.4</td>
</tr>
<tr>
<td>1925</td>
<td>53.2</td>
<td>3.9</td>
<td>69.4</td>
</tr>
<tr>
<td>1930</td>
<td>68.2</td>
<td>10.4</td>
<td>84.8</td>
</tr>
<tr>
<td>1935</td>
<td>68.0</td>
<td>12.6</td>
<td>83.9</td>
</tr>
<tr>
<td>1940</td>
<td>78.7</td>
<td>32.6</td>
<td>90.8</td>
</tr>
<tr>
<td>1945</td>
<td>85.0</td>
<td>48.0</td>
<td>93.0</td>
</tr>
<tr>
<td>1950</td>
<td>94.0</td>
<td>77.7</td>
<td>96.6</td>
</tr>
<tr>
<td>1956</td>
<td>98.8</td>
<td>95.9</td>
<td>99.2</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www2.census.gov/library/publications/1975/compendia/hist_stats_colonial-1970/hist_stats_colonial-1970p2-chS.pdf" target="_blank" rel="noopener">Census Bureau, Historical Statistics of the United States, Series S</a>. Percentages are of dwelling units, and the Census volume notes that figures for years between censuses vary by source and method.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/us-homes-with-electricity-1920-1956-2026-11-19.png" alt="Share of US homes with electric service rose from 34.7% in 1920 to 98.8% in 1956, while farms climbed from 1.6% to 95.9%." width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://www2.census.gov/library/publications/1975/compendia/hist_stats_colonial-1970/hist_stats_colonial-1970p2-chS.pdf" target="_blank" rel="noopener">Census Bureau, Historical Statistics of the United States, Series S</a>.</figcaption></figure>
<p>The gap between city and farm is the story. Nine out of 10 rural homes were without service as late as the mid-1930s, and <a href="https://www.electric.coop/our-organization/history" target="_blank" rel="noopener">farmers milked by hand in the dim light of a kerosene lantern</a>. If you&#8217;d farmed then, you&#8217;d likely have worked by lantern.</p>
<p>Roosevelt created the Rural Electrification Administration on <a href="https://www.electric.coop/our-organization/history" target="_blank" rel="noopener">11 May 1935</a>, and NRECA, the electric co-op trade group, says <a href="https://www.electric.coop/our-organization/history" target="_blank" rel="noopener">more than 90% of US farms had electricity by 1953</a>. The Census Bureau says <a href="https://www.census.gov/about/history/stories/monthly/2026/september-2026.html" target="_blank" rel="noopener">EIA reports nearly every American household has access to electricity</a>.</p>
<h2>What a wired US home uses today</h2>
<p>The average US home used <a href="https://www.eia.gov/electricity/data/state/xls/861/HS861%202010-.xlsx" target="_blank" rel="noopener">10,359 kilowatt-hours of electricity in 2024</a>. <a href="/how-many-kwh-does-a-house-use/">Household electricity use</a> swings most with climate, and Louisiana homes bought the most, <a href="https://www.eia.gov/tools/faqs/faq.php?id=97&amp;t=3" target="_blank" rel="noopener">14,774 kWh each in 2022</a>. The bill for that power depends on <a href="/electricity-cost-by-state/">the price per kilowatt-hour where you live</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>What are the types of energy?</title>
		<link>https://theenergycollective.com/types-of-energy/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Wed, 18 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1122</guid>

					<description><![CDATA[Energy comes in two basic forms, potential and kinetic, and the US runs mostly on petroleum and natural gas, which together supplied 73% of its primary energy in&#8230;]]></description>
										<content:encoded><![CDATA[<p>Energy comes in two basic forms, potential and kinetic, and the US runs mostly on petroleum and natural gas, which together supplied <a href="https://www.eia.gov/totalenergy/data/browser/?tbl=T01.03" target="_blank" rel="noopener">73% of its primary energy in 2025</a>. Both fuels store chemical energy in their molecules, so every tank of gasoline and every gas flame is stored energy turning into heat and motion. The figures come mostly from EIA and Ember, plus the Energy Institute and Lawrence Livermore National Laboratory, and they describe 2025 unless a line says otherwise.</p>
<h2>Top types of energy statistics</h2>
<ul>
<li>EIA lists <a href="https://www.eia.gov/energyexplained/what-is-energy/forms-of-energy.php" target="_blank" rel="noopener">9 forms of energy</a>, all of them either potential or kinetic.</li>
<li>The US used <a href="https://www.eia.gov/totalenergy/data/browser/?tbl=T01.03" target="_blank" rel="noopener">96.5 quadrillion Btu of primary energy in 2025</a>, and petroleum and natural gas supplied 36.1 and 34.6 of those quads.</li>
<li>Coal&#8217;s share of US energy fell <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">from about 37% in 1950 to 9% in 2025</a>.</li>
<li>Of the 94.6 quads Americans used in 2024, Lawrence Livermore&#8217;s flow chart shows <a href="https://flowcharts.llnl.gov/sites/flowcharts/files/2026-08/energy-2024-united-states.pdf" target="_blank" rel="noopener">62.27 quads rejected</a> as waste heat.</li>
<li>Fossil fuels supplied <a href="https://www.energyinst.org/__data/assets/file/0004/1827616/Statistical-Review-of-World-Energy-PDF-Report.pdf" target="_blank" rel="noopener">86% of the world&#8217;s total energy supply in 2025</a>, according to the Energy Institute.</li>
<li>Renewables made <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">33.8% of world electricity in 2025</a> and edged past coal at 33.0%.</li>
<li>Solar generation reached <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">2,778 TWh worldwide in 2025</a>, up 30% on 2024.</li>
<li>Nuclear plants ran at maximum power <a href="https://www.energy.gov/ne/articles/nuclear-power-most-reliable-energy-source-and-its-not-even-close" target="_blank" rel="noopener">more than 92% of the time</a> in a 2021 DOE comparison.</li>
</ul>
<h2>What are the forms of energy?</h2>
<p>Every form of energy is either potential or kinetic, <a href="https://www.eia.gov/energyexplained/what-is-energy/forms-of-energy.php" target="_blank" rel="noopener">EIA says</a>, which means it&#8217;s either stored or moving. Potential energy is stored energy and the energy of position. Kinetic energy is the motion of waves, electrons, atoms, molecules and objects.</p>
<table>
<thead>
<tr>
<th>Form</th>
<th>Class</th>
<th>EIA&#8217;s everyday example</th>
<th>Energy source it matches</th>
</tr>
</thead>
<tbody>
<tr>
<td>Chemical</td>
<td>Potential</td>
<td>Battery, wood, gasoline</td>
<td>Petroleum, natural gas, coal, biomass</td>
</tr>
<tr>
<td>Stored mechanical</td>
<td>Potential</td>
<td>Compressed spring</td>
<td>None listed</td>
</tr>
<tr>
<td>Nuclear</td>
<td>Potential</td>
<td>Energy holding a nucleus together</td>
<td>Uranium</td>
</tr>
<tr>
<td>Gravitational</td>
<td>Potential</td>
<td>Bicycle at the top of a hill</td>
<td>Hydropower</td>
</tr>
<tr>
<td>Radiant</td>
<td>Kinetic</td>
<td>Sunshine</td>
<td>Solar</td>
</tr>
<tr>
<td>Thermal</td>
<td>Kinetic</td>
<td>Heat from burning wood</td>
<td>Geothermal</td>
</tr>
<tr>
<td>Motion</td>
<td>Kinetic</td>
<td>Wind, a moving car</td>
<td>Wind</td>
</tr>
<tr>
<td>Sound</td>
<td>Kinetic</td>
<td>A vibrating object</td>
<td>None listed</td>
</tr>
<tr>
<td>Electrical</td>
<td>Kinetic</td>
<td>Lightning</td>
<td>Electricity</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/energyexplained/what-is-energy/forms-of-energy.php" target="_blank" rel="noopener">EIA, Forms of energy</a>. The last column follows the examples on that page and on <a href="https://www.eia.gov/energyexplained/what-is-energy/sources-of-energy.php" target="_blank" rel="noopener">EIA&#8217;s sources of energy page</a>.</p>
<p>Energy changes form all the time, but it <a href="https://www.eia.gov/energyexplained/what-is-energy/laws-of-energy.php" target="_blank" rel="noopener">never disappears</a>. A car engine turns the chemical energy in gasoline into mechanical energy, and a solar cell turns radiant energy from the sun into electricity.</p>
<p>Ride a bicycle down a hill and the gravitational energy you held at the crest turns into motion. The Sun, powered by <a href="https://theenergycollective.com/nuclear-fusion/">fusion reactions in its core</a>, reaches into more than one row of the table. Without its energy, <a href="https://science.nasa.gov/sun/facts/" target="_blank" rel="noopener">life as we know it could not exist</a>, and DOE says <a href="https://www.energy.gov/eere/wind/how-do-wind-turbines-work" target="_blank" rel="noopener">wind is a form of solar energy</a>.</p>
<h2>What&#8217;s the difference between renewable and nonrenewable energy?</h2>
<p>Renewable sources are naturally replenished, while nonrenewable ones are mined or pulled from the earth, according to <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">EIA&#8217;s energy mix overview</a>. EIA&#8217;s <a href="/renewable-energy/">five major renewable energy sources</a> are the sun, heat inside the earth, wind, plants and flowing water.</p>
<p>Petroleum, hydrocarbon gas liquids, natural gas, coal and nuclear energy are the nonrenewable ones. <a href="https://www.eia.gov/energyexplained/nuclear/" target="_blank" rel="noopener">Uranium counts as nonrenewable</a> even though it&#8217;s a common metal in rocks worldwide.</p>
<p>Primary sources are fuels in their original form, and secondary sources such as electricity and hydrogen are made from them. People relied mostly on traditional biomass until the <a href="https://ourworldindata.org/energy-mix" target="_blank" rel="noopener">mid-19th century</a>, and <a href="/fossil-fuels/">coal, oil and natural gas</a> came to dominate after that.</p>
<h2>Which energy sources does the US use the most?</h2>
<p>Petroleum supplied 36.1 quadrillion Btu and natural gas 34.6 of the <a href="https://www.eia.gov/totalenergy/data/browser/?tbl=T01.03" target="_blank" rel="noopener">96.5 quads the US used in 2025</a>, which makes them a little under three-quarters of the total.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Class</th>
<th>Consumption (quads, 2025)</th>
<th>Share of total (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Petroleum</td>
<td>Fossil</td>
<td>36.115</td>
<td>37.4</td>
</tr>
<tr>
<td>Natural gas</td>
<td>Fossil</td>
<td>34.624</td>
<td>35.9</td>
</tr>
<tr>
<td>Coal</td>
<td>Fossil</td>
<td>8.671</td>
<td>9.0</td>
</tr>
<tr>
<td>Nuclear</td>
<td>Nuclear</td>
<td>8.195</td>
<td>8.5</td>
</tr>
<tr>
<td>Biomass</td>
<td>Renewable</td>
<td>4.853</td>
<td>5.0</td>
</tr>
<tr>
<td>Wind</td>
<td>Renewable</td>
<td>1.585</td>
<td>1.6</td>
</tr>
<tr>
<td>Solar</td>
<td>Renewable</td>
<td>1.438</td>
<td>1.5</td>
</tr>
<tr>
<td>Hydropower</td>
<td>Renewable</td>
<td>0.843</td>
<td>0.9</td>
</tr>
<tr>
<td>Geothermal</td>
<td>Renewable</td>
<td>0.117</td>
<td>0.1</td>
</tr>
<tr>
<td>Total</td>
<td></td>
<td>96.466</td>
<td>100</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/totalenergy/data/browser/csv.php?tbl=T01.03" target="_blank" rel="noopener">EIA, Monthly Energy Review Table 1.3</a>. Shares are computed from EIA&#8217;s figures. Since October 2023, EIA has counted wind, solar, hydropower and geothermal at the <a href="https://www.eia.gov/totalenergy/data/monthly/change" target="_blank" rel="noopener">heat content of the electricity they make</a>.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/types-of-energy-us-primary-energy-2026-11-12.png" alt="US primary energy consumption in 2025 ran from 36.1 quads for petroleum and 34.6 for natural gas down to 0.1 quads for geothermal." width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://www.eia.gov/totalenergy/data/browser/csv.php?tbl=T01.03" target="_blank" rel="noopener">EIA, Monthly Energy Review Table 1.3</a>.</figcaption></figure>
<p>If you drive, you&#8217;re in the petroleum bar. EIA says <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">petroleum is the primary fuel</a> in the transportation sector.</p>
<p>Lawrence Livermore&#8217;s chart for 2024 shows the same order, and it counts <a href="https://www.llnl.gov/article/54846/natural-gas-renewables-reach-new-highs-2024-us-energy-flow-chart" target="_blank" rel="noopener">coal at 7.9 quads</a>, the lowest in EIA&#8217;s series, which starts in 1949.</p>
<h2>How has the US energy mix changed?</h2>
<p>Coal and petroleum have traded places with natural gas and solar over the past two decades, and the table shows it year by year.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>Petroleum (quads)</th>
<th>Natural gas (quads)</th>
<th>Coal (quads)</th>
<th>Nuclear (quads)</th>
<th>Wind (quads)</th>
<th>Solar (quads)</th>
<th>Total (quads)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2005</td>
<td>40.217</td>
<td>22.565</td>
<td>22.797</td>
<td>8.161</td>
<td>0.061</td>
<td>0.052</td>
<td>98.101</td>
</tr>
<tr>
<td>2015</td>
<td>35.368</td>
<td>28.191</td>
<td>15.549</td>
<td>8.337</td>
<td>0.651</td>
<td>0.197</td>
<td>94.478</td>
</tr>
<tr>
<td>2016</td>
<td>35.712</td>
<td>28.4</td>
<td>14.226</td>
<td>8.427</td>
<td>0.774</td>
<td>0.252</td>
<td>94.084</td>
</tr>
<tr>
<td>2017</td>
<td>36.043</td>
<td>28.049</td>
<td>13.837</td>
<td>8.419</td>
<td>0.868</td>
<td>0.331</td>
<td>93.889</td>
</tr>
<tr>
<td>2018</td>
<td>36.892</td>
<td>31.163</td>
<td>13.252</td>
<td>8.438</td>
<td>0.93</td>
<td>0.388</td>
<td>97.4</td>
</tr>
<tr>
<td>2019</td>
<td>36.866</td>
<td>32.264</td>
<td>11.316</td>
<td>8.452</td>
<td>1.01</td>
<td>0.435</td>
<td>96.6</td>
</tr>
<tr>
<td>2020</td>
<td>32.331</td>
<td>31.669</td>
<td>9.181</td>
<td>8.251</td>
<td>1.153</td>
<td>0.516</td>
<td>88.877</td>
</tr>
<tr>
<td>2021</td>
<td>35.243</td>
<td>31.711</td>
<td>10.549</td>
<td>8.131</td>
<td>1.29</td>
<td>0.636</td>
<td>93.375</td>
</tr>
<tr>
<td>2022</td>
<td>35.319</td>
<td>33.379</td>
<td>9.888</td>
<td>8.061</td>
<td>1.482</td>
<td>0.784</td>
<td>94.964</td>
</tr>
<tr>
<td>2023</td>
<td>35.448</td>
<td>33.676</td>
<td>8.171</td>
<td>8.099</td>
<td>1.437</td>
<td>0.907</td>
<td>93.746</td>
</tr>
<tr>
<td>2024</td>
<td>35.59</td>
<td>34.179</td>
<td>7.912</td>
<td>8.165</td>
<td>1.542</td>
<td>1.138</td>
<td>94.582</td>
</tr>
<tr>
<td>2025</td>
<td>36.115</td>
<td>34.624</td>
<td>8.671</td>
<td>8.195</td>
<td>1.585</td>
<td>1.438</td>
<td>96.466</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/totalenergy/data/browser/csv.php?tbl=T01.03" target="_blank" rel="noopener">EIA, Monthly Energy Review Table 1.3</a>. Every year uses EIA&#8217;s current method for wind, solar and hydropower.</p>
<p>Total US use hit a record of <a href="https://www.eia.gov/energyexplained/use-of-energy/" target="_blank" rel="noopener">about 99 quads in 2007</a>, and 2025 came in below it. <a href="/coal-decline/">Coal&#8217;s decline</a> is the steepest in the table, from 22.8 quads in 2005 to 8.7 in 2025, and the 2025 uptick was its first rise since 2021.</p>
<p>Solar climbed quickly too. Ember counted US solar generation rising from <a href="https://ember-energy.org/data/yearly-electricity-data/" target="_blank" rel="noopener">39 TWh in 2015 to 389 TWh in 2025</a>, including small-scale panels.</p>
<h2>How much of the energy the US uses is wasted?</h2>
<p>About <a href="https://flowcharts.llnl.gov/sites/flowcharts/files/2026-08/energy-2024-united-states.pdf" target="_blank" rel="noopener">two-thirds of the energy the US used in 2024</a> was rejected, going by Lawrence Livermore&#8217;s flow chart. That rejected energy <a href="https://gs.llnl.gov/energy-homeland-security/energy-security/energy-flow-charts" target="_blank" rel="noopener">ends up as waste heat</a> released into the environment.</p>
<table>
<thead>
<tr>
<th>Stage</th>
<th>Energy in (quads, 2024)</th>
<th>Rejected (quads)</th>
<th>Output (quads)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Power plants</td>
<td>32.77</td>
<td>19.21</td>
<td>13.56</td>
</tr>
<tr>
<td>Residential</td>
<td>11.23</td>
<td>3.93</td>
<td>7.3</td>
</tr>
<tr>
<td>Commercial</td>
<td>9.49</td>
<td>3.32</td>
<td>6.17</td>
</tr>
<tr>
<td>Industrial</td>
<td>26.39</td>
<td>13.46</td>
<td>12.93</td>
</tr>
<tr>
<td>Transportation</td>
<td>28.29</td>
<td>22.35</td>
<td>5.94</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://flowcharts.llnl.gov/sites/flowcharts/files/2026-08/energy-2024-united-states.pdf" target="_blank" rel="noopener">Lawrence Livermore National Laboratory, 2024 US energy flow chart</a>. Output for power plants is electricity delivered, and output for the four sectors is energy services. Sector rows include the electricity they buy, and the lab estimates end-use efficiency by sector.</p>
<p>In the transportation row, the rejected column dwarfs the output column. Power plants lose energy too. A plant that burns 10,500 Btu to make one kWh of electricity is <a href="https://www.eia.gov/tools/faqs/faq.php?id=107&amp;t=3" target="_blank" rel="noopener">33% efficient</a>, and the rest is heat.</p>
<h2>What are the world&#8217;s main energy sources?</h2>
<p>Fossil fuels supplied <a href="https://www.energyinst.org/__data/assets/file/0004/1827616/Statistical-Review-of-World-Energy-PDF-Report.pdf" target="_blank" rel="noopener">86% of the world&#8217;s total energy supply in 2025</a>, which passed 600 exajoules for the first time, the Energy Institute reports.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Share in 2020 (%)</th>
<th>Share in 2025 (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Oil</td>
<td>33.6</td>
<td>33.5</td>
</tr>
<tr>
<td>Coal</td>
<td>28.3</td>
<td>27.7</td>
</tr>
<tr>
<td>Natural gas</td>
<td>25.6</td>
<td>25.1</td>
</tr>
<tr>
<td>All fossil fuels</td>
<td>87.5</td>
<td>86.3</td>
</tr>
<tr>
<td>Nuclear</td>
<td>5.8</td>
<td>5.2</td>
</tr>
<tr>
<td>Hydropower</td>
<td>2.8</td>
<td>2.7</td>
</tr>
<tr>
<td>Wind, solar, biomass and geothermal</td>
<td>3.9</td>
<td>5.9</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.energyinst.org/statistical-review" target="_blank" rel="noopener">Energy Institute, Statistical Review of World Energy 2026</a>, as tabulated by <a href="https://www.cyprus-mail.com/2026/07/18/the-energy-institute-statistical-review-2026-the-story-lies-beyond-electricity" target="_blank" rel="noopener">Cyprus Mail</a>. Shares are of total energy supply on the Energy Institute&#8217;s physical energy content basis.</p>
<p>Wind, solar, biomass and geothermal together gained <a href="https://www.cyprus-mail.com/2026/07/18/the-energy-institute-statistical-review-2026-the-story-lies-beyond-electricity" target="_blank" rel="noopener">2 percentage points in five years</a>, and nuclear slipped 0.6 points. Solar alone supplied <a href="https://dieselnet.com/news/2026/07energyreview.php" target="_blank" rel="noopener">1.7% of the world total and wind 1.6%</a> in 2025.</p>
<p>For scale, the EU&#8217;s gross available energy was <a href="https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Energy_statistics_-_an_overview" target="_blank" rel="noopener">55,790 petajoules in 2024</a>. Eurostat counts gross available energy, which isn&#8217;t the same measure as US primary energy, so the two don&#8217;t line up.</p>
<h2>How is the world&#8217;s electricity made?</h2>
<p><a href="https://ember-energy.org/data/yearly-electricity-data/" target="_blank" rel="noopener">Coal made 33.2% of world electricity in 2025</a>, with gas at 21.7% and hydropower at 13.9% in Ember&#8217;s yearly data. The mix looks nothing like the energy mix above, because electricity is only <a href="https://www.cyprus-mail.com/2026/07/18/the-energy-institute-statistical-review-2026-the-story-lies-beyond-electricity" target="_blank" rel="noopener">19.3% of world total energy supply</a>.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>World electricity (%, 2025)</th>
<th>US electricity (%, 2025)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Coal</td>
<td>33.2</td>
<td>16.3</td>
</tr>
<tr>
<td>Natural gas</td>
<td>21.7</td>
<td>40.0</td>
</tr>
<tr>
<td>Nuclear</td>
<td>8.8</td>
<td>17.4</td>
</tr>
<tr>
<td>Hydropower</td>
<td>13.9</td>
<td>5.3</td>
</tr>
<tr>
<td>Wind</td>
<td>8.5</td>
<td>10.3</td>
</tr>
<tr>
<td>Solar</td>
<td>8.8</td>
<td>8.6</td>
</tr>
<tr>
<td>Bioenergy</td>
<td>2.0</td>
<td>1.0</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://ember-energy.org/data/yearly-electricity-data/" target="_blank" rel="noopener">Ember, yearly electricity data</a>. Ember&#8217;s US shares include small-scale solar, so they differ slightly from <a href="https://www.eia.gov/energyexplained/electricity/electricity-in-the-us.php" target="_blank" rel="noopener">EIA&#8217;s utility-scale shares</a>.</p>
<p>EIA puts natural gas at about 41% of US utility-scale generation in 2025, and fossil fuels at <a href="https://www.eia.gov/energyexplained/electricity/electricity-in-the-us-generation-capacity-and-sales.php" target="_blank" rel="noopener">about 58%</a>. The power plants behind your outlet run on a different mix from the fuel in your tank, and EPA says they use <a href="https://www.epa.gov/energy/about-us-electricity-system-and-its-impact-environment" target="_blank" rel="noopener">a wide variety of energy resources</a>.</p>
<h2>How does each energy source make power?</h2>
<p><a href="/us-oil-production/">US crude oil production</a> feeds refineries that turn crude into gasoline and diesel, and a <a href="https://www.eia.gov/energyexplained/oil-and-petroleum-products/" target="_blank" rel="noopener">42-gallon barrel yields about 45 gallons of products</a>, the way popcorn grows when it pops.</p>
<p><a href="/natural-gas/">Natural gas as a fuel</a> burns in steam turbines and gas turbines, and it was the top US electricity source in 2025 at <a href="https://www.eia.gov/energyexplained/electricity/electricity-in-the-us.php" target="_blank" rel="noopener">about 41% of utility-scale generation</a>.</p>
<p>Coal is a fossil fuel, so it <a href="https://www.eia.gov/energyexplained/what-is-energy/sources-of-energy.php" target="_blank" rel="noopener">took thousands of years to form</a> from buried remains. <a href="/how-is-coal-formed/">How coal forms</a> explains the layers, and the US has moved off it fast enough that coal shows up as a small slice in the table above.</p>
<p>Nuclear plants split <a href="https://theenergycollective.com/uranium/">uranium atoms</a> to make heat, and the <a href="/how-many-nuclear-power-plants/">US nuclear fleet</a> supplied <a href="https://www.eia.gov/energyexplained/electricity/electricity-in-the-us.php" target="_blank" rel="noopener">about 18% of US electricity in 2025</a>. Worldwide, nuclear provides <a href="https://world-nuclear.org/information-library/current-and-future-generation/nuclear-power-in-the-world-today" target="_blank" rel="noopener">about 9% of electricity from about 440 reactors</a>, says the World Nuclear Association, a trade group.</p>
<p><a href="/hydropower/">Hydropower plants</a> use gravity to push water through turbines. DOE calls hydropower <a href="https://www.energy.gov/eere/water/hydropower-basics" target="_blank" rel="noopener">one of the oldest and largest renewable sources</a>, and it made <a href="https://www.eia.gov/energyexplained/hydropower/" target="_blank" rel="noopener">5.6% of US generation in 2025</a>.</p>
<p>Wind turns blades around a rotor that spins a generator, and <a href="/wind-power-growth/">wind power&#8217;s growth</a> has put it ahead of hydropower in the US column of the Ember table above.</p>
<p>DOE names photovoltaics and concentrating solar-thermal power as the <a href="https://www.energy.gov/eere/solar/how-does-solar-work" target="_blank" rel="noopener">main solar technologies</a>. <a href="/solar-growth/">Solar&#8217;s growth</a> shows in the US history table, where it climbed every year.</p>
<p><a href="/how-geothermal-energy-works-egs/">Geothermal power</a> draws on heat from the earth, and DOE defines geothermal as <a href="https://www.energy.gov/eere/geothermal/geothermal-basics" target="_blank" rel="noopener">heat energy from the earth</a>. It&#8217;s the smallest line in the US table.</p>
<p><a href="/biomass/">Biomass energy</a> comes from <a href="https://www.energy.gov/eere/bioenergy/bioenergy-basics" target="_blank" rel="noopener">recently living organic material</a>, and EIA says it was <a href="https://www.eia.gov/energyexplained/biomass/" target="_blank" rel="noopener">about 5% of US primary energy in 2025</a>.</p>
<h2>Where these numbers come from</h2>
<p>We computed the US shares by dividing each source&#8217;s 2025 quads by the table total. EIA counts wind, solar, hydropower and geothermal at the <a href="https://www.eia.gov/totalenergy/data/monthly/change" target="_blank" rel="noopener">heat content of the electricity they make</a>. Its old fossil fuel equivalence method had put noncombustible renewables at <a href="https://www.eia.gov/todayinenergy/detail.php?id=41013" target="_blank" rel="noopener">15% of power-sector energy in 2018 instead of 6%</a>.</p>
<p>The Energy Institute also dropped its substitution method, which <a href="https://ourworldindata.org/primary-energy-measurement-change" target="_blank" rel="noopener">inflated renewables by about 2.5 times</a>, so the world table is on the newer basis and older pages show different shares. Ember&#8217;s April report and its later data file differ slightly, so the tables use the file.</p>
<h2>Where solar and wind are set to overtake nuclear</h2>
<p>Ember expects both solar and wind to <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">overtake nuclear in world electricity in 2026</a>.</p>
<p>As of November 2026, EIA&#8217;s <a href="https://www.eia.gov/outlooks/steo/" target="_blank" rel="noopener">Short-Term Energy Outlook</a> expects most US generation growth through 2027 to come from utility-scale solar plants.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>How much energy does AI use?</title>
		<link>https://theenergycollective.com/how-much-energy-does-ai-use/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Thu, 12 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1098</guid>

					<description><![CDATA[One AI chatbot prompt uses about 0.24 watt-hours of electricity by Google&#8217;s 2025 measurement and 0.34 watt-hours by OpenAI&#8217;s 2025 figure, while the world&#8217;s data centers used 415&#8230;]]></description>
										<content:encoded><![CDATA[<p>One AI chatbot prompt uses about <a href="https://arxiv.org/abs/2508.15734" target="_blank" rel="noopener">0.24 watt-hours</a> of electricity by Google&#8217;s 2025 measurement and <a href="https://blog.samaltman.com/the-gentle-singularity" target="_blank" rel="noopener">0.34 watt-hours</a> by OpenAI&#8217;s 2025 figure, while the world&#8217;s data centers used <a href="https://iea.blob.core.windows.net/assets/431d7d22-039e-46d3-9832-090a8b4075fc/EnergyandAIinEastAsia.pdf" target="_blank" rel="noopener">415 terawatt-hours in 2024</a>, about 1.5% of global electricity. A single prompt barely registers on a household bill, but the IEA expects the data centers that run AI and everything else online to more than double their use, to <a href="https://www.scientificamerican.com/article/ai-will-drive-doubling-of-data-center-energy-demand-by-2030/" target="_blank" rel="noopener">about 945 terawatt-hours by 2030</a>. The figures come from company papers, government agencies and research labs.</p>
<h2>Top AI energy statistics</h2>
<ul>
<li>Google says the median Gemini Apps text prompt uses <a href="https://cloud.google.com/blog/products/infrastructure/measuring-the-environmental-impact-of-ai-inference" target="_blank" rel="noopener">0.24 watt-hours and 0.26 milliliters of water</a>, a measurement it published in August 2025.</li>
<li>Sam Altman wrote in 2025 that the average ChatGPT query uses about <a href="https://blog.samaltman.com/the-gentle-singularity" target="_blank" rel="noopener">0.34 watt-hours</a>.</li>
<li>Epoch AI estimated in February 2025 that a typical GPT-4o query uses <a href="https://epoch.ai/gradient-updates/how-much-energy-does-chatgpt-use" target="_blank" rel="noopener">roughly 0.3 watt-hours</a>, about a tenth of an older estimate.</li>
<li>Researchers estimated that training GPT-3 took <a href="https://arxiv.org/pdf/2104.10350" target="_blank" rel="noopener">1,287 megawatt-hours</a> in 2020.</li>
<li>US data centers used <a href="https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf" target="_blank" rel="noopener">176 terawatt-hours in 2023</a>, 4.4% of US electricity, according to Lawrence Berkeley National Laboratory (LBNL).</li>
<li>The IEA&#8217;s Base Case has global data-center use reaching <a href="https://iea.blob.core.windows.net/assets/431d7d22-039e-46d3-9832-090a8b4075fc/EnergyandAIinEastAsia.pdf" target="_blank" rel="noopener">around 945 terawatt-hours in 2030</a>, up from about 415 in 2024.</li>
<li>EPRI projects US data centers will use <a href="https://www.utilitydive.com/news/artificial-intelligence-doubles-data-center-demand-2030-EPRI/717467/" target="_blank" rel="noopener">4.6% to 9.1% of US electricity generation by 2030</a>.</li>
<li>Goldman Sachs Research forecasts global data-center power demand will rise <a href="https://www.goldmansachs.com/insights/articles/ai-to-drive-165-increase-in-data-center-power-demand-by-2030" target="_blank" rel="noopener">as much as 165% by 2030</a> from its 2023 level.</li>
</ul>
<h2>How much energy does one AI prompt use?</h2>
<p>Google measured <a href="https://cloud.google.com/blog/products/infrastructure/measuring-the-environmental-impact-of-ai-inference" target="_blank" rel="noopener">0.24 watt-hours for the median Gemini Apps text prompt</a> in 2025, along with 0.26 milliliters of water, about five drops, a small piece of <a href="https://theenergycollective.com/data-center-water-usage/">total data center water use</a>.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Model</th>
<th>Year</th>
<th>How it was reached</th>
<th>Energy per prompt (Wh)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Google</td>
<td>Gemini Apps, median text prompt</td>
<td>2025</td>
<td>Measured across Google&#8217;s serving fleet</td>
<td>0.24</td>
</tr>
<tr>
<td>OpenAI (Sam Altman)</td>
<td>ChatGPT, average query</td>
<td>2025</td>
<td>No method given</td>
<td>0.34</td>
</tr>
<tr>
<td>Epoch AI</td>
<td>GPT-4o, typical query</td>
<td>2025</td>
<td>Modeled from model size, tokens and H100 power</td>
<td>0.3</td>
</tr>
<tr>
<td>Jegham et al.</td>
<td>GPT-4o, short prompt</td>
<td>2025</td>
<td>Modeled from public benchmarks and hardware</td>
<td>0.423</td>
</tr>
<tr>
<td>Jegham et al.</td>
<td>GPT-4o, long prompt</td>
<td>2025</td>
<td>Same model, longer prompt</td>
<td>2.875</td>
</tr>
<tr>
<td>MIT Technology Review</td>
<td>Llama 3.1 405B, average response</td>
<td>2025</td>
<td>Measured GPU energy plus estimated overhead</td>
<td>1.86</td>
</tr>
<tr>
<td>EPRI</td>
<td>ChatGPT</td>
<td>2024</td>
<td>Analyst estimates cited by EPRI</td>
<td>2.9</td>
</tr>
<tr>
<td>Luccioni et al.</td>
<td>Text-generation models, mean</td>
<td>2023</td>
<td>Measured GPU energy over 1,000 inferences</td>
<td>0.047</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://arxiv.org/abs/2508.15734" target="_blank" rel="noopener">Google, paper on Gemini prompt impact</a>. <a href="https://blog.samaltman.com/the-gentle-singularity" target="_blank" rel="noopener">OpenAI CEO Sam Altman, The Gentle Singularity</a>. <a href="https://epoch.ai/gradient-updates/how-much-energy-does-chatgpt-use" target="_blank" rel="noopener">Epoch AI, How much energy does ChatGPT use?</a>. <a href="https://arxiv.org/abs/2505.09598" target="_blank" rel="noopener">Jegham et al.</a>. <a href="https://www.technologyreview.com/2025/05/20/1116327/ai-energy-usage-climate-footprint-big-tech/" target="_blank" rel="noopener">MIT Technology Review</a>. <a href="https://restservice.epri.com/publicdownload/000000003002028905/0/Product" target="_blank" rel="noopener">EPRI, Powering Intelligence</a>. <a href="https://arxiv.org/abs/2311.16863" target="_blank" rel="noopener">Luccioni et al., Power Hungry Processing</a>. The Llama row converts MIT&#8217;s 6,706 joules per response to watt-hours, and the Luccioni row converts 0.047 kilowatt-hours per 1,000 inferences.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/how-much-energy-does-ai-use-per-prompt-estimates-2026-11-05.png" alt="Bar chart of estimated electricity per AI text prompt: Google Gemini 0.24 Wh, Epoch AI 0.3, OpenAI 0.34, Jegham short prompt 0.42, MIT Technology Review Llama 405B 1.86, Jegham long prompt 2.88 and EPRI 2.9 Wh." width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: the sources in the table above.</figcaption></figure>
<p>The two company figures land close together, and so does Epoch&#8217;s independent model. Together they put a typical text prompt near a third of a watt-hour, though each figure rests on its own assumptions and none covers image, video or long reasoning requests.</p>
<p>Jegham and colleagues found that long prompts on the most energy-intensive models <a href="https://arxiv.org/abs/2505.09598" target="_blank" rel="noopener">exceed 29 watt-hours</a>, more than 65 times the most efficient systems they tested.</p>
<p>Image generation costs more per request than text. Luccioni and colleagues measured <a href="https://arxiv.org/pdf/2311.16863" target="_blank" rel="noopener">up to 2.9 kilowatt-hours per 1,000 inferences</a> for image models in 2023, against 0.047 for text generation.</p>
<h2>Why do the per-prompt estimates disagree?</h2>
<p>Estimates diverge on what gets counted, which average is reported, how long the prompt is and which year&#8217;s hardware ran it.</p>
<p>What gets counted changes the final number. Google&#8217;s measurement includes the <a href="https://cloud.google.com/blog/products/infrastructure/measuring-the-environmental-impact-of-ai-inference" target="_blank" rel="noopener">accelerators, the host machine, idle capacity and data center overhead</a>, so it covers the whole serving stack. MIT&#8217;s figure starts with GPU energy and then adds an estimate for cooling and other demands. Altman&#8217;s sentence doesn&#8217;t say what it counts.</p>
<p>The average matters too. Google reports a median, which sits in the middle of all prompts, while OpenAI says &#8220;average.&#8221; A few long prompts pull a mean above a median.</p>
<p>Prompt length and model size change the answer inside a single table. In the table above, the same model takes several times more energy on a long prompt than on a short one. MIT&#8217;s smaller Llama model needed <a href="https://www.technologyreview.com/2025/05/20/1116327/ai-energy-usage-climate-footprint-big-tech/" target="_blank" rel="noopener">114 joules per response</a>, against 6,706 joules for the 405-billion-parameter one.</p>
<p>Year is the last. Epoch traced the old 3 watt-hour figure to <a href="https://epoch.ai/gradient-updates/how-much-energy-does-chatgpt-use" target="_blank" rel="noopener">Alex de Vries in 2023</a>, who assumed more tokens per query and older chips. <a href="https://restservice.epri.com/publicdownload/000000003002028905/0/Product" target="_blank" rel="noopener">EPRI&#8217;s 2.9 watt-hours</a> rests on the same generation of analyst estimates. Google reports its own median prompt got <a href="https://arxiv.org/abs/2508.15734" target="_blank" rel="noopener">33 times more energy efficient in one year</a>, so an estimate built on 2023 hardware will run high against a 2025 measurement.</p>
<h2>Does an AI prompt use more electricity than a Google search?</h2>
<p>A short chatbot query uses more than a search. A May 2025 study compared a <a href="https://arxiv.org/pdf/2505.09598" target="_blank" rel="noopener">0.42 watt-hour GPT-4o query with a Google search at 0.30</a> and found the chatbot prompt about 40% higher. The search figure comes from the same paper and predates Google&#8217;s own 2025 Gemini measurement, so treat the comparison as rough.</p>
<p>Reasoning models widen the gap. In the same study, OpenAI&#8217;s o3 model used <a href="https://arxiv.org/pdf/2505.09598" target="_blank" rel="noopener">12.222 watt-hours on a long prompt</a>, against 2.875 for GPT-4o. If you switch a chatbot to a reasoning mode for everyday questions, you&#8217;re choosing the expensive end of that range.</p>
<h2>How does one prompt compare with your home&#8217;s electricity?</h2>
<p>An average US home used <a href="https://www.eia.gov/electricity/data/state/xls/861/HS861%202010-.xlsx" target="_blank" rel="noopener">10,359 kilowatt-hours of electricity in 2024</a>, the equivalent of about 43 million median Gemini prompts, so a single prompt barely registers on your bill.</p>
<p>Heavy chat use doesn&#8217;t change the picture. The same researchers put the average ChatGPT user at <a href="https://arxiv.org/pdf/2505.09598" target="_blank" rel="noopener">about eight queries a day</a> in April 2025. At OpenAI&#8217;s average per-query figure, a year of that adds up to roughly one kilowatt-hour, less than a thousandth of <a href="/how-many-kwh-does-a-house-use/">what a typical home uses in a year</a>.</p>
<p>The total is where the grid feels it, and the <a href="/americas-grid-in-the-crosshairs-ai-aging-wires-and-a-fossil-fuel-revival/">AI strain on aging wires</a> is the longer story behind the numbers that follow.</p>
<h2>How much energy does it take to train an AI model?</h2>
<p>Training is a one-time cost per model, and only a few makers have published it. The documented examples are a few years old, and none of the sources checked gives a training energy figure for the newest OpenAI or Google models.</p>
<table>
<thead>
<tr>
<th>Model</th>
<th>Year</th>
<th>GPU hours (millions)</th>
<th>Electricity (MWh)</th>
<th>How the figure was reached</th>
</tr>
</thead>
<tbody>
<tr>
<td>GPT-3</td>
<td>2020</td>
<td>n/a</td>
<td>1,287</td>
<td>Outside estimate from 10,000 V100 GPUs</td>
</tr>
<tr>
<td>BLOOM (176B)</td>
<td>2022</td>
<td>n/a</td>
<td>433.2</td>
<td>Measured for the final training run</td>
</tr>
<tr>
<td>Llama 2 70B</td>
<td>2023</td>
<td>1.72</td>
<td>688</td>
<td>GPU hours times 400 W rated power</td>
</tr>
<tr>
<td>Llama 3.1 405B</td>
<td>2024</td>
<td>30.84</td>
<td>21,590</td>
<td>GPU hours times 700 W rated power</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://arxiv.org/pdf/2104.10350" target="_blank" rel="noopener">Patterson et al. (2021)</a>. <a href="https://arxiv.org/pdf/2211.02001" target="_blank" rel="noopener">Luccioni et al. on BLOOM</a>. <a href="https://huggingface.co/meta-llama/Llama-2-70b-hf" target="_blank" rel="noopener">Meta, Llama 2 70B model card</a>. <a href="https://huggingface.co/meta-llama/Llama-3.1-405B" target="_blank" rel="noopener">Meta, Llama 3.1 405B model card</a>. The two Llama electricity figures multiply Meta&#8217;s GPU hours by its power ratings, so they are upper bounds for the GPUs alone.</p>
<p>The two Llama rows are ceilings, and the later model used far more GPU hours than the earlier one. Meta reports GPU hours and a per-GPU power rating but no megawatt-hours, and real GPUs draw less than their rating while cooling and servers add overhead. Meta does report that training the 405B model emitted <a href="https://huggingface.co/meta-llama/Llama-3.1-405B" target="_blank" rel="noopener">8,930 tonnes of CO2 equivalent</a> on a location basis.</p>
<p>Mistral AI&#8217;s lifecycle analysis, published in 2025, found that training Mistral Large 2 and running it for 18 months emitted <a href="https://mistral.ai/news/our-contribution-to-a-global-environmental-standard-for-ai" target="_blank" rel="noopener">20.4 kilotonnes of CO2 equivalent</a>. The same period used <a href="https://mistral.ai/news/our-contribution-to-a-global-environmental-standard-for-ai" target="_blank" rel="noopener">281,000 cubic meters of water</a>.</p>
<h2>How much electricity do data centers use in total?</h2>
<p>Data centers worldwide used <a href="https://www.scientificamerican.com/article/ai-will-drive-doubling-of-data-center-energy-demand-by-2030/" target="_blank" rel="noopener">415 terawatt-hours in 2024</a>, roughly 1.5% of the world&#8217;s electricity, according to the IEA&#8217;s Energy and AI report. That covers every workload, from email and storage to AI, so it&#8217;s an upper bound on what AI alone uses.</p>
<p>In the US, DOE says data centers <a href="https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers" target="_blank" rel="noopener">climbed from 58 terawatt-hours in 2014 to 176 in 2023</a>, about three times the 2014 level.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>US data center use (TWh)</th>
<th>Share of US electricity (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2014</td>
<td>58</td>
<td>n/a</td>
</tr>
<tr>
<td>2018</td>
<td>76</td>
<td>1.9</td>
</tr>
<tr>
<td>2023</td>
<td>176</td>
<td>4.4</td>
</tr>
<tr>
<td>2028, low case</td>
<td>325</td>
<td>6.7</td>
</tr>
<tr>
<td>2028, high case</td>
<td>580</td>
<td>12</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers" target="_blank" rel="noopener">DOE, report on data center electricity demand</a>. <a href="https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf" target="_blank" rel="noopener">Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report</a>. The 2028 rows are LBNL scenarios.</p>
<h2>How much of that electricity goes to AI?</h2>
<p>No source checked gives AI alone as a share of world electricity, but two give pieces. Goldman Sachs Research put AI at <a href="https://www.goldmansachs.com/insights/articles/ai-to-drive-165-increase-in-data-center-power-demand-by-2030" target="_blank" rel="noopener">14% of global data-center power capacity</a> in its February 2025 report and expects 27% by 2027. Capacity measures power at one moment, so it isn&#8217;t a share of yearly energy.</p>
<p>For the US, MIT Technology Review reports LBNL&#8217;s projection that more than half of data center electricity would go to AI by 2028, which it puts at <a href="https://www.technologyreview.com/2025/05/20/1116327/ai-energy-usage-climate-footprint-big-tech/" target="_blank" rel="noopener">165 to 326 terawatt-hours a year</a>.</p>
<h2>How do forecasts for AI and data center energy compare?</h2>
<p>The six forecasts below come from an agency, two research groups, a bank, a data provider and an academic.</p>
<table>
<thead>
<tr>
<th>Forecaster</th>
<th>Scope</th>
<th>Target year</th>
<th>Forecast</th>
</tr>
</thead>
<tbody>
<tr>
<td>IEA, Base Case</td>
<td>Global data centers</td>
<td>2030</td>
<td>About 945 TWh, about 3% of global electricity</td>
</tr>
<tr>
<td>LBNL and DOE</td>
<td>US data centers</td>
<td>2028</td>
<td>325 to 580 TWh, 6.7% to 12% of US electricity</td>
</tr>
<tr>
<td>EPRI</td>
<td>US data centers</td>
<td>2030</td>
<td>4.6% to 9.1% of US generation</td>
</tr>
<tr>
<td>Goldman Sachs Research</td>
<td>Global data centers</td>
<td>2030</td>
<td>Up to 165% above 2023</td>
</tr>
<tr>
<td>BloombergNEF</td>
<td>US data centers</td>
<td>2035</td>
<td>8.6% of US electricity, 78 GW</td>
</tr>
<tr>
<td>de Vries (Joule, 2023)</td>
<td>AI servers only, global</td>
<td>2027</td>
<td>85 to 134 TWh more per year</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://iea.blob.core.windows.net/assets/431d7d22-039e-46d3-9832-090a8b4075fc/EnergyandAIinEastAsia.pdf" target="_blank" rel="noopener">IEA (East Asia report)</a>. <a href="https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers" target="_blank" rel="noopener">DOE</a>. <a href="https://restservice.epri.com/publicdownload/000000003002028905/0/Product" target="_blank" rel="noopener">EPRI, Powering Intelligence</a>. <a href="https://www.goldmansachs.com/insights/articles/ai-to-drive-165-increase-in-data-center-power-demand-by-2030" target="_blank" rel="noopener">Goldman Sachs Research</a>. <a href="https://about.bnef.com/insights/commodities/power-for-ai-easier-said-than-built/" target="_blank" rel="noopener">BloombergNEF</a>. <a href="https://www.eurekalert.org/news-releases/1003775" target="_blank" rel="noopener">Cell Press release on de Vries&#8217;s Joule paper</a>.</p>
<p>EPRI built four growth scenarios, and they span <a href="https://www.utilitydive.com/news/artificial-intelligence-doubles-data-center-demand-2030-EPRI/717467/" target="_blank" rel="noopener">4.6% to 9.1%</a> of US generation in 2030.</p>
<p>The IEA&#8217;s 945 terawatt-hours would be <a href="https://www.scientificamerican.com/article/ai-will-drive-doubling-of-data-center-energy-demand-by-2030/" target="_blank" rel="noopener">about 2.3 times the 2024 level</a> and roughly Japan&#8217;s yearly electricity use. Every forecast in the table points up, but they disagree on how far, because each counts a different place, year and set of machines.</p>
<h2>How we compiled these numbers</h2>
<p>We took per-prompt figures from company disclosures, outside estimates and measurements of open models, and the table says which is which. A few numbers are our arithmetic on sourced inputs. They convert joules to watt-hours, multiply GPU hours by rated power and divide terawatt-hours by home use. The forecasts count different things, so we haven&#8217;t added them together or averaged them.</p>
<h2>What 176 to 580 terawatt-hours would mean for your grid</h2>
<p>At <a href="https://www.eia.gov/electricity/data/state/xls/861/HS861%202010-.xlsx" target="_blank" rel="noopener">10,359 kilowatt-hours per home a year</a>, the 176 terawatt-hours <a href="https://theenergycollective.com/data-center-statistics/">US data centers used in 2023</a> equal the electricity of about 17 million homes. LBNL&#8217;s 2028 range would be nearly double to more than triple that.</p>
<p>Supplying that much depends on new power plants, which grid operators such as PJM line up years in advance through <a href="/capacity-market/">capacity auctions</a>, and on <a href="/renewable-grid-limit/">how much wind and solar the grid can absorb</a>. What it costs households shows up in <a href="/electricity-cost-by-state/">electricity prices by state</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Does battery energy storage undercut the energy return of wind and solar?</title>
		<link>https://theenergycollective.com/battery-energy-storage/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Thu, 12 Nov 2026 12:17:55 +0000</pubDate>
				<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/battery-energy-storage/</guid>

					<description><![CDATA[Battery energy storage is scaling fast on the US grid. What a 2014 net-energy argument got wrong, what's changed, and what batteries still can't do.]]></description>
										<content:encoded><![CDATA[<p><em>Originally published August 25, 2014. Updated November 12, 2026.</em></p>
<p>No, according to a 2020 peer-reviewed study that found backing a mostly renewable California grid with batteries <a href="https://www.mdpi.com/1996-1073/13/15/3934" target="_blank" rel="noopener">raised its energy return by about 10%</a>. That cuts against a widely cited 2014 argument that storage would wreck the energy return of wind and solar. Batteries have also gone from a rounding error to <a href="https://www.eia.gov/electricity/monthly/xls/table_6_01.xlsx" target="_blank" rel="noopener">54.1 gigawatts on the US grid at the end of August 2026</a>, though most of them hold only a few hours of power, so carrying a grid through a windless week is still beyond them.</p>
<h2>Top battery energy storage statistics</h2>
<ul>
<li>The US had <a href="https://www.eia.gov/electricity/monthly/xls/table_6_01.xlsx" target="_blank" rel="noopener">54.1 GW of utility-scale battery capacity at the end of August 2026</a>, measured as net summer capacity.</li>
<li>US battery capacity grew by <a href="https://www.eia.gov/todayinenergy/detail.php?id=67925" target="_blank" rel="noopener">an average of 70% a year from 2023 to 2025</a>, reaching 43.6 GW at the end of 2025.</li>
<li>Operators plan to add <a href="https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx" target="_blank" rel="noopener">26.8 GW of batteries in 2027</a>, according to EIA&#8217;s September 2026 generator inventory.</li>
<li>The IEA counted <a href="https://www.iea.org/commentaries/battery-storage-is-scaling-up-and-taking-on-a-larger-system-role" target="_blank" rel="noopener">108 GW of battery storage added worldwide in 2025</a>, about 40% more than in 2024.</li>
<li>California&#8217;s battery fleet reached <a href="https://www.energy.ca.gov/news/2026-08/california-surpasses-21000-megawatts-battery-resources-supporting-states" target="_blank" rel="noopener">21,112 MW in August 2026</a>, which the state calls the nation&#8217;s largest.</li>
<li>Batteries supplied an average of <a href="https://www.caiso.com/documents/2025-special-report-on-battery-storage-oct-28-2026.pdf" target="_blank" rel="noopener">15% of California&#8217;s load</a> from 5 p.m. to 10 p.m. in 2025.</li>
<li>Battery packs for stationary storage cost <a href="https://about.bnef.com/insights/clean-transport/lithium-ion-battery-pack-prices-fall-to-108-per-kilowatt-hour-despite-rising-metal-prices-bloombergnef/" target="_blank" rel="noopener">$70 per kWh in 2025</a>, 45% less than in 2024.</li>
<li>NREL puts a complete four-hour utility-scale battery system at <a href="https://docs.nrel.gov/docs/fy25osti/93281.pdf" target="_blank" rel="noopener">$334 per kWh in 2024</a>, in 2024 dollars.</li>
</ul>
<h2>How much battery storage does the US grid have?</h2>
<p>The US had <a href="https://www.eia.gov/electricity/monthly/xls/table_6_01.xlsx" target="_blank" rel="noopener">54.1 GW of battery storage at August 2026</a>, and EIA&#8217;s September inventory lists <a href="https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx" target="_blank" rel="noopener">56.1 GW of operating nameplate capacity</a>. The two differ because one counts summer capacity and the other counts nameplate ratings.</p>
<table>
<thead>
<tr>
<th>Year (December)</th>
<th>US utility-scale battery capacity (GW)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2018</td>
<td>0.85</td>
</tr>
<tr>
<td>2019</td>
<td>1.02</td>
</tr>
<tr>
<td>2020</td>
<td>1.65</td>
</tr>
<tr>
<td>2021</td>
<td>4.67</td>
</tr>
<tr>
<td>2022</td>
<td>8.84</td>
</tr>
<tr>
<td>2023</td>
<td>15.36</td>
</tr>
<tr>
<td>2024</td>
<td>26.21</td>
</tr>
<tr>
<td>2025</td>
<td>42.74</td>
</tr>
</tbody>
</table>
<p>Source: EIA Preliminary Monthly Electric Generator Inventory, operating batteries by nameplate capacity, December files for <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2018.xlsx" target="_blank" rel="noopener">2018</a>, <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2019.xlsx" target="_blank" rel="noopener">2019</a>, <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2020.xlsx" target="_blank" rel="noopener">2020</a>, <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2021.xlsx" target="_blank" rel="noopener">2021</a>, <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2022.xlsx" target="_blank" rel="noopener">2022</a>, <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2023.xlsx" target="_blank" rel="noopener">2023</a>, <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2024.xlsx" target="_blank" rel="noopener">2024</a> and <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2025.xlsx" target="_blank" rel="noopener">2025</a>.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/battery-energy-storage-us-capacity-2026-11-12.png" alt="US utility-scale battery capacity climbs from 0.85 gigawatts in 2018 to 42.74 gigawatts in 2025" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://www.eia.gov/electricity/data/eia860m/" target="_blank" rel="noopener">EIA Preliminary Monthly Electric Generator Inventory</a>.</figcaption></figure>
<p>Capacity in the table grew about <a href="https://www.eia.gov/electricity/data/eia860m/archive/xls/december_generator2025.xlsx" target="_blank" rel="noopener">50-fold</a> between December 2018 and December 2025. In 2024 alone, generators <a href="https://www.eia.gov/todayinenergy/detail.php?id=64705" target="_blank" rel="noopener">added 10.4 GW of new battery capacity</a>, the second-largest addition that year after solar.</p>
<p>Operators have more on the way. These are plans operators reported to EIA, and plans slip.</p>
<table>
<thead>
<tr>
<th>Planned operation year</th>
<th>Planned US battery additions (GW)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Rest of 2026</td>
<td>9.65</td>
</tr>
<tr>
<td>2027</td>
<td>26.85</td>
</tr>
<tr>
<td>2028</td>
<td>15.24</td>
</tr>
<tr>
<td>2029</td>
<td>9.10</td>
</tr>
<tr>
<td>2030</td>
<td>2.18</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx" target="_blank" rel="noopener">EIA Preliminary Monthly Electric Generator Inventory, September 2026, Planned sheet</a>.</p>
<h2>How much battery storage does the world have?</h2>
<p>Developers added <a href="https://www.iea.org/commentaries/battery-storage-is-scaling-up-and-taking-on-a-larger-system-role" target="_blank" rel="noopener">108 GW of battery storage worldwide in 2025</a>, up around 40% from 2024, according to the IEA. Ember counted a record <a href="https://ember-energy.org/latest-updates/storage-targets-nearly-triple-since-cop29-but-still-fall-45-short-of-1500-gw-pledge" target="_blank" rel="noopener">118 GW of storage added in 2025</a> and says battery additions have grown by almost 80% a year since 2020.</p>
<p>Both figures are additions for one year, and neither is a running total. Ember&#8217;s release doesn&#8217;t say which technologies its figure covers, so the two aren&#8217;t directly comparable.</p>
<p>Ember also estimates that battery deployment <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">grew 46% to about 250 GWh in 2025</a>, which measures energy over time instead of power at a moment. National targets add up to <a href="https://ember-energy.org/latest-updates/storage-targets-nearly-triple-since-cop29-but-still-fall-45-short-of-1500-gw-pledge" target="_blank" rel="noopener">822 GW of storage by 2030 across 99 countries and the EU</a>, short of the 1,500 GW pledged at COP29.</p>
<h2>What does a battery energy storage system do on the grid?</h2>
<p>A battery energy storage system charges when power is plentiful and cheap and sends it back when demand peaks. Most large systems in operation have a <a href="https://www.caiso.com/documents/2025-special-report-on-battery-storage-oct-28-2026.pdf" target="_blank" rel="noopener">maximum duration of 4 hours</a>, according to California&#8217;s grid operator, CAISO, which says they mostly buy power at midday when solar is plentiful and sell it back in the evening, when prices are higher.</p>
<p>Think of a reservoir that fills while solar floods the grid at midday and drains after sunset.</p>
<p>That evening stretch is when you get home, cook dinner and turn on the AC. In 2025, the average output of batteries in CAISO&#8217;s market peaked at <a href="https://www.caiso.com/documents/2025-special-report-on-battery-storage-oct-28-2026.pdf" target="_blank" rel="noopener">about 9,100 MW</a> in the hour ending 7 p.m., up from 5,700 MW in 2024. California calls its fleet the nation&#8217;s largest, and EIA found CAISO&#8217;s own battery capacity <a href="https://www.eia.gov/todayinenergy/detail.php?id=67784" target="_blank" rel="noopener">rose 79% to 16 GW between April 2024 and April 2026</a>.</p>
<p>Texas runs the same playbook. ERCOT&#8217;s own summer review says storage resources <a href="https://www.ercot.com/files/docs/2026/09/07/15-Summer-2026-Operational-and-Market-Review.pdf" target="_blank" rel="noopener">helped serve record net loads</a> in 2026, the summer it set an all-time demand record of <a href="https://www.ercot.com/files/docs/2026/09/07/15-Summer-2026-Operational-and-Market-Review.pdf" target="_blank" rel="noopener">91,134 MW</a> on July 22. Grid-data firm GridStatus, a secondary source, reported a battery discharge record of <a href="https://blog.gridstatus.io/ercot-record-july-2026/" target="_blank" rel="noopener">11,980 MW</a> the same day. ERCOT&#8217;s review adds that storage resources <a href="https://www.ercot.com/files/docs/2026/09/07/15-Summer-2026-Operational-and-Market-Review.pdf" target="_blank" rel="noopener">dominate ancillary service awards</a>, especially for regulation.</p>
<p>Batteries are also stacking up beside the <a href="/americas-grid-in-the-crosshairs-ai-aging-wires-and-a-fossil-fuel-revival/">power grid</a> that aging wires and rising demand already strain,.</p>
<h2>Most grid batteries cover only a few hours</h2>
<p>The global average energy storage duration is <a href="https://www.utilitydive.com/news/long-duration-energy-storage-deployments-rose-49-in-2025-woodmac/814336/" target="_blank" rel="noopener">2.5 hours</a>, and Wood Mackenzie says it must rise to around 20 hours to keep grids reliable as wind and solar grow. EIA found that US batteries built through 2020 could run at full power for <a href="https://www.eia.gov/todayinenergy/detail.php?id=51798" target="_blank" rel="noopener">about 3.0 hours on average</a>.</p>
<p>Money for longer storage is shrinking. Funding for long-duration storage <a href="https://www.utilitydive.com/news/long-duration-energy-storage-deployments-rose-49-in-2025-woodmac/814336/" target="_blank" rel="noopener">fell 30% globally in 2025</a>, and venture capital investment in it fell 72%. The 30% leaves out about <a href="https://www.utilitydive.com/news/long-duration-energy-storage-deployments-rose-49-in-2025-woodmac/814336/" target="_blank" rel="noopener">$1.8 billion</a> that the US Department of Energy set aside for Hydrostor.</p>
<p>That&#8217;s the part of the 2014 argument that still holds up. A battery that lasts four hours gets you through the evening peak. A calm, cloudy week is a different problem.</p>
<h2>How much does battery storage cost?</h2>
<p>A complete four-hour utility-scale battery system cost <a href="https://docs.nrel.gov/docs/fy25osti/93281.pdf" target="_blank" rel="noopener">$334 per kilowatt-hour in 2024</a>, in 2024 dollars, in NREL&#8217;s baseline. The pack is one component of that. NREL&#8217;s cost model also counts <a href="https://atb.nlr.gov/electricity/2025/utility-scale_battery_storage" target="_blank" rel="noopener">the inverter and the other hardware needed for installation</a>.</p>
<table>
<thead>
<tr>
<th>Cost measure</th>
<th>Value ($ per kWh)</th>
<th>Scope</th>
<th>Year</th>
</tr>
</thead>
<tbody>
<tr>
<td>Stationary storage battery pack</td>
<td>70</td>
<td>Pack only, global survey</td>
<td>2025</td>
</tr>
<tr>
<td>Electric vehicle battery pack</td>
<td>99</td>
<td>Pack only, global survey</td>
<td>2025</td>
</tr>
<tr>
<td>Average lithium-ion pack</td>
<td>108</td>
<td>All segments, global survey</td>
<td>2025</td>
</tr>
<tr>
<td>Four-hour utility-scale system</td>
<td>334</td>
<td>Complete system, US, 2024 dollars</td>
<td>2024</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://about.bnef.com/insights/clean-transport/lithium-ion-battery-pack-prices-fall-to-108-per-kilowatt-hour-despite-rising-metal-prices-bloombergnef/" target="_blank" rel="noopener">BloombergNEF battery price survey, December 2025</a> and <a href="https://docs.nrel.gov/docs/fy25osti/93281.pdf" target="_blank" rel="noopener">NREL, Cost Projections for Utility-Scale Battery Storage: 2025 Update</a>.</p>
<p>The pack figures and the system figure measure different things, so don&#8217;t subtract one from the other. Stationary packs became the cheapest segment for the first time in 2025, ahead of the <a href="/ev-battery/">electric car battery packs</a> at <a href="https://about.bnef.com/insights/clean-transport/lithium-ion-battery-pack-prices-fall-to-108-per-kilowatt-hour-despite-rising-metal-prices-bloombergnef/" target="_blank" rel="noopener">$99</a>.</p>
<p>Ember estimates battery costs <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">fell 45% in 2025 after a 20% drop in 2024</a>. The IEA puts the fall in battery costs at <a href="https://www.iea.org/commentaries/battery-storage-is-scaling-up-and-taking-on-a-larger-system-role" target="_blank" rel="noopener">more than 90% between 2010 and 2025</a>.</p>
<h2>How a home battery differs from a grid battery</h2>
<p>A home battery is sized for one house and does a different job than the batteries utilities build beside solar and wind farms. The Tesla Powerwall 3 <a href="https://energylibrary.tesla.com/docs/Public/EnergyStorage/Powerwall/3/Datasheet/en-us/Powerwall-3-Datasheet.pdf" target="_blank" rel="noopener">stores 13.5 kilowatt-hours</a> and carries a 10-year warranty. Tesla rates its solar-to-battery-to-home efficiency at <a href="https://energylibrary.tesla.com/docs/Public/EnergyStorage/Powerwall/3/Datasheet/en-us/Powerwall-3-Datasheet.pdf" target="_blank" rel="noopener">89%</a>, using its own test method.</p>
<p>The average US home used <a href="https://www.eia.gov/tools/faqs/faq.php?id=97&amp;t=3" target="_blank" rel="noopener">10,791 kilowatt-hours in 2022</a>, roughly 30 a day, so if your household matches that average, one Powerwall covers a little under half a day. Its main job is keeping your lights and refrigerator running <a href="/power-outage-statistics/">when the grid goes down</a>, a job that used to fall to a generator and is what <a href="/home-battery-backup/">home battery backup systems</a> are bought for.</p>
<table>
<thead>
<tr>
<th></th>
<th>Home battery</th>
<th>Grid-scale battery</th>
</tr>
</thead>
<tbody>
<tr>
<td>Example</td>
<td>Powerwall 3</td>
<td>California&#8217;s fleet</td>
</tr>
<tr>
<td>Capacity</td>
<td>13.5 kWh</td>
<td>21,112 MW</td>
</tr>
<tr>
<td>Warranty</td>
<td>10 years</td>
<td>Varies by project</td>
</tr>
<tr>
<td>Main job</td>
<td>Backs up a house during an outage</td>
<td>Shifts solar and wind power to match demand</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://energylibrary.tesla.com/docs/Public/EnergyStorage/Powerwall/3/Datasheet/en-us/Powerwall-3-Datasheet.pdf" target="_blank" rel="noopener">Tesla Powerwall 3 datasheet</a> and <a href="https://www.energy.ca.gov/news/2026-08/california-surpasses-21000-megawatts-battery-resources-supporting-states" target="_blank" rel="noopener">California Energy Commission, August 2026</a>.</p>
<h2>The 2014 argument against storage</h2>
<p>In August 2014, John Morgan wrote <a href="https://bravenewclimate.com/2014/08/22/catch-22-of-energy-storage/" target="_blank" rel="noopener">&#8220;The Catch-22 of Energy Storage&#8221;</a> on the blog Brave New Climate. He asked a fair question. If wind and solar need storage to be reliable, does building that storage cost so much energy that the whole system barely breaks even?</p>
<p>His case rested on EROI, or energy return on investment, which counts how many units of energy a source delivers over its life for every unit spent building and running it. The researcher Weißbach <a href="https://www.forbes.com/sites/jamesconca/2015/02/11/eroi-a-tool-to-predict-the-best-energy-mix/" target="_blank" rel="noopener">calculates a minimum viable return of about 7</a> for the United States and the European Union.</p>
<p>In his numbers, <a href="https://bravenewclimate.com/2014/08/22/catch-22-of-energy-storage/" target="_blank" rel="noopener">wind&#8217;s return of around 16 fell to about 3.9</a> once storage buffering was added. His solar and battery figures are in the table below.</p>
<h2>Why the numbers look different now</h2>
<p>Studies that followed Morgan reach different answers, because each one draws the boundary around the system in a different place.</p>
<table>
<thead>
<tr>
<th>Study</th>
<th>Year</th>
<th>What it modeled</th>
<th>Result (energy return)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Morgan</td>
<td>2014</td>
<td>Wind with storage buffering</td>
<td>16 falls to 3.9</td>
</tr>
<tr>
<td>Morgan</td>
<td>2014</td>
<td>Solar PV with pumped hydro</td>
<td>3.5 falls to 1.6</td>
</tr>
<tr>
<td>Morgan</td>
<td>2014</td>
<td>Batteries versus pumped hydro</td>
<td>About 10 times the energy per unit stored</td>
</tr>
<tr>
<td>Raugei and colleagues</td>
<td>2020</td>
<td>California grid, 80% renewable, with batteries</td>
<td>10% higher than the 2018 grid</td>
</tr>
<tr>
<td>Müller and Chartouni</td>
<td>2022</td>
<td>Home solar in Spain with an 18 kWh battery</td>
<td>8 rises to 15 versus curtailing</td>
</tr>
<tr>
<td>Sahin</td>
<td>2024</td>
<td>Nine global transition scenarios to 2050</td>
<td>All above a cliff of about 10</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://bravenewclimate.com/2014/08/22/catch-22-of-energy-storage/" target="_blank" rel="noopener">Brave New Climate</a>, <a href="https://www.mdpi.com/1996-1073/13/15/3934" target="_blank" rel="noopener">Energies, 2020</a>, <a href="https://ideas.repec.org/a/eee/appene/v326y2022ics0306261922012156.html" target="_blank" rel="noopener">Applied Energy, 2022</a> and <a href="https://pmc.ncbi.nlm.nih.gov/articles/PMC10764355" target="_blank" rel="noopener">Nature Communications, 2024</a>.</p>
<p>The direct test of Morgan&#8217;s question came in 2020, when Raugei, Peluso, Leccisi and Fthenakis modeled <a href="https://www.mdpi.com/1996-1073/13/15/3934" target="_blank" rel="noopener">California&#8217;s 2030 grid at 80% renewable</a> with lithium-ion batteries and compared it with the state&#8217;s 2018 mix. The battery-backed grid came out with the higher energy return.</p>
<p>A 2022 study found that adding a battery to home solar <a href="https://ideas.repec.org/a/eee/appene/v326y2022ics0306261922012156.html" target="_blank" rel="noopener">raised Spain&#8217;s energy return from around 8 to 15</a> compared with wasting the extra solar power.</p>
<p>A 2024 paper in Nature Communications adds a caution. In its nine global scenarios, <a href="https://pmc.ncbi.nlm.nih.gov/articles/PMC10764355" target="_blank" rel="noopener">all stayed above the net energy cliff of around 10</a>, yet the authors found that storage integrated into generators leads to a large drop in overall energy return. The authors also point to <a href="https://pmc.ncbi.nlm.nih.gov/articles/PMC10764355" target="_blank" rel="noopener">methodological inconsistencies</a> in earlier energy-return studies.</p>
<p>Morgan&#8217;s underlying point, that storage takes real energy to build, still stands. Raugei and colleagues in 2020 and Müller and Chartouni in 2022 found that cost small enough for batteries to come out ahead.</p>
<h2>Where these numbers come from</h2>
<p>We built the history table by summing every battery listed as operating in EIA&#8217;s December generator inventory for each year, using nameplate capacity. Each file is a snapshot from its own time, so the December 2025 file shows 42.7 GW while EIA reports <a href="https://www.eia.gov/todayinenergy/detail.php?id=67925" target="_blank" rel="noopener">43.6 GW at the end of 2025</a> in a later article. The IEA and Ember numbers describe additions in a single year, and the planned-additions table shows operators&#8217; plans.</p>
<h2>Why a calm week still needs another kind of power plant</h2>
<p>Packs cost a fraction of what they did when Morgan wrote, and the 2020 California model found a battery-backed grid with a higher energy return. Duration is what batteries haven&#8217;t solved. A battery covers the evening, and a calm week stays with other power plants.</p>
<p>Solar and wind plants have <a href="/capacity-factor/">their own capacity factors</a>, the share of their rated output they deliver over a year. Where a grid has more solar than it can use at midday, the <a href="/renewable-grid-limit/">duck curve</a> is the limit, and batteries are one way to soak up the surplus.</p>
<p>The next step is already on EIA&#8217;s list. The Bellefield solar and storage site in California began operating in December 2025, and <a href="https://www.eia.gov/todayinenergy/detail.php?id=67925" target="_blank" rel="noopener">EIA says</a> a planned doubling of its 500 MW of storage would make it the largest power storage facility in the US.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>How much water do data centers use?</title>
		<link>https://theenergycollective.com/data-center-water-usage/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Tue, 10 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1094</guid>

					<description><![CDATA[US data centers consumed 66 billion liters of water on site in 2023, mostly to cool servers, and the power plants behind their electricity consumed nearly 800 billion&#8230;]]></description>
										<content:encoded><![CDATA[<p>US data centers consumed <a href="https://escholarship.org/uc/item/1vx545q7" target="_blank" rel="noopener">66 billion liters of water on site in 2023</a>, mostly to cool servers, and the power plants behind their electricity consumed <a href="https://www.civilbeat.org/2025/08/data-centers-consume-massive-amounts-of-water-companies-rarely-say-exactly-how-much/" target="_blank" rel="noopener">nearly 800 billion liters more</a>, Lawrence Berkeley National Laboratory (LBNL) estimates. Nobody publishes how much of that is AI. The public AI numbers are per-prompt estimates, and they run from <a href="https://arxiv.org/html/2508.15734v1" target="_blank" rel="noopener">0.26 milliliters</a> to <a href="https://mistral.ai/news/our-contribution-to-a-global-environmental-standard-for-ai" target="_blank" rel="noopener">45 milliliters</a> depending on what gets counted. The figures come mostly from LBNL and company environmental reports and describe 2023 to 2025 unless a line says otherwise.</p>
<h2>Top data center water usage statistics</h2>
<ul>
<li>LBNL estimates US data centers consumed <a href="https://escholarship.org/uc/item/32d6m0d1" target="_blank" rel="noopener">66 billion liters directly in 2023, up from 21.2 billion in 2014</a>.</li>
<li>The electricity those data centers used in 2023 took <a href="https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf" target="_blank" rel="noopener">nearly 800 billion liters at power plants</a>, according to the same lab.</li>
<li>Google&#8217;s data centers and offices consumed <a href="https://sustainability.google/files/google-2026-environmental-report.pdf" target="_blank" rel="noopener">10.9 billion gallons of water in 2025</a>, up 34% on 2024.</li>
<li>Amazon reports a global water use effectiveness of <a href="https://sustainability.aboutamazon.com/2025-amazon-sustainability-report.pdf" target="_blank" rel="noopener">0.12 liters per kWh in 2025</a>, down from 0.25 in 2021.</li>
<li>Google says its median Gemini text prompt used <a href="https://arxiv.org/html/2508.15734v1" target="_blank" rel="noopener">0.26 milliliters of water in May 2025</a>, counting cooling water only.</li>
<li>A UC Riverside study found GPT-3 uses a <a href="https://arxiv.org/abs/2304.03271" target="_blank" rel="noopener">500 milliliter bottle of water per 10 to 50 responses</a>, including power plant water.</li>
<li>Mistral&#8217;s life-cycle analysis put a 400-token Le Chat response at <a href="https://mistral.ai/news/our-contribution-to-a-global-environmental-standard-for-ai" target="_blank" rel="noopener">45 milliliters of water</a>.</li>
<li>A peer-reviewed study in Nature Sustainability projects US AI servers will have a <a href="https://www.nature.com/articles/s41893-025-01681-y" target="_blank" rel="noopener">water footprint of 731 to 1,125 million cubic meters a year</a> between 2024 and 2030.</li>
</ul>
<h2>How do data centers use water?</h2>
<p>Water gets counted in two different ways. Withdrawal is what a site pulls from a river, an aquifer or a city main. Consumption is the part that doesn&#8217;t go back, and Google <a href="https://www.gstatic.com/gumdrop/sustainability/google-2025-environmental-report.pdf" target="_blank" rel="noopener">calculates it as withdrawal minus discharge</a>.</p>
<p>Direct water is what the building uses, mostly in cooling systems that let water evaporate to carry heat out. Indirect water is what power plants consume to make the electricity the building runs on. Every figure below says which one it counts.</p>
<h2>How much water do US data centers use?</h2>
<p>LBNL&#8217;s 2024 report puts direct use at 66 billion liters in 2023, with <a href="https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf" target="_blank" rel="noopener">hyperscale and colocation sites making up 84% of it</a> and companies&#8217; own server rooms down to 12%.</p>
<table>
<thead>
<tr>
<th>Measure</th>
<th>Year</th>
<th>Water consumed (billion liters)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Direct, on site</td>
<td>2014</td>
<td>21.2</td>
</tr>
<tr>
<td>Direct, on site</td>
<td>2023</td>
<td>66</td>
</tr>
<tr>
<td>Indirect, power plants</td>
<td>2023</td>
<td>about 800</td>
</tr>
<tr>
<td>Direct, hyperscale only (projection)</td>
<td>2028</td>
<td>60 to 124</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://escholarship.org/uc/item/32d6m0d1" target="_blank" rel="noopener">Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report</a>. The indirect figure uses the regional grid mix around each data center.</p>
<p>The electricity side is the bigger one. A kilowatt-hour for a data center carried <a href="https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf" target="_blank" rel="noopener">4.52 liters of indirect water in 2023</a>, against 4.35 for the average US kilowatt-hour, so the water in your own electricity is close behind. Where that power comes from sets the number, and <a href="/americas-grid-in-the-crosshairs-ai-aging-wires-and-a-fossil-fuel-revival/">AI demand on the grid</a> is pushing the electricity total up.</p>
<p>For scale, <a href="https://www.civilbeat.org/2025/08/data-centers-consume-massive-amounts-of-water-companies-rarely-say-exactly-how-much/" target="_blank" rel="noopener">17 billion gallons</a> of direct use a year, as reported from the same LBNL study, is about 47 million gallons daily. USGS counted <a href="https://pubs.usgs.gov/fs/2018/3035/fs20183035.pdf" target="_blank" rel="noopener">322 billion gallons a day withdrawn for all US uses in 2015</a>. USGS counts withdrawals and LBNL counts consumption, so the two don&#8217;t line up. Hydraulic fracturing is another heavy industrial draw, covered in <a href="/fracking-water-use/">water used in fracking</a>.</p>
<h2>How much water does one data center use?</h2>
<p>A data center with 15 megawatts of IT capacity and cooling towers consumed <a href="https://datacenters.lbl.gov/sites/default/files/DataCenterEnergyReport2016_0.pdf" target="_blank" rel="noopener">80 to 130 million gallons a year</a> in LBNL&#8217;s 2016 estimate, which used a flat cooling assumption. Real sites vary far more, and operators report withdrawal at individual sites in megaliters, where one megaliter is a million liters.</p>
<table>
<thead>
<tr>
<th>Site</th>
<th>Operator</th>
<th>Period</th>
<th>Water withdrawn (megaliters)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Clonee, Ireland</td>
<td>Meta</td>
<td>2024</td>
<td>571</td>
</tr>
<tr>
<td>Forest City, North Carolina</td>
<td>Meta</td>
<td>2024</td>
<td>16</td>
</tr>
<tr>
<td>Boydton, Virginia</td>
<td>Microsoft</td>
<td>Fiscal 2025</td>
<td>362</td>
</tr>
<tr>
<td>Singapore</td>
<td>Microsoft</td>
<td>Fiscal 2025</td>
<td>423</td>
</tr>
<tr>
<td>Dublin, Ireland</td>
<td>Microsoft</td>
<td>Fiscal 2025</td>
<td>18</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf" target="_blank" rel="noopener">Meta, 2025 Environmental Data Index</a> and <a href="https://cdn-dynmedia-1.microsoft.com/is/content/microsoftcorp/microsoft/msc/documents/presentations/CSR/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf" target="_blank" rel="noopener">Microsoft, 2026 Environmental Data Fact Sheet</a>. Microsoft&#8217;s fiscal year ends June 30. Both companies report withdrawal at sites and leave consumption out.</p>
<p>At the top end, the nonprofit EESI says the largest data centers <a href="https://www.eesi.org/articles/view/data-centers-and-water-consumption" target="_blank" rel="noopener">can consume up to 5 million gallons a day</a>, the water use of a town of 10,000 to 50,000 people.</p>
<p>In The Dalles, Oregon, Google&#8217;s data centers consumed <a href="https://escholarship.org/uc/item/1vx545q7" target="_blank" rel="noopener">355 million gallons in 2021, 29% of the city&#8217;s total water consumption</a>. If a campus is proposed in your town, ask what share of the local supply it would take.</p>
<h2>What do Microsoft, Meta and Amazon report?</h2>
<p>Each company reports a different slice of its water. Microsoft gave <a href="https://cdn-dynmedia-1.microsoft.com/is/content/microsoftcorp/microsoft/msc/documents/presentations/CSR/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf" target="_blank" rel="noopener">8,170 megaliters of consumption for fiscal 2025</a> across all its operations, and Meta gave withdrawal only.</p>
<table>
<thead>
<tr>
<th>Company</th>
<th>Measure</th>
<th>Period</th>
<th>Water (megaliters)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Microsoft</td>
<td>Consumption, all operations</td>
<td>Fiscal 2025</td>
<td>8,170</td>
</tr>
<tr>
<td>Microsoft</td>
<td>Withdrawal, all operations</td>
<td>Fiscal 2025</td>
<td>13,266</td>
</tr>
<tr>
<td>Meta</td>
<td>Withdrawal, own data centers</td>
<td>2024</td>
<td>4,145</td>
</tr>
<tr>
<td>Meta</td>
<td>Withdrawal, leased data centers</td>
<td>2024</td>
<td>883</td>
</tr>
<tr>
<td>Meta</td>
<td>Withdrawal, whole company</td>
<td>2024</td>
<td>5,637</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://cdn-dynmedia-1.microsoft.com/is/content/microsoftcorp/microsoft/msc/documents/presentations/CSR/2026-Microsoft-Environmental-Data-Fact-Sheet-PDF.pdf" target="_blank" rel="noopener">Microsoft, 2026 Environmental Data Fact Sheet</a>, Table 8, and <a href="https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf" target="_blank" rel="noopener">Meta, 2025 Environmental Data Index</a>. Meta&#8217;s data center row excludes 1,019 megaliters withdrawn to build data centers, and Microsoft estimates datacenter water from efficiency metrics starting in fiscal 2024.</p>
<p>Amazon&#8217;s report gives an efficiency ratio and no total, which is why it has no row here.</p>
<h2>How much water does Google use?</h2>
<p>The 2026 report gives consumption in gallons for each year since 2021, and the table shows it rose every year. Roughly three-quarters of the water Google withdraws is consumed, going by the two columns.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>Withdrawal (million gallons)</th>
<th>Consumption (million gallons)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2021</td>
<td>6,297</td>
<td>4,562</td>
</tr>
<tr>
<td>2022</td>
<td>7,600</td>
<td>5,565</td>
</tr>
<tr>
<td>2023</td>
<td>8,653</td>
<td>6,352</td>
</tr>
<tr>
<td>2024</td>
<td>11,011</td>
<td>8,135</td>
</tr>
<tr>
<td>2025</td>
<td>14,689</td>
<td>10,869</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://sustainability.google/files/google-2026-environmental-report.pdf" target="_blank" rel="noopener">Google, 2026 Environmental Report, data tables</a>. Covers Google-owned and operated data centers and offices, and excludes third-party data centers.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/data-center-water-google-2026-11-05.png" alt="Google water consumption rose from 4,562 million gallons in 2021 to 10,869 million gallons in 2025, with withdrawal rising from 6,297 to 14,689" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://sustainability.google/files/google-2026-environmental-report.pdf" target="_blank" rel="noopener">Google 2026 Environmental Report</a>.</figcaption></figure>
<p>In its 2025 report, Google likened 2024 consumption to the water <a href="https://www.gstatic.com/gumdrop/sustainability/google-2025-environmental-report.pdf" target="_blank" rel="noopener">54 golf courses in the US Southwest use in a year</a>.</p>
<h2>How much water does one AI prompt use?</h2>
<p>Google says the median Gemini Apps text prompt used <a href="https://arxiv.org/html/2508.15734v1" target="_blank" rel="noopener">0.26 milliliters of water</a> in May 2025, about five drops, published alongside its <a href="https://theenergycollective.com/how-much-energy-does-ai-use/">energy use per prompt</a>. It&#8217;s the smallest figure in the table, and the others sit well above it.</p>
<table>
<thead>
<tr>
<th>Estimate</th>
<th>Water per prompt</th>
<th>What it counts</th>
</tr>
</thead>
<tbody>
<tr>
<td>Google, median Gemini text prompt, May 2025</td>
<td>0.26 mL</td>
<td>Data center cooling water</td>
</tr>
<tr>
<td>OpenAI&#8217;s Sam Altman, average ChatGPT query</td>
<td>0.000085 gallons</td>
<td>No method given</td>
</tr>
<tr>
<td>Mistral, 400-token Le Chat response</td>
<td>45 mL</td>
<td>Life cycle, including upstream</td>
</tr>
<tr>
<td>UC Riverside, GPT-3 response, US average</td>
<td>2.2 mL</td>
<td>On-site cooling water</td>
</tr>
<tr>
<td>UC Riverside, GPT-3 response, US average</td>
<td>16.9 mL</td>
<td>Cooling plus power plant water</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://arxiv.org/abs/2508.15734" target="_blank" rel="noopener">Google</a>, <a href="https://blog.samaltman.com/the-gentle-singularity" target="_blank" rel="noopener">Sam Altman&#8217;s blog</a>, <a href="https://mistral.ai/news/our-contribution-to-a-global-environmental-standard-for-ai" target="_blank" rel="noopener">Mistral AI</a> and <a href="https://arxiv.org/abs/2304.03271" target="_blank" rel="noopener">Li et al., Making AI Less Thirsty</a>.</p>
<p>Mistral&#8217;s figure is more than two orders of magnitude above Google&#8217;s, dividing one by the other. Google&#8217;s figure is the cooling water for the energy a prompt uses, <a href="https://arxiv.org/abs/2508.15734" target="_blank" rel="noopener">at its fleetwide water use effectiveness</a>. Mistral ran a life-cycle analysis, so it counts more than the data center.</p>
<p>The UC Riverside figure adds power plant water, so it moves with location. The same GPT-3 response needed <a href="https://arxiv.org/abs/2304.03271" target="_blank" rel="noopener">7.6 milliliters in Texas and 29.9 in Arizona</a>. Altman gave no method for his figure, so it counts as a statement from a chief executive and not a measurement. If you use an assistant every day, which number applies depends on where its maker draws the boundary.</p>
<h2>What share of data center water is AI?</h2>
<p>No operator or agency publishes AI&#8217;s share of data center water. The one US estimate that isolates AI servers is a projection of <a href="https://www.nature.com/articles/s41893-025-01681-y" target="_blank" rel="noopener">731 to 1,125 million cubic meters a year</a> between 2024 and 2030, counting cooling and electricity, depending on how fast servers go in.</p>
<p>A million cubic meters is a billion liters. LBNL&#8217;s 2023 total for all data centers, <a href="https://escholarship.org/uc/item/1vx545q7" target="_blank" rel="noopener">66 billion liters direct</a> plus <a href="https://www.civilbeat.org/2025/08/data-centers-consume-massive-amounts-of-water-companies-rarely-say-exactly-how-much/" target="_blank" rel="noopener">about 800 billion indirect</a>, is about 866 billion. The two studies use different methods, so treat it as a rough sense of scale.</p>
<h2>How does cooling change the numbers?</h2>
<p>Cooling towers <a href="https://datacenters.lbl.gov/sites/default/files/DataCenterEnergyReport2016_0.pdf" target="_blank" rel="noopener">use water evaporation to reject heat</a>, so the water leaves as vapor and doesn&#8217;t return to the river or the pipe. Other designs avoid that, at a cost somewhere else.</p>
<p>Microsoft says about 90% of its 2025 owned fleet <a href="https://blogs.microsoft.com/blog/2026/06/24/inside-microsofts-two-decade-push-to-cut-water-intensity-while-scaling-for-growth/" target="_blank" rel="noopener">uses low-water or zero-water cooling</a>, and an AI design it introduced in 2024 consumes none for cooling in operation. Its direct air design, adopted in 2008, <a href="https://blogs.microsoft.com/blog/2026/06/24/inside-microsofts-two-decade-push-to-cut-water-intensity-while-scaling-for-growth/" target="_blank" rel="noopener">uses up to 90% less water</a> than traditional water-based cooling by using water only when outside temperatures pass 85°F.</p>
<p>Google makes the other side of the trade. It says <a href="https://www.gstatic.com/gumdrop/sustainability/google-2025-environmental-report.pdf" target="_blank" rel="noopener">water is the most efficient means of cooling in many places</a>, and air cooling means more electricity. Zero-water cooling removes the direct water and leaves the power plant water in place.</p>
<p>Amazon expects its in-row heat exchanger for AI racks to deliver a <a href="https://sustainability.aboutamazon.com/2025-amazon-sustainability-report.pdf" target="_blank" rel="noopener">9% reduction in water use</a> against evaporative air-cooled data centers once fully operational.</p>
<h2>Why company water use effectiveness numbers don&#8217;t line up</h2>
<p>Water use effectiveness, or WUE, is liters of water per kilowatt-hour of IT load. Each company defines the water differently.</p>
<table>
<thead>
<tr>
<th>Company</th>
<th>Water counted</th>
<th>Period</th>
<th>WUE (liters per kWh)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Google</td>
<td>Consumption, on site</td>
<td>2024</td>
<td>1.15</td>
</tr>
<tr>
<td>Microsoft</td>
<td>Basis not stated</td>
<td>2025</td>
<td>0.27</td>
</tr>
<tr>
<td>Meta</td>
<td>Basis not stated</td>
<td>2024</td>
<td>0.19</td>
</tr>
<tr>
<td>Amazon</td>
<td>Withdrawal</td>
<td>2025</td>
<td>0.12</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://arxiv.org/abs/2508.15734" target="_blank" rel="noopener">Google</a>, <a href="https://blogs.microsoft.com/blog/2026/06/24/inside-microsofts-two-decade-push-to-cut-water-intensity-while-scaling-for-growth/" target="_blank" rel="noopener">Microsoft</a>, <a href="https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf" target="_blank" rel="noopener">Meta</a> and <a href="https://sustainability.aboutamazon.com/2025-amazon-sustainability-report.pdf" target="_blank" rel="noopener">Amazon</a>.</p>
<p>Google&#8217;s figure counts water that evaporates and Amazon&#8217;s counts water drawn in, so the ranking isn&#8217;t a ranking.</p>
<h2>Where these numbers come from</h2>
<p>Each source keeps its own units, and we didn&#8217;t convert between liters, gallons and megaliters. We calculated three figures. They are the daily gallons from LBNL&#8217;s yearly direct total, the gap between Mistral&#8217;s and Google&#8217;s per-prompt estimates, and the combined LBNL total of direct and indirect water.</p>
<h2>The cooling and power questions for a campus in your town</h2>
<p>LBNL expects hyperscale data centers to consume <a href="https://escholarship.org/uc/item/32d6m0d1" target="_blank" rel="noopener">60 to 124 billion liters directly in 2028</a>, against 66 billion for all data centers in 2023. How a new campus cools and where its power comes from decide where it lands in that range.</p>
<p>Ask the developer for the cooling design and the site-level withdrawal. Meta and Microsoft already publish the second for many of their sites, so a request for it has a precedent.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>How many data centers are in the US? (2026)</title>
		<link>https://theenergycollective.com/data-center-statistics/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 09 Nov 2026 13:00:00 +0000</pubDate>
				<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=1092</guid>

					<description><![CDATA[The US has about 1,400 to 2,300 operating data centers, by the count of the two trackers that publish a national total: Cleanview lists 1,418 operating data center&#8230;]]></description>
										<content:encoded><![CDATA[<p>The US has about 1,400 to 2,300 operating data centers, by the count of the two trackers that publish a national total: Cleanview lists <a href="https://cleanview.co/data-centers" target="_blank" rel="noopener">1,418 operating data center buildings</a>, and Kadoa, which counts physical sites, lists <a href="https://www.kadoa.com/datacenter/report" target="_blank" rel="noopener">2,297</a>. US data centers used <a href="https://www.energy.gov/node/4847688" target="_blank" rel="noopener">176 terawatt-hours (TWh) in 2023</a>, about 4.4% of US electricity. Berkeley Lab&#8217;s scenarios put the share at <a href="https://energyanalysis.lbl.gov/news/berkeley-lab-report-evaluates-increase-electricity-demand-data-centers" target="_blank" rel="noopener">6.7% to 12% by 2028</a>. The figures come mostly from Lawrence Berkeley National Laboratory and EIA, with state detail from EPRI and the Census Bureau, and describe 2023 to 2026 unless a line says otherwise.</p>
<h2>Top data center statistics</h2>
<ul>
<li>Cleanview counted <a href="https://cleanview.co/data-centers" target="_blank" rel="noopener">1,418 operating data center buildings and 564 under construction</a> in the US on November 4, 2026.</li>
<li>Data centers used <a href="https://energyanalysis.lbl.gov/news/berkeley-lab-report-evaluates-increase-electricity-demand-data-centers" target="_blank" rel="noopener">176 TWh in 2023, up from 58 TWh in 2014</a>, according to Lawrence Berkeley National Laboratory.</li>
<li>EIA found that commercial electricity sales in Virginia <a href="https://www.eia.gov/todayinenergy/detail.php?id=67664" target="_blank" rel="noopener">rose by nearly 30 million MWh between 2019 and 2025</a>, faster than in any state except Texas.</li>
<li>Virginia has <a href="https://www.pewresearch.org/chart/top-states-data-centers/" target="_blank" rel="noopener">685 data centers listed, 398 of them operating</a>, the most of any state in Data Center Map&#8217;s February 2026 listings.</li>
<li>NERC expects peak load in the Pacific Northwest to <a href="https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_LTRA_2025.pdf" target="_blank" rel="noopener">rise by 6.6 GW, or 19%, over 10 years</a>, driven by data centers.</li>
<li>ERCOT is tracking <a href="https://www.ercot.com/files/docs/2026/04/13/9-Interconnection-and-Grid-Analysis-Update.pdf" target="_blank" rel="noopener">about 410 GW of large loads seeking interconnection</a> in Texas, roughly 87% of them data centers, as of March 26, 2026.</li>
<li>EIA forecasts that US commercial electricity demand, which includes data centers, will <a href="https://www.eia.gov/outlooks/steo/report/elec_coal_renew.php" target="_blank" rel="noopener">grow 2.8% in 2027</a>.</li>
<li>Pew Research Center found that <a href="https://www.pewresearch.org/short-reads/2026/04/13/most-new-data-centers-in-the-us-are-coming-to-rural-areas/" target="_blank" rel="noopener">67% of planned data centers are in rural areas</a>, while 87% of existing ones are urban.</li>
<li>The Census Bureau counted <a href="https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23us.zip" target="_blank" rel="noopener">18,544 establishments</a> in the data processing and hosting industry in 2023, a wider category than data centers.</li>
</ul>
<h2>How many data centers are in the US?</h2>
<p>Kadoa says published estimates <a href="https://www.kadoa.com/datacenter/report" target="_blank" rel="noopener">range from roughly 1,400 to over 4,000</a> US data centers, depending on whether colocation suites and enterprise server rooms count as separate facilities.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>What it counts</th>
<th>Count</th>
<th>As of</th>
</tr>
</thead>
<tbody>
<tr>
<td>Cleanview</td>
<td>Operating data center buildings</td>
<td>1,418</td>
<td>Nov 4, 2026</td>
</tr>
<tr>
<td>Cleanview</td>
<td>Buildings in every stage, including planned and under construction</td>
<td>4,537</td>
<td>Nov 4, 2026</td>
</tr>
<tr>
<td>Kadoa</td>
<td>Physical sites, without IT rooms inside office buildings</td>
<td>2,297</td>
<td>2026</td>
</tr>
<tr>
<td>Berkeley Lab</td>
<td>Data centers in its mapping dataset</td>
<td>3,000+</td>
<td>2024</td>
</tr>
<tr>
<td>Census Bureau</td>
<td>Establishments with paid employees in the data processing, hosting and related services industry</td>
<td>18,544</td>
<td>2023</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://cleanview.co/data-centers" target="_blank" rel="noopener">Cleanview, Data centers in the United States</a>, <a href="https://www.kadoa.com/datacenter/report" target="_blank" rel="noopener">Kadoa, US Datacenter Tracker</a>, <a href="https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf" target="_blank" rel="noopener">Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report</a> and <a href="https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23us.zip" target="_blank" rel="noopener">Census Bureau, County Business Patterns 2023</a>.</p>
<p>The Census figure comes from a federal survey, and it answers a different question. County Business Patterns counts <a href="https://www.census.gov/programs-surveys/cbp.html" target="_blank" rel="noopener">establishments with paid employees</a> in an industry, so it measures a line of business and not a building type. The same industry had <a href="https://www2.census.gov/programs-surveys/cbp/datasets/2022/cbp22st.zip" target="_blank" rel="noopener">17,539 establishments in 2022</a>.</p>
<p>If you work in it, the industry employed <a href="https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23us.zip" target="_blank" rel="noopener">629,527 people in 2023</a>, which is a count of jobs and not of buildings.</p>
<p>Operating counts are the closest to like for like, because the all-stage counts include projects that aren&#8217;t built yet.</p>
<h2>Which states have the most data centers?</h2>
<p>Virginia leads with <a href="https://www.pewresearch.org/chart/top-states-data-centers/" target="_blank" rel="noopener">685 data centers listed, 398 of them operating</a>, in Data Center Map listings from February 19, 2026 that Pew Research Center analyzed.</p>
<table>
<thead>
<tr>
<th>State</th>
<th>Data Center Map total</th>
<th>Data Center Map operating</th>
<th>Data Center Map planned</th>
<th>Cleanview operating (Nov 4, 2026)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Virginia</td>
<td>685</td>
<td>398</td>
<td>287</td>
<td>359</td>
</tr>
<tr>
<td>Texas</td>
<td>466</td>
<td>296</td>
<td>170</td>
<td>169</td>
</tr>
<tr>
<td>California</td>
<td>331</td>
<td>277</td>
<td>54</td>
<td>72</td>
</tr>
<tr>
<td>Illinois</td>
<td>262</td>
<td>139</td>
<td>123</td>
<td>48</td>
</tr>
<tr>
<td>Georgia</td>
<td>235</td>
<td>94</td>
<td>141</td>
<td>48</td>
</tr>
<tr>
<td>Ohio</td>
<td>223</td>
<td>166</td>
<td>57</td>
<td>81</td>
</tr>
<tr>
<td>Arizona</td>
<td>184</td>
<td>98</td>
<td>86</td>
<td>80</td>
</tr>
<tr>
<td>New York</td>
<td>154</td>
<td>148</td>
<td>6</td>
<td>16</td>
</tr>
<tr>
<td>Oregon</td>
<td>142</td>
<td>115</td>
<td>27</td>
<td>100</td>
</tr>
<tr>
<td>Washington</td>
<td>135</td>
<td>124</td>
<td>11</td>
<td>42</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.pewresearch.org/chart/top-states-data-centers/" target="_blank" rel="noopener">Pew Research Center, top states for data centers</a>, using Data Center Map data accessed February 19, 2026. Cleanview state pages for <a href="https://cleanview.co/data-centers/virginia" target="_blank" rel="noopener">Virginia</a>, <a href="https://cleanview.co/data-centers/texas" target="_blank" rel="noopener">Texas</a>, <a href="https://cleanview.co/data-centers/california" target="_blank" rel="noopener">California</a>, <a href="https://cleanview.co/data-centers/illinois" target="_blank" rel="noopener">Illinois</a>, <a href="https://cleanview.co/data-centers/georgia" target="_blank" rel="noopener">Georgia</a>, <a href="https://cleanview.co/data-centers/ohio" target="_blank" rel="noopener">Ohio</a>, <a href="https://cleanview.co/data-centers/arizona" target="_blank" rel="noopener">Arizona</a>, <a href="https://cleanview.co/data-centers/new-york" target="_blank" rel="noopener">New York</a>, <a href="https://cleanview.co/data-centers/oregon" target="_blank" rel="noopener">Oregon</a> and <a href="https://cleanview.co/data-centers/washington" target="_blank" rel="noopener">Washington</a>.</p>
<p>The two trackers diverge widely in California. We couldn&#8217;t find either one explaining the gap, so the table keeps them in separate columns and the counts shouldn&#8217;t be added together.</p>
<p>Virginia is the one state where independent sources line up. The state&#8217;s legislative auditors found <a href="https://jlarc.virginia.gov/pdfs/reports/Rpt598.pdf" target="_blank" rel="noopener">about 340 data center buildings on about 150 sites</a> in December 2024, and Cleanview lists <a href="https://cleanview.co/data-centers/virginia" target="_blank" rel="noopener">359 operating buildings</a> as of November 4, 2026.</p>
<p>Georgia is the other state to look at. Data Center Map lists more planned data centers there than operating ones, <a href="https://www.pewresearch.org/short-reads/2026/04/13/most-new-data-centers-in-the-us-are-coming-to-rural-areas/" target="_blank" rel="noopener">141 against 94</a>.</p>
<p>The Census industry count follows a different pattern. It puts California at <a href="https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23st.zip" target="_blank" rel="noopener">2,698 establishments in 2023</a> and Virginia at 641, even though EPRI&#8217;s table above puts Virginia first for data center electricity, which shows why that code isn&#8217;t a facility count.</p>
<h2>How much electricity do US data centers use?</h2>
<p>US data centers used <a href="https://energyanalysis.lbl.gov/news/berkeley-lab-report-evaluates-increase-electricity-demand-data-centers" target="_blank" rel="noopener">176 TWh in 2023, 4.4% of US electricity</a>, in Lawrence Berkeley National Laboratory&#8217;s modeled estimate for the Department of Energy, which also covers <a href="https://theenergycollective.com/data-center-water-usage/">data center water use</a>.</p>
<table>
<thead>
<tr>
<th>Period</th>
<th>US data center electricity (TWh per year)</th>
<th>Share of US electricity (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2014 to 2016</td>
<td>about 60</td>
<td>not reported</td>
</tr>
<tr>
<td>2018</td>
<td>76</td>
<td>1.9</td>
</tr>
<tr>
<td>2023</td>
<td>176</td>
<td>4.4</td>
</tr>
<tr>
<td>2028, low scenario</td>
<td>325</td>
<td>6.7</td>
</tr>
<tr>
<td>2028, high scenario</td>
<td>580</td>
<td>12.0</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf" target="_blank" rel="noopener">Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report</a>. The 2028 rows are scenarios.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/11/data-center-electricity-use-2026-11-05.png" alt="US data center electricity use was about 60 TWh a year from 2014 to 2016, reached 176 TWh in 2023 and is projected at 325 to 580 TWh in 2028" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://escholarship.org/content/qt32d6m0d1/qt32d6m0d1.pdf" target="_blank" rel="noopener">Lawrence Berkeley National Laboratory</a>.</figcaption></figure>
<p>Use stayed flat for the first three years of that series. Berkeley Lab&#8217;s 2016 report had put 2014 at <a href="https://eta-publications.lbl.gov/sites/default/files/lbnl-1005775_v2.pdf" target="_blank" rel="noopener">70 billion kWh, 1.8% of US electricity</a>, and the 2024 report revised the early years down to about 60 TWh, so the two reports shouldn&#8217;t be mixed in one series.</p>
<p>EIA measures a narrower slice. Its projections put servers alone at <a href="https://www.eia.gov/todayinenergy/detail.php?id=67704" target="_blank" rel="noopener">7% of commercial electricity use in 2025</a>, and that counts servers alone.</p>
<p>Much of that growth comes from <a href="https://theenergycollective.com/how-much-energy-does-ai-use/">the electricity AI uses</a>, and the extra load is <a href="https://theenergycollective.com/americas-grid-in-the-crosshairs-ai-aging-wires-and-a-fossil-fuel-revival/">straining parts of the US grid</a>.</p>
<h2>How much of each state&#8217;s electricity goes to data centers?</h2>
<p>EPRI estimated that data centers used <a href="https://restservice.epri.com/publicdownload/000000003002028905/0/Product" target="_blank" rel="noopener">25.59% of Virginia&#8217;s electricity in 2023</a>, the highest share among the 15 states it modeled.</p>
<table>
<thead>
<tr>
<th>State</th>
<th>Data center use, 2023 (MWh)</th>
<th>Share of state electricity, 2023 (%)</th>
<th>Share in 2030, higher-growth scenario (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Virginia</td>
<td>33,851,122</td>
<td>25.59</td>
<td>46.00</td>
</tr>
<tr>
<td>Texas</td>
<td>21,813,159</td>
<td>4.59</td>
<td>10.64</td>
</tr>
<tr>
<td>California</td>
<td>9,331,619</td>
<td>3.70</td>
<td>8.70</td>
</tr>
<tr>
<td>Illinois</td>
<td>7,450,176</td>
<td>5.48</td>
<td>12.56</td>
</tr>
<tr>
<td>Oregon</td>
<td>6,413,663</td>
<td>11.39</td>
<td>24.14</td>
</tr>
<tr>
<td>Arizona</td>
<td>6,253,268</td>
<td>7.43</td>
<td>16.58</td>
</tr>
<tr>
<td>Iowa</td>
<td>6,193,320</td>
<td>11.43</td>
<td>24.21</td>
</tr>
<tr>
<td>Georgia</td>
<td>6,175,391</td>
<td>4.26</td>
<td>9.92</td>
</tr>
<tr>
<td>Washington</td>
<td>5,171,612</td>
<td>5.69</td>
<td>13.00</td>
</tr>
<tr>
<td>Pennsylvania</td>
<td>4,590,240</td>
<td>3.16</td>
<td>7.49</td>
</tr>
<tr>
<td>New York</td>
<td>4,067,385</td>
<td>2.84</td>
<td>6.75</td>
</tr>
<tr>
<td>New Jersey</td>
<td>4,038,360</td>
<td>5.42</td>
<td>12.44</td>
</tr>
<tr>
<td>Nebraska</td>
<td>3,959,520</td>
<td>11.70</td>
<td>24.71</td>
</tr>
<tr>
<td>North Dakota</td>
<td>3,915,720</td>
<td>15.42</td>
<td>31.11</td>
</tr>
<tr>
<td>Nevada</td>
<td>3,416,707</td>
<td>8.69</td>
<td>19.07</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://restservice.epri.com/publicdownload/000000003002028905/0/Product" target="_blank" rel="noopener">EPRI, Powering Intelligence, Table 2</a>. The scenarios apply national growth estimates to state-level estimates of current demand.</p>
<p>If you live in Virginia, about a quarter of the electricity your state uses goes to data centers on EPRI&#8217;s numbers.</p>
<p>Virginia&#8217;s legislative auditors tried to price that growth for households. A typical Dominion Energy residential customer could see generation and transmission costs <a href="https://jlarc.virginia.gov/pdfs/reports/Rpt598.pdf" target="_blank" rel="noopener">rise by $14 to $37 a month by 2040</a>, in constant dollars. What you pay now depends on your state, and the page on <a href="https://theenergycollective.com/electricity-cost-by-state/">what electricity costs in each state</a> shows where yours sits.</p>
<h2>How much more electricity will data centers use?</h2>
<p>Berkeley Lab&#8217;s scenarios put data centers at <a href="https://www.energy.gov/node/4847688" target="_blank" rel="noopener">325 to 580 TWh in 2028</a>.</p>
<table>
<thead>
<tr>
<th>Forecaster</th>
<th>What it covers</th>
<th>Year</th>
<th>Result</th>
</tr>
</thead>
<tbody>
<tr>
<td>Berkeley Lab</td>
<td>US data center electricity, scenario range</td>
<td>2028</td>
<td>325 to 580 TWh</td>
</tr>
<tr>
<td>EPRI</td>
<td>US data center share of US generation, four scenarios</td>
<td>2030</td>
<td>4.6% to 9.1%</td>
</tr>
<tr>
<td>EIA, Annual Energy Outlook 2026</td>
<td>Servers in US commercial buildings only</td>
<td>2050</td>
<td>446 to 818 billion kWh</td>
</tr>
<tr>
<td>EIA, Short-Term Energy Outlook</td>
<td>US commercial-sector electricity demand, growth</td>
<td>2027</td>
<td>2.8%</td>
</tr>
<tr>
<td>PJM</td>
<td>Summer peak demand across its grid, all customers</td>
<td>2036</td>
<td>about 222,000 MW</td>
</tr>
<tr>
<td>ERCOT</td>
<td>Large loads seeking interconnection, about 87% data centers</td>
<td>Mar 26, 2026</td>
<td>about 410 GW</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.energy.gov/node/4847688" target="_blank" rel="noopener">Berkeley Lab report via DOE</a>, <a href="https://restservice.epri.com/publicdownload/000000003002028905/0/Product" target="_blank" rel="noopener">EPRI</a>, <a href="https://www.eia.gov/todayinenergy/detail.php?id=67704" target="_blank" rel="noopener">EIA Today in Energy, May 19, 2026</a>, <a href="https://www.eia.gov/outlooks/steo/report/elec_coal_renew.php" target="_blank" rel="noopener">EIA Short-Term Energy Outlook, October 6, 2026</a>, <a href="https://insidelines.pjm.com/pjms-updated-20-year-forecast-continues-to-see-significant-long-term-load-growth/" target="_blank" rel="noopener">PJM Inside Lines, January 14, 2026</a> and <a href="https://www.ercot.com/files/docs/2026/04/13/9-Interconnection-and-Grid-Analysis-Update.pdf" target="_blank" rel="noopener">ERCOT, April 2026 board update</a>.</p>
<p>These forecasts measure different things, so the rows can&#8217;t be ranked against each other. The two national data center projections start from different baselines, and EPRI&#8217;s 2030 ceiling sits below Berkeley Lab&#8217;s 2028 ceiling in the table.</p>
<p>PJM, the grid operator for much of the East, expects <a href="https://insidelines.pjm.com/pjms-updated-20-year-forecast-continues-to-see-significant-long-term-load-growth/" target="_blank" rel="noopener">a summer peak of about 222,000 MW in 2036</a>, a rise of nearly 66,000 MW in 10 years. Its forecast assumes data centers run at <a href="https://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/las/2026/20260123/20260123-item-03---pjm-2026-long-term-load-forecast---presentation.pdf" target="_blank" rel="noopener">70% of their final capacity unless an owner shows otherwise</a>. How PJM pays for that capacity is covered in the explainer on <a href="https://theenergycollective.com/capacity-market/">how PJM&#8217;s capacity prices are set</a>.</p>
<p>ERCOT&#8217;s figure counts requests for interconnection. The same slide notes the queue grew by <a href="https://www.ercot.com/files/docs/2026/04/13/9-Interconnection-and-Grid-Analysis-Update.pdf" target="_blank" rel="noopener">178 GW since the end of 2025</a>, and a request can be withdrawn.</p>
<p>EIA&#8217;s near-term view is smaller and more specific. Its October outlook has commercial demand <a href="https://www.eia.gov/outlooks/steo/report/elec_coal_renew.php" target="_blank" rel="noopener">growing 2.8% in 2027</a>, and its May outlook said commercial use would <a href="https://www.utilitydive.com/news/data-centers-electricity-residential-rates-eia/820342/" target="_blank" rel="noopener">pass residential use for the first time on record in 2027</a>.</p>
<p>How much new generation can be matched to that load is a separate question, and the page on <a href="https://theenergycollective.com/renewable-grid-limit/">how much renewable power the grid can absorb</a> takes it up.</p>
<h2>Where are new data centers being built?</h2>
<p>Pew Research Center counted <a href="https://www.pewresearch.org/short-reads/2026/04/13/most-new-data-centers-in-the-us-are-coming-to-rural-areas/" target="_blank" rel="noopener">more than 1,500 new data centers in development</a> as of February 19, 2026, using Data Center Map listings that cover planned, land-banked and under-construction projects.</p>
<p>Cleanview&#8217;s lists show where buildings are under construction. It has <a href="https://cleanview.co/data-centers/virginia" target="_blank" rel="noopener">124 buildings under construction in Virginia</a> and <a href="https://cleanview.co/data-centers/texas" target="_blank" rel="noopener">118 in Texas</a>, as of November 4, 2026.</p>
<p>The grid operators see the same geography. NERC&#8217;s 2025 assessment links the <a href="https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_LTRA_2025.pdf" target="_blank" rel="noopener">6.6 GW rise in Northwest peak load</a> to an influx of data centers into the Pacific Northwest.</p>
<h2>How we compiled these numbers</h2>
<p>We kept Cleanview and Kadoa counts apart from the Data Center Map counts, which come through Pew Research Center, because the trackers define a data center differently. Electricity figures come from Berkeley Lab and EPRI, with EIA for the forecasts, and we left out any number we couldn&#8217;t trace to a page that shows it.</p>
<p>Berkeley Lab and EPRI figures are modeled estimates, and the Census figure counts an industry. We converted nothing. Where two reports disagree about the same year, the page shows both. EIA&#8217;s next Short-Term Energy Outlook is due <a href="https://www.eia.gov/outlooks/steo/" target="_blank" rel="noopener">November 10, 2026</a>, and we&#8217;ll update the forecast table when it lands.</p>
<h2>What data center load means for your power bill</h2>
<p>EIA said in May that residential customers would pay an average of <a href="https://www.utilitydive.com/news/data-centers-electricity-residential-rates-eia/820342/" target="_blank" rel="noopener">18.2 cents per kilowatt-hour in 2026</a>, nearly 5% more than in 2025, and it said prices keep rising amid growing demand, particularly from the commercial sector, which includes data centers.</p>
<p>Who pays for new power plants is already a fight in some states. The story of <a href="https://theenergycollective.com/exelon-eyes-a-return-to-owning-power-plants-and-a-fight-over-rising-bills/">Exelon&#8217;s push to own power plants again</a> shows how that argument over rising bills is playing out.</p>
<p>Virginia&#8217;s auditors put the monthly cost to a typical Dominion customer at <a href="https://jlarc.virginia.gov/pdfs/reports/Rpt598.pdf" target="_blank" rel="noopener">$14 to $37 by 2040</a>. Your own state&#8217;s row in the EPRI table above is the quickest way to see how large the data center load is where you live.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>What is renewable energy, and how much power does it make?</title>
		<link>https://theenergycollective.com/renewable-energy/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Wed, 30 Sep 2026 14:02:17 +0000</pubDate>
				<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/renewable-energy/</guid>

					<description><![CDATA[Renewable energy is energy from sources that nature replenishes faster than people use them, and it made 33.8% of the world&#8217;s electricity in 2025, ahead of coal. In&#8230;]]></description>
										<content:encoded><![CDATA[<p>Renewable energy is energy from sources that nature <a href="https://www.un.org/en/climatechange/what-is-renewable-energy" target="_blank" rel="noopener">replenishes faster than people use them</a>, and it made <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">33.8% of the world&#8217;s electricity in 2025</a>, ahead of coal. In the US, renewables made <a href="https://www.eia.gov/energyexplained/electricity/electricity-in-the-us.php" target="_blank" rel="noopener">about 24% of utility-scale electricity</a> that year, roughly one kilowatt-hour in four. Nuclear doesn&#8217;t count, because <a href="https://www.eia.gov/energyexplained/nuclear/" target="_blank" rel="noopener">EIA classes uranium as a nonrenewable source</a>. The figures below come mostly from Ember, EIA, IRENA and the IEA, and they describe 2025 unless a line says otherwise.</p>
<h2>Top renewable energy statistics</h2>
<ul>
<li>Renewables generated <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">33.8% of the world&#8217;s electricity in 2025</a> and overtook coal at 33.0%, which Ember calls a first in 100 years.</li>
<li>Solar output rose <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/2025-in-review/" target="_blank" rel="noopener">30% to 2,778 terawatt-hours in 2025</a>, and solar passed wind as a world electricity source for the first time.</li>
<li>Wind and utility-scale solar made <a href="https://www.eia.gov/todayinenergy/detail.php?id=67367" target="_blank" rel="noopener">17% of US electricity in 2025</a>, or 19% once rooftop solar is counted.</li>
<li>Hydropower remains the world&#8217;s largest source of renewable electricity, and IHA counted <a href="https://www.hydropower.org/news/year-of-the-water-battery-global-pumped-storage-capacity-surpasses-200-gw" target="_blank" rel="noopener">1,469 gigawatts installed at the end of 2025</a>, pumped storage included.</li>
<li>Solar power cost a global average of <a href="https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2026/Jul/IRENA_TEC_RPGC_2025_Executive_summary_2026.pdf" target="_blank" rel="noopener">$44 per megawatt-hour in 2025</a>, 89% below its 2010 cost.</li>
<li>IRENA reports that <a href="https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2026/Jul/IRENA_TEC_RPGC_2025_Executive_summary_2026.pdf" target="_blank" rel="noopener">more than 90% of the utility-scale renewable projects</a> commissioned in 2025 cost less than the cheapest new fossil alternative.</li>
<li>The IEA forecasts that world renewable capacity will <a href="https://iea.blob.core.windows.net/assets/76ad6eac-2aa6-4c55-9a55-b8dc0dba9f9e/Renewables2025.pdf" target="_blank" rel="noopener">double by 2030, adding 4,600 gigawatts</a>.</li>
<li>US developers plan a record <a href="https://www.eia.gov/todayinenergy/detail.php?id=67205" target="_blank" rel="noopener">86 gigawatts of new generating capacity in 2026</a>, and solar is 51% of that plan.</li>
<li>Renewable energy employed at least <a href="https://www.ilo.org/publications/renewable-energy-and-jobs-annual-review-2025" target="_blank" rel="noopener">16.6 million people worldwide in 2024</a>, according to IRENA and the International Labour Organization.</li>
</ul>
<h2>What is renewable energy?</h2>
<p>Renewable energy is <a href="https://www.eia.gov/energyexplained/renewable-sources/" target="_blank" rel="noopener">energy from sources that are naturally replenishing but flow-limited</a>, and EIA says the resources are virtually inexhaustible but limited by their availability. The UN describes it as energy from natural sources <a href="https://www.un.org/en/climatechange/what-is-renewable-energy" target="_blank" rel="noopener">replenished at a higher rate than they are consumed</a>, with sunlight and wind as its examples.</p>
<p>EIA lists the major types as <a href="https://www.eia.gov/energyexplained/renewable-sources/" target="_blank" rel="noopener">biomass, hydropower, geothermal, wind and solar</a>. <a href="https://theenergycollective.com/biomass/">Biomass includes wood</a> and wood waste as well as <a href="https://theenergycollective.com/biofuels-explained/">biofuels</a>, though <a href="https://theenergycollective.com/is-biomass-renewable/">whether biomass is renewable</a> depends on regrowth.</p>
<p>Nonrenewable sources are the opposite. EIA says they&#8217;re <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">mined or extracted from the earth</a>, and crude oil is its example.</p>
<p><a href="https://theenergycollective.com/is-nuclear-energy-renewable/">Whether nuclear counts as renewable</a> needs its own answer. <a href="https://www.eia.gov/energyexplained/nuclear/" target="_blank" rel="noopener">EIA considers uranium a nonrenewable energy source</a>, even though it&#8217;s a common metal found in rocks worldwide. Ember reports it separately too, with nuclear at <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/electricity-demand-and-supply-trends/" target="_blank" rel="noopener">8.9% of world electricity in 2025</a>, and it adds nuclear to renewables only under a separate label, low-carbon power, which reached <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/electricity-demand-and-supply-trends/" target="_blank" rel="noopener">42.6%</a>. The <a href="/nuclear-outlook/">outlook for nuclear power</a> is covered on its own page.</p>
<h2>What are the main renewable energy sources?</h2>
<p>The main renewable <a href="https://theenergycollective.com/types-of-energy/">energy sources</a> are solar, wind, hydropower, bioenergy, geothermal and marine energy. The table shows how much of each was installed at the end of 2025.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Capacity at end of 2025 (GW)</th>
<th>Added in 2025 (GW)</th>
<th>Growth in 2025 (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Solar</td>
<td>2,392</td>
<td>511</td>
<td>27.2</td>
</tr>
<tr>
<td>Hydropower (excludes pure pumped storage)</td>
<td>1,296</td>
<td>18.4</td>
<td>1.4</td>
</tr>
<tr>
<td>Wind</td>
<td>1,291</td>
<td>159</td>
<td>14.0</td>
</tr>
<tr>
<td>Bioenergy</td>
<td>154</td>
<td>3.4</td>
<td>2.3</td>
</tr>
<tr>
<td>Geothermal</td>
<td>16</td>
<td>0.3</td>
<td>1.7</td>
</tr>
<tr>
<td>Marine</td>
<td>0.5</td>
<td>Not reported</td>
<td>Not reported</td>
</tr>
<tr>
<td>All renewables</td>
<td>5,149</td>
<td>692</td>
<td>15.5</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2026/Mar/IRENA_DAT_RE_capacity_highlights_2026.pdf" target="_blank" rel="noopener">IRENA, 2026 renewable capacity report</a>. Hydropower excludes pure pumped storage, which IRENA counts separately. Capacity measures what has been built and says nothing about how much power it generated.</p>
<p>Hydropower and wind are nearly level in the table. Geothermal and marine energy are small, and a section below covers them.</p>
<h2>How much of the world&#8217;s electricity is renewable?</h2>
<p>Renewables&#8217; share of world electricity rose from <a href="https://files.ember-energy.org/public-downloads/yearly_full_release_long_format.csv" target="_blank" rel="noopener">18.04% in 2001 to 33.78% in 2025</a>, counting solar, wind, hydropower, bioenergy and other renewables and leaving nuclear out.</p>
<table>
<thead>
<tr>
<th>Year</th>
<th>US renewables share of electricity (%)</th>
<th>World renewables share of electricity (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>2001</td>
<td>7.5</td>
<td>18.04</td>
</tr>
<tr>
<td>2002</td>
<td>8.75</td>
<td>17.91</td>
</tr>
<tr>
<td>2003</td>
<td>9.03</td>
<td>17.44</td>
</tr>
<tr>
<td>2004</td>
<td>8.73</td>
<td>17.98</td>
</tr>
<tr>
<td>2005</td>
<td>8.75</td>
<td>18.1</td>
</tr>
<tr>
<td>2006</td>
<td>9.43</td>
<td>18.23</td>
</tr>
<tr>
<td>2007</td>
<td>8.39</td>
<td>17.98</td>
</tr>
<tr>
<td>2008</td>
<td>9.18</td>
<td>18.91</td>
</tr>
<tr>
<td>2009</td>
<td>10.54</td>
<td>19.47</td>
</tr>
<tr>
<td>2010</td>
<td>10.31</td>
<td>19.72</td>
</tr>
<tr>
<td>2011</td>
<td>12.46</td>
<td>20.02</td>
</tr>
<tr>
<td>2012</td>
<td>12.19</td>
<td>20.98</td>
</tr>
<tr>
<td>2013</td>
<td>12.83</td>
<td>21.72</td>
</tr>
<tr>
<td>2014</td>
<td>13.35</td>
<td>22.25</td>
</tr>
<tr>
<td>2015</td>
<td>13.63</td>
<td>22.97</td>
</tr>
<tr>
<td>2016</td>
<td>15.29</td>
<td>23.74</td>
</tr>
<tr>
<td>2017</td>
<td>17.46</td>
<td>24.47</td>
</tr>
<tr>
<td>2018</td>
<td>17.44</td>
<td>25.08</td>
</tr>
<tr>
<td>2019</td>
<td>18.3</td>
<td>26.08</td>
</tr>
<tr>
<td>2020</td>
<td>20.31</td>
<td>27.99</td>
</tr>
<tr>
<td>2021</td>
<td>20.75</td>
<td>28.11</td>
</tr>
<tr>
<td>2022</td>
<td>22.34</td>
<td>29.48</td>
</tr>
<tr>
<td>2023</td>
<td>22.68</td>
<td>30.34</td>
</tr>
<tr>
<td>2024</td>
<td>24.07</td>
<td>31.95</td>
</tr>
<tr>
<td>2025</td>
<td>25.63</td>
<td>33.78</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://files.ember-energy.org/public-downloads/yearly_full_release_long_format.csv" target="_blank" rel="noopener">Ember, Yearly Electricity Data, full release CSV</a>, downloaded September 30, 2026. Ember amends this file, so a later download can differ slightly.</p>
<figure class="ec-chart"><img decoding="async" src="https://theenergycollective.com/wp-content/uploads/2026/09/renewable-energy-share-history-2026-09-30.png" alt="Line chart of renewables&#x27; share of electricity, rising in the US from 7.5% in 2001 to 25.63% in 2025 and in the world from 18.04% in 2001 to 33.78% in 2025" width="1200" height="700" loading="lazy" /><figcaption>Chart: Energy Collective. Data: <a href="https://ember-energy.org/data/yearly-electricity-data/" target="_blank" rel="noopener">Ember, Yearly Electricity Data</a>.</figcaption></figure>
<p>The world share was flat through most of the 2000s and has risen every year from <a href="https://files.ember-energy.org/public-downloads/yearly_full_release_long_format.csv" target="_blank" rel="noopener">2008 to 2025</a>. The US series is bumpier, and it stayed below the world&#8217;s in every year.</p>
<h2>How much US electricity is renewable?</h2>
<p>EIA counts renewables at <a href="https://www.eia.gov/energyexplained/electricity/electricity-in-the-us.php" target="_blank" rel="noopener">about 24% of US utility-scale electricity in 2025</a>, up from about 12% in 1990, and utility-scale means plants of 1 megawatt and up.</p>
<p>Utility-scale plants made <a href="https://www.eia.gov/todayinenergy/detail.php?id=67367" target="_blank" rel="noopener">464,000 gigawatt-hours of wind power and 296,000 of solar power in 2025</a>. Small-scale solar added <a href="https://www.eia.gov/todayinenergy/detail.php?id=67367" target="_blank" rel="noopener">about 93,000 gigawatt-hours</a>, and counting it lifts wind and solar to 19% of US generation. If you have panels on your roof, your system sits in that small-scale group.</p>
<p>Ember counts small-scale solar in its US total, which is why its figure runs higher than EIA&#8217;s. The table gives the US and world split by source.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>US generation, 2025 (TWh)</th>
<th>US share of electricity (%)</th>
<th>World generation, 2025 (TWh)</th>
<th>World share of electricity (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Hydropower</td>
<td>241.7</td>
<td>5.35</td>
<td>4,432.3</td>
<td>13.97</td>
</tr>
<tr>
<td>Wind</td>
<td>464.39</td>
<td>10.27</td>
<td>2,711.9</td>
<td>8.55</td>
</tr>
<tr>
<td>Solar</td>
<td>388.82</td>
<td>8.6</td>
<td>2,778.6</td>
<td>8.76</td>
</tr>
<tr>
<td>Bioenergy</td>
<td>46.19</td>
<td>1.02</td>
<td>704.94</td>
<td>2.22</td>
</tr>
<tr>
<td>Other renewables</td>
<td>17.7</td>
<td>0.39</td>
<td>89.32</td>
<td>0.28</td>
</tr>
<tr>
<td>All renewables</td>
<td>1,158.8</td>
<td>25.63</td>
<td>10,717.06</td>
<td>33.78</td>
</tr>
<tr>
<td>Nuclear (not renewable)</td>
<td>784.78</td>
<td>17.36</td>
<td>2,812.39</td>
<td>8.86</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://ember-energy.org/data/yearly-electricity-data/" target="_blank" rel="noopener">Ember, Yearly Electricity Data</a>, which includes small-scale solar. Nuclear is shown as a comparison and isn&#8217;t part of the renewable total.</p>
<p><a href="https://theenergycollective.com/hydropower/">Hydropower leads worldwide</a> and wind leads in the US. On its own utility-scale basis, EIA puts US hydropower at <a href="https://www.eia.gov/energyexplained/hydropower/" target="_blank" rel="noopener">about 5.6% of electricity</a> and 23.1% of the renewable total.</p>
<h2>Why the renewable share depends on what you measure</h2>
<p>Renewables are a bigger share of world power capacity than of the electricity generated, and a much smaller share of all energy. All the figures in the table are right, and they answer different questions.</p>
<table>
<thead>
<tr>
<th>What is measured</th>
<th>Scope</th>
<th>Renewables share, 2025 (%)</th>
<th>Source</th>
</tr>
</thead>
<tbody>
<tr>
<td>Share of electricity generation</td>
<td>World</td>
<td>33.8</td>
<td>Ember</td>
</tr>
<tr>
<td>Share of electricity generation</td>
<td>US (utility-scale only)</td>
<td>24</td>
<td>EIA</td>
</tr>
<tr>
<td>Share of electricity generation</td>
<td>US (adds small-scale solar)</td>
<td>25.6</td>
<td>Ember</td>
</tr>
<tr>
<td>Share of installed capacity</td>
<td>World</td>
<td>49.4</td>
<td>IRENA</td>
</tr>
<tr>
<td>Share of installed capacity</td>
<td>US (utility-scale)</td>
<td>33.0</td>
<td>FERC via Electrek</td>
</tr>
<tr>
<td>Share of total energy</td>
<td>World</td>
<td>8.6</td>
<td>Energy Institute via Our World in Data</td>
</tr>
<tr>
<td>Share of total energy</td>
<td>US</td>
<td>9</td>
<td>EIA (primary energy consumption)</td>
</tr>
<tr>
<td>Share of total energy</td>
<td>US</td>
<td>7.2</td>
<td>Energy Institute via Our World in Data</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">Ember, Global Electricity Review 2026</a>, <a href="https://www.eia.gov/energyexplained/electricity/electricity-in-the-us.php" target="_blank" rel="noopener">EIA, Electricity in the U.S.</a>, <a href="https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2026/Mar/IRENA_DAT_RE_capacity_highlights_2026.pdf" target="_blank" rel="noopener">IRENA, 2026 renewable capacity report</a>, <a href="https://electrek.co/2026/04/01/ferc-renewables-made-up-88-of-new-us-power-generating-capacity-in-2025/" target="_blank" rel="noopener">Electrek, reporting FERC data</a>, <a href="https://ourworldindata.org/grapher/renewable-share-energy" target="_blank" rel="noopener">Our World in Data, using Energy Institute data</a> and <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">EIA, U.S. energy facts</a>.</p>
<p>Total energy includes fuel for heat and transport. EIA reports renewables at <a href="https://www.eia.gov/energyexplained/us-energy-facts/" target="_blank" rel="noopener">about 9% of US primary energy consumption in 2025</a>, a record, while the Energy Institute series gives <a href="https://ourworldindata.org/grapher/renewable-share-energy" target="_blank" rel="noopener">7.2% for the US</a> and counts energy differently. Biomass shows how wide the gap can get. It supplied <a href="https://www.eia.gov/energyexplained/biomass/" target="_blank" rel="noopener">about 5% of US primary energy in 2025</a>, yet the Ember table above puts it at 1.02% of US electricity.</p>
<h2>How fast are solar and wind growing?</h2>
<p>A <a href="https://www.eia.gov/energyexplained/solar/" target="_blank" rel="noopener">photovoltaic cell turns sunlight directly into electricity</a>, with no turbine in between. IRENA counts <a href="https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2026/Mar/IRENA_DAT_RE_capacity_highlights_2026.pdf" target="_blank" rel="noopener">511 gigawatts of new solar in 2025 against 159 of new wind</a>.</p>
<p>Ember counted <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/2025-in-review/" target="_blank" rel="noopener">647 gigawatts of solar added in 2025</a>, measured in direct current, so it shouldn&#8217;t be compared with IRENA&#8217;s figure. Wind has three counters. GWEC reports <a href="https://www.gwec.net/news/global-wind-installations-rise-record-40-as-industry-charts-way-out-of-energy-crisis" target="_blank" rel="noopener">165 gigawatts of new wind in 2025</a>, a 40% rise. Ember counts <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/2025-in-review/" target="_blank" rel="noopener">167 gigawatts</a>.</p>
<p>In the US, FERC&#8217;s data show utility-scale solar at <a href="https://electrek.co/2026/04/01/ferc-renewables-made-up-88-of-new-us-power-generating-capacity-in-2025/" target="_blank" rel="noopener">12.2% of installed capacity, ahead of wind at 11.9%</a> at the end of 2025. Two pages go deeper on each, <a href="/solar-growth/">US solar growth</a> and <a href="/wind-power-growth/">wind power growth</a>.</p>
<h2>What about hydropower, geothermal, biomass and the smaller sources?</h2>
<p>In a hydropower plant, <a href="https://www.eia.gov/energyexplained/hydropower/" target="_blank" rel="noopener">water flows through a pipe and turns the blades of a turbine</a> that spins a generator. IHA counted <a href="https://www.hydropower.org/news/year-of-the-water-battery-global-pumped-storage-capacity-surpasses-200-gw" target="_blank" rel="noopener">28 gigawatts of new hydropower in 2025</a>, including about 11.7 gigawatts of pumped storage. Pumped storage has <a href="https://www.powermag.com/pumped-storage-additions-lead-global-hydropower-growth/" target="_blank" rel="noopener">passed 200 gigawatts worldwide</a>, and DOE puts the firm capacity of US hydropower, its guaranteed minimum output, at <a href="https://www.energy.gov/eere/water/hydropower-basics" target="_blank" rel="noopener">over 24 gigawatts</a>.</p>
<p>Geothermal plants use water or steam at <a href="https://www.eia.gov/energyexplained/geothermal/geothermal-power-plants.php" target="_blank" rel="noopener">300 to 700 degrees Fahrenheit</a> from wells that are sometimes 2 miles deep. Fervo Energy says its Cape Station in Utah reached <a href="https://fervoenergy.com/fervo-energy-achieves-first-power-at-cape-station-a-landmark-moment-for-the-future-of-enhanced-geothermal-systems/" target="_blank" rel="noopener">First Power on September 24, 2026</a>, the first utility-scale enhanced geothermal project to do so, with <a href="https://fervoenergy.com/fervo-energy-achieves-first-power-at-cape-station-a-landmark-moment-for-the-future-of-enhanced-geothermal-systems/" target="_blank" rel="noopener">900 MW fully contracted</a>. Cape Station uses <a href="/how-geothermal-energy-works-egs/">enhanced geothermal systems</a>, which fracture hot rock to create a reservoir.</p>
<p>Of the biomass energy the US used in 2025, <a href="https://www.eia.gov/energyexplained/biomass/" target="_blank" rel="noopener">53% was biofuels and 39% was wood</a>, and only 7% went to electric power.</p>
<p>Marine energy is tiny. The US has <a href="https://www.eia.gov/energyexplained/hydropower/tidal-power.php" target="_blank" rel="noopener">no commercially operating tidal power plants</a>, and the waves off US coasts hold a theoretical <a href="https://www.eia.gov/energyexplained/hydropower/wave-power.php" target="_blank" rel="noopener">2.64 trillion kilowatt-hours a year</a>, which is potential and not what devices can capture. Solar thermal plants use <a href="https://www.eia.gov/energyexplained/solar/solar-thermal-power-plants.php" target="_blank" rel="noopener">mirrors to concentrate sunlight</a> and make steam, and some store heat for the evening.</p>
<h2>What does renewable energy cost?</h2>
<p>Lazard puts unsubsidized US utility-scale solar at <a href="https://www.utilitydive.com/news/renewables-remain-cheapest-lcoe-rising-lazard/825443/" target="_blank" rel="noopener">$40 to $98 per megawatt-hour in 2026</a>.</p>
<p>On the scale of your power bill, that converts to <a href="https://www.utilitydive.com/news/renewables-remain-cheapest-lcoe-rising-lazard/825443/" target="_blank" rel="noopener">4.0 to 9.8 cents per kilowatt-hour</a>. Lazard says <a href="https://www.utilitydive.com/news/renewables-remain-cheapest-lcoe-rising-lazard/825443/" target="_blank" rel="noopener">unsubsidized renewables remain the most cost-competitive new build</a>, though the cost of electricity is rising for every type of generation. IRENA&#8217;s world averages show which sources got cheaper.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Global average cost of electricity, 2025 (USD per MWh)</th>
<th>Change since 2010 (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Onshore wind</td>
<td>33</td>
<td>-71</td>
</tr>
<tr>
<td>Solar PV</td>
<td>44</td>
<td>-89</td>
</tr>
<tr>
<td>Hydropower</td>
<td>62</td>
<td>+41</td>
</tr>
<tr>
<td>Offshore wind</td>
<td>78</td>
<td>-63</td>
</tr>
<tr>
<td>Bioenergy</td>
<td>86</td>
<td>-3</td>
</tr>
<tr>
<td>Geothermal</td>
<td>89</td>
<td>+53</td>
</tr>
<tr>
<td>Concentrated solar power</td>
<td>115</td>
<td>-72</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2026/Jul/IRENA_TEC_RPGC_2025_Executive_summary_2026.pdf" target="_blank" rel="noopener">IRENA, Renewable power generation costs in 2025</a>. Global weighted averages of new projects in 2025 dollars. Solar PV&#8217;s 2025 average was unchanged from 2024. Cost of electricity is not the price a buyer pays.</p>
<p>Adding a gigawatt of solar took about <a href="https://iea.blob.core.windows.net/assets/64594543-cf6e-4fd9-8238-d3cae35daf48/WorldEnergyInvestment2026.pdf" target="_blank" rel="noopener">$0.7 billion in 2025 against about $3 billion in 2015</a>, the IEA says.</p>
<h2>What are the pros and cons of renewable energy?</h2>
<p>One limit is the grid. California&#8217;s grid operator curtailed <a href="https://www.eia.gov/todayinenergy/detail.php?id=65364" target="_blank" rel="noopener">3.4 million megawatt-hours of wind and solar in 2024</a>, and solar was 93% of it. In the US, about <a href="https://www.publicpower.org/periodical/article/backlog-power-plants-seeking-transmission-grid-connection-eased-somewhat-2025-lbnl" target="_blank" rel="noopener">2,061 gigawatts of generation and storage</a> was waiting for a grid connection at the end of 2025, according to Lawrence Berkeley National Laboratory. How that plays out is the subject of the page on the <a href="/renewable-grid-limit/">limits of the renewable grid</a>.</p>
<p>Batteries are one answer. US utility-scale batteries reached <a href="https://www.eia.gov/todayinenergy/detail.php?id=67925" target="_blank" rel="noopener">43.6 gigawatts at the end of 2025</a>, and operators plan 54 gigawatts more over the next two and a half years.</p>
<p>Renewables also bring jobs and low emissions. The world had at least <a href="https://www.ilo.org/publications/renewable-energy-and-jobs-annual-review-2025" target="_blank" rel="noopener">16.6 million renewable energy jobs in 2024</a>, and DOE&#8217;s survey counted <a href="https://www.energy.gov/documents/2026-useer-national-report" target="_blank" rel="noopener">359,400 US solar power generation workers in 2025</a>, 3% fewer than in 2024. Over a full lifecycle, onshore wind has a median of <a href="https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf" target="_blank" rel="noopener">11 grams of CO2-equivalent per kilowatt-hour</a> in IPCC&#8217;s 2014 assessment, and coal has 820.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Minimum (gCO2eq per kWh)</th>
<th>Median (gCO2eq per kWh)</th>
<th>Maximum (gCO2eq per kWh)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Coal (pulverized)</td>
<td>740</td>
<td>820</td>
<td>910</td>
</tr>
<tr>
<td>Natural gas (combined cycle)</td>
<td>410</td>
<td>490</td>
<td>650</td>
</tr>
<tr>
<td>Biomass (dedicated)</td>
<td>130</td>
<td>230</td>
<td>420</td>
</tr>
<tr>
<td>Solar PV (utility)</td>
<td>18</td>
<td>48</td>
<td>180</td>
</tr>
<tr>
<td>Solar PV (rooftop)</td>
<td>26</td>
<td>41</td>
<td>60</td>
</tr>
<tr>
<td>Geothermal</td>
<td>6.0</td>
<td>38</td>
<td>79</td>
</tr>
<tr>
<td>Concentrated solar power</td>
<td>8.8</td>
<td>27</td>
<td>63</td>
</tr>
<tr>
<td>Hydropower</td>
<td>1.0</td>
<td>24</td>
<td>2,200</td>
</tr>
<tr>
<td>Wind (offshore)</td>
<td>8.0</td>
<td>12</td>
<td>35</td>
</tr>
<tr>
<td>Nuclear</td>
<td>3.7</td>
<td>12</td>
<td>110</td>
</tr>
<tr>
<td>Wind (onshore)</td>
<td>7.0</td>
<td>11</td>
<td>56</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.ipcc.ch/site/assets/uploads/2018/02/ipcc_wg3_ar5_annex-iii.pdf" target="_blank" rel="noopener">IPCC, Fifth Assessment Report, Working Group III, Annex III, Table A.III.2</a>. Lifecycle emissions include building and fuel supply. Hydropower&#8217;s range is the widest.</p>
<h2>Where these numbers come from</h2>
<p>World electricity shares come from Ember and US shares from EIA, and the two count differently by design. EIA counts utility-scale plants, while Ember adds small-scale solar and IRENA counts capacity. We converted Lazard&#8217;s dollars per megawatt-hour to cents per kilowatt-hour by dividing by ten. Ember revises its data file, so a later download can differ slightly.</p>
<h2>The 2026 US build plan</h2>
<p>EIA says US developers plan <a href="https://www.eia.gov/todayinenergy/detail.php?id=67205" target="_blank" rel="noopener">86 gigawatts of new capacity in 2026</a>, a record if they finish it, and 53 gigawatts were added in 2025.</p>
<table>
<thead>
<tr>
<th>Source</th>
<th>Planned US utility-scale additions, 2026 (GW)</th>
<th>Share of the 86 GW plan (%)</th>
</tr>
</thead>
<tbody>
<tr>
<td>Solar</td>
<td>43.4</td>
<td>51</td>
</tr>
<tr>
<td>Battery storage</td>
<td>24</td>
<td>28</td>
</tr>
<tr>
<td>Wind</td>
<td>11.8</td>
<td>14</td>
</tr>
<tr>
<td>Natural gas</td>
<td>6.3</td>
<td>Not reported</td>
</tr>
</tbody>
</table>
<p>Source: <a href="https://www.eia.gov/todayinenergy/detail.php?id=67205" target="_blank" rel="noopener">EIA, Today in Energy, February 20, 2026</a>. Plans are what developers report, and they can slip.</p>
<p>Solar carries the plan and batteries come second. The IEA expects <a href="https://iea.blob.core.windows.net/assets/76ad6eac-2aa6-4c55-9a55-b8dc0dba9f9e/Renewables2025.pdf" target="_blank" rel="noopener">solar to account for almost 80% of the 4,600 gigawatts</a> of new renewable capacity by 2030. Before you compare any two renewable energy shares, check whether each one counts electricity, capacity or total energy.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Why the US power grid is under strain</title>
		<link>https://theenergycollective.com/americas-grid-in-the-crosshairs-ai-aging-wires-and-a-fossil-fuel-revival/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 28 Sep 2026 18:27:05 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=463</guid>

					<description><![CDATA[NERC, the nonprofit that oversees North American grid reliability, now expects summer peak demand to climb by more than 224 gigawatts over the next 10 years, which it&#8230;]]></description>
										<content:encoded><![CDATA[<p>NERC, the nonprofit that oversees North American grid reliability, now expects summer peak demand to climb by <a href="https://www.nerc.com/globalassets/our-work/assessments/nerc_ltra_2025.pdf" target="_blank" rel="noopener">more than 224 gigawatts over the next 10 years</a>, which it says is <a href="https://www.nerc.com/globalassets/our-work/assessments/nerc_ltra_2025.pdf" target="_blank" rel="noopener">69% higher than the growth it projected a year earlier</a>. New data centers built for artificial intelligence account for <a href="https://www.nerc.com/globalassets/our-work/assessments/nerc_ltra_2025.pdf" target="_blank" rel="noopener">most of that increase</a>. You&#8217;ll likely feel that gap as summer conservation appeals and higher delivery charges on your electric bill.</p>
<p>That growth is landing on a grid the Department of Energy already says <a href="https://www.energy.gov/sites/default/files/2023-12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf" target="_blank" rel="noopener">faces aging infrastructure and insufficient transmission capacity</a>. Utilities and grid operators are racing to add capacity fast enough to keep up, on both the power plants themselves and the wires that carry what they produce.</p>
<h2>Data centers are driving most of the new demand</h2>
<p>US electricity consumption <a href="https://www.eia.gov/todayinenergy/detail.php?id=65264" target="_blank" rel="noopener">stayed nearly flat for two decades</a>, then started climbing again. The Energy Information Administration now forecasts average growth of <a href="https://www.eia.gov/todayinenergy/detail.php?id=65264" target="_blank" rel="noopener">1.7% a year from 2020 through 2026</a>, enough that 2025 and 2026 are both projected to <a href="https://www.eia.gov/todayinenergy/detail.php?id=65264" target="_blank" rel="noopener">top the prior high set in 2024</a>. The commercial sector, which includes data centers, is growing faster than that average, at <a href="https://www.eia.gov/todayinenergy/detail.php?id=65264" target="_blank" rel="noopener">2.6% a year over the same stretch</a>, alongside industrial growth from manufacturing, all drawing on the same grid you plug into every day.</p>
<p>A data center is a warehouse of server racks running around the clock, plus the chillers and fans needed to keep them from overheating, and the <a href="https://theenergycollective.com/data-center-water-usage/">water used to cool many of them</a>. The building might sit somewhere you&#8217;ll never see, but the electricity to run it comes out of the same grid that powers your house, drawn from the same power plants and the same substations that serve everyone else nearby.</p>
<h2>How much power data centers actually use</h2>
<p>US data centers used <a href="https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf" target="_blank" rel="noopener">176 terawatt-hours of electricity in 2023</a>, <a href="https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf" target="_blank" rel="noopener">about 4.4% of total US consumption</a> that year, according to Lawrence Berkeley National Laboratory, on the same grid that reaches your own house. The lab&#8217;s 2028 projection spans a wide range. It runs from <a href="https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf" target="_blank" rel="noopener">325 to 580 terawatt-hours</a>. That range equals <a href="https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf" target="_blank" rel="noopener">6.7% to 12.0% of the country&#8217;s forecast electricity use</a> that year, because so much depends on how many GPUs ship, <a href="https://theenergycollective.com/how-much-energy-does-ai-use/">how much electricity AI uses</a> and how efficient the cooling gets.</p>
<p>Globally, data centers used <a href="https://www.iea.org/reports/energy-and-ai/executive-summary" target="_blank" rel="noopener">about 415 terawatt-hours in 2024, 1.5% of the world&#8217;s electricity</a>, with the <a href="https://www.iea.org/reports/energy-and-ai/executive-summary" target="_blank" rel="noopener">United States accounting for 45% of that global total</a>, according to the International Energy Agency. The IEA expects global data center electricity use to <a href="https://www.iea.org/reports/energy-and-ai/executive-summary" target="_blank" rel="noopener">more than double to around 945 terawatt-hours by 2030</a>.</p>
<h2>Grid operators are already flagging the strain</h2>
<p>NERC&#8217;s <a href="https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_SRA_2025.pdf" target="_blank" rel="noopener">2025 summer reliability assessment</a> flagged MISO as being at risk of running short on reserves during high demand, and named ERCOT for evening hours when solar output fades. New England drew a warning about <a href="https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_SRA_2025.pdf" target="_blank" rel="noopener">supply shortfalls under extreme conditions</a>, and the Southwest Power Pool region about <a href="https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_SRA_2025.pdf" target="_blank" rel="noopener">energy shortfalls when demand is high and wind is low</a>. In the Southeast, utilities told NERC that <a href="https://www.nerc.com/pa/RAPA/ra/Reliability%20Assessments%20DL/NERC_SRA_2025.pdf" target="_blank" rel="noopener">peak demand rose about 2% that summer</a>, citing economic growth and data mining loads as drivers alongside other industry.</p>
<p>When NERC flags this kind of risk in your region, it can mean a request to ease up on air conditioning during a hot evening, or in a serious shortfall, a rolling outage, the kind of gap a <a href="https://theenergycollective.com/home-battery-backup/">home battery backup</a> is meant to cover. The pressure is concentrated in specific places. NERC&#8217;s longer-range assessment has <a href="https://www.nerc.com/globalassets/our-work/assessments/nerc_ltra_2025.pdf" target="_blank" rel="noopener">MISO projecting 18 gigawatts of data center load by 2035</a>, while <a href="https://www.nerc.com/globalassets/our-work/assessments/nerc_ltra_2025.pdf" target="_blank" rel="noopener">ERCOT expects 23 of its 45 gigawatts</a> of large loads asking to connect by 2030 to be data centers.</p>
<h2>Demand forecasts keep climbing, unevenly</h2>
<p>Utilities themselves keep raising their own numbers. Grid Strategies, which compiles utility forecasts every year, found the <a href="https://gridstrategiesllc.com/project/load-growth-forecast/" target="_blank" rel="noopener">national load forecast reached 166 gigawatts of growth by 2030</a>, a six-fold jump from the flat growth utilities had forecast back in 2022. The EIA&#8217;s September 2026 outlook projects US electricity consumption of <a href="https://www.eia.gov/outlooks/steo/" target="_blank" rel="noopener">4,135 billion kilowatt-hours in 2026</a> and <a href="https://www.eia.gov/outlooks/steo/" target="_blank" rel="noopener">4,211 billion in 2027</a>, attributing the growth to data center development and manufacturing.</p>
<p>Not every regional forecast has moved in the same direction, though. The EIA <a href="https://www.utilitydive.com/news/energy-short-term-outlook-2026-load-demand-data-centers/807530/" target="_blank" rel="noopener">cut its 2026 US generation growth forecast to 1.7%</a>, down from an earlier estimate of 3%, after large loads came online slower than expected. ERCOT&#8217;s own 2026 growth forecast <a href="https://www.utilitydive.com/news/energy-short-term-outlook-2026-load-demand-data-centers/807530/" target="_blank" rel="noopener">dropped from 15.7% to 9.6%</a>, because of a pause in connecting new data center projects to the Texas grid. If you get your power through ERCOT, that pause is part of why your own region&#8217;s growth forecast got cut nearly in half.</p>
<h2>Old transmission lines are the bottleneck</h2>
<p>The Department of Energy&#8217;s National Transmission Needs Study puts a number on what catching up requires. Under its high load growth scenario, <a href="https://www.energy.gov/sites/default/files/2023-12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf" target="_blank" rel="noopener">within-region transmission capacity needs to grow 128% by 2035 compared with 2020</a>, and <a href="https://www.energy.gov/sites/default/files/2023-12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf" target="_blank" rel="noopener">capacity to move power between regions needs to grow 412%</a>, more than fivefold. Picture the high-voltage towers and transformers strung across the country decades ago, now asked to carry loads their designers never planned for.</p>
<p>The need isn&#8217;t spread evenly. The same DOE study breaks this out by region. Texas would need <a href="https://www.energy.gov/sites/default/files/2023-12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf" target="_blank" rel="noopener">140% more transmission capacity by 2035</a>, the Plains <a href="https://www.energy.gov/sites/default/files/2023-12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf" target="_blank" rel="noopener">119%</a>, and the Midwest <a href="https://www.energy.gov/sites/default/files/2023-12/National%20Transmission%20Needs%20Study%20-%20Final_2023.12.1.pdf" target="_blank" rel="noopener">112%</a>.</p>
<p>Texas and the Midwest, covered above through ERCOT and MISO, are two of the same regions already citing <a href="https://theenergycollective.com/data-center-statistics/">heavy data center growth</a>. If your state is one of those three, this is the specific bottleneck grid planners are racing hardest to fix.</p>
<p>Solar and battery projects are exposed here too. Transmission bottlenecks are one reason a grid can only <a href="https://theenergycollective.com/renewable-grid-limit/">absorb so much wind and solar</a> before reliability questions come up, regardless of how cheap the panels get.</p>
<h2>The strain already shows up in your electricity bill</h2>
<p>PJM, which runs the grid for a large stretch of the mid-Atlantic and Midwest, holds an annual auction that pays power plants to be available for future years. Its <a href="https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2026-releases/20260714-pjm-capacity-auction-procures-138318-mw-of-generation-resources.pdf" target="_blank" rel="noopener">2028/2029 auction cleared at $325 per megawatt-day</a>, a bit below <a href="https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2026-releases/20260714-pjm-capacity-auction-procures-138318-mw-of-generation-resources.pdf" target="_blank" rel="noopener">the prior year&#8217;s price cap of $333.44 per megawatt-day</a> but still the third straight auction to hit the FERC-approved ceiling.</p>
<p>If you live in PJM&#8217;s territory, those capacity payments flow into the <a href="https://theenergycollective.com/electricity-cost-by-state/">delivery charges on your electric bill</a>, years before the power itself gets delivered. The high, capped price is itself a signal that the region doesn&#8217;t have enough spare generation bidding into the auction to push the price down on its own.</p>
<h2>Reconductoring old towers is the fastest fix on the table</h2>
<p>The Department of Energy launched its <a href="https://www.energy.gov/oe/speed-power" target="_blank" rel="noopener">Speed to Power initiative on September 18, 2025</a>, aiming to shorten the years it typically takes to permit and build large transmission and generation projects. One piece of it, called SPARK, put up <a href="https://www.energy.gov/oe/speed-power" target="_blank" rel="noopener">about $1.9 billion for reconductoring and other upgrades to existing transmission lines</a>, with a <a href="https://www.energy.gov/oe/speed-power" target="_blank" rel="noopener">concept paper deadline of April 2, 2026</a> for the first round of applicants.</p>
<p>Reconductoring existing towers with higher-capacity cable adds capacity without waiting years for new rights of way, using the same towers already standing over highways and backyards across the country. On the supply side, the EIA expects solar generation to grow <a href="https://www.utilitydive.com/news/energy-short-term-outlook-2026-load-demand-data-centers/807530/" target="_blank" rel="noopener">92% in ERCOT</a> and <a href="https://www.utilitydive.com/news/energy-short-term-outlook-2026-load-demand-data-centers/807530/" target="_blank" rel="noopener">63% in PJM</a> between 2024 and 2026, adding supply on a timeline utilities control directly.</p>
<p>One option skips the wait entirely. <a href="https://theenergycollective.com/smart-grid/">Smart meters and demand response programs</a> already pay you to cut usage during the same peak hours that strain the grid, whether or not your region&#8217;s transmission upgrades get picked for DOE funding.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Should utilities own power plants again?</title>
		<link>https://theenergycollective.com/exelon-eyes-a-return-to-owning-power-plants-and-a-fight-over-rising-bills/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 28 Sep 2026 18:19:05 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/?p=506</guid>

					<description><![CDATA[Exelon wants states to let utilities own power plants again, pointing to a $329.17 per megawatt-day capacity price for 2026/2027, the highest regulators allow. That&#8217;s an 833% jump&#8230;]]></description>
										<content:encoded><![CDATA[<p>Exelon wants states to let utilities own power plants again, pointing to <a href="https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf" target="_blank" rel="noopener">a $329.17 per megawatt-day capacity price for 2026/2027</a>, the highest regulators allow. That&#8217;s an <a href="https://www.nj.gov/bpu/newsroom/2025/approved/20250723.html" target="_blank" rel="noopener">833% jump</a> from the year before, according to New Jersey&#8217;s utility regulator.</p>
<p>If you get a bill from BGE, you&#8217;re already feeling it. The delivery rate alone is up <a href="https://marylandmatters.org/2025/11/03/exelon-power-plant-regulated-generation/" target="_blank" rel="noopener">30% since 2020</a>, and Exelon CEO Calvin Butler wants state lawmakers to let his company build new power plants of its own to bring supply costs down.</p>
<h2>The supply side is what&#8217;s pushing bills up</h2>
<p>Butler says <a href="https://www.investing.com/news/stock-market-news/exelon-to-intensify-push-to-own-midatlantic-power-plants-ceo-says-4251873" target="_blank" rel="noopener">about 80% of recent bill increases</a> in Exelon&#8217;s territory came from power supply costs. Delivery charges, the part a utility controls directly, climbed too, though by less. BGE&#8217;s distribution rate is up <a href="https://marylandmatters.org/2025/11/03/exelon-power-plant-regulated-generation/" target="_blank" rel="noopener">30% since 2020</a> and has run at <a href="https://marylandmatters.org/2025/11/03/exelon-power-plant-regulated-generation/" target="_blank" rel="noopener">about twice the rate of inflation since 2010</a>, according to Maryland&#8217;s Office of People&#8217;s Counsel.</p>
<p>Regulators are also letting utilities earn more on that delivery business. Pepco&#8217;s <a href="https://www.exeloncorp.com/content/dam/exelon/company/Documents/earnings/Q3&#039;25%20Earnings%20-%20Press%20Release%20and%20Earnings%20Attachments%20-%2011.4.2025.pdf" target="_blank" rel="noopener">October 2025 Maryland rate filing requested a 10.50% return on equity</a>, the regulated profit a utility earns on its wires investment. For a Pepco customer, that <a href="https://www.exeloncorp.com/content/dam/exelon/company/Documents/earnings/Q3&#039;25%20Earnings%20-%20Press%20Release%20and%20Earnings%20Attachments%20-%2011.4.2025.pdf" target="_blank" rel="noopener">10.50% return</a> is money built into your delivery bill before the company builds a single power plant. Butler argues that same guaranteed, regulated return is what makes utility-built power plants cheap to finance compared with a merchant generator borrowing at market rates.</p>
<h2>Data centers and new demand are straining the system</h2>
<p>The supply side is under pressure because demand is climbing. The Energy Information Administration expects US electricity use to keep rising through 2027, <a href="https://www.eia.gov/pressroom/releases/press582.php" target="_blank" rel="noopener">the strongest four-year growth stretch since 2000</a>. Data centers are the biggest reason EIA cites. They used <a href="https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf" target="_blank" rel="noopener">176 terawatt-hours of electricity in 2023, or 4.4% of all US electricity</a>, and the Department of Energy&#8217;s Lawrence Berkeley National Laboratory projects that share could reach <a href="https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf" target="_blank" rel="noopener">12% by 2028</a>.</p>
<p>In 2025, PJM&#8217;s own summer forecast put peak demand at over <a href="https://www.prnewswire.com/news-releases/pjm-summer-outlook-2025-adequate-resources-available-for-summer-amid-growing-risk-302451333.html" target="_blank" rel="noopener">154,000 megawatts</a>, against roughly <a href="https://www.prnewswire.com/news-releases/pjm-summer-outlook-2025-adequate-resources-available-for-summer-amid-growing-risk-302451333.html" target="_blank" rel="noopener">179,200 megawatts of available capacity</a>. For the first time in PJM&#8217;s own assessment, supply could fall short of reserves in an extreme scenario reaching an <a href="https://www.prnewswire.com/news-releases/pjm-summer-outlook-2025-adequate-resources-available-for-summer-amid-growing-risk-302451333.html" target="_blank" rel="noopener">all-time peak above 166,000 megawatts</a>. If PJM hits that <a href="https://www.prnewswire.com/news-releases/pjm-summer-outlook-2025-adequate-resources-available-for-summer-amid-growing-risk-302451333.html" target="_blank" rel="noopener">166,000-megawatt</a> scenario, the reserve margin that&#8217;s supposed to keep your lights on during a heat wave gets thin.</p>
<p>PJM answered with a one-time <a href="https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2025-releases/20250502-pjm-chooses-51-generation-resource-projects-to-address-near-term-electricity-demand-growth.pdf" target="_blank" rel="noopener">Reliability Resource Initiative</a> that added more than 9,300 megawatts of new capacity to a <a href="https://theenergycollective.com/americas-grid-in-the-crosshairs-ai-aging-wires-and-a-fossil-fuel-revival/">grid already under strain</a>, most of it online by 2030.</p>
<h2>What PJM&#8217;s capacity auctions show</h2>
<p>PJM&#8217;s annual capacity auction pays power plant owners years ahead of time to promise they&#8217;ll be available, and every plant in a pricing zone gets paid the same cleared price no matter what it bid. That <a href="https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf" target="_blank" rel="noopener">price cleared at $269.92 per megawatt-day for the 2025/2026 delivery year</a> across most of the footprint, then jumped to <a href="https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf" target="_blank" rel="noopener">$329.17 for 2026/2027</a>, which PJM itself calls the FERC-approved price cap.</p>
<p>The two auctions since then eased. They cleared at <a href="https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf" target="_blank" rel="noopener">$333.44 for 2027/2028</a> and, most recently, <a href="https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf" target="_blank" rel="noopener">$325.00 for 2028/2029</a>, with every zone landing at that same price and none of them short enough to need a higher local rate.</p>
<p>New Jersey called the run-up to that first spike <a href="https://www.nj.gov/bpu/newsroom/2025/approved/20250723.html" target="_blank" rel="noopener">an 833% increase</a> and set a <a href="https://www.nj.gov/bpu/newsroom/2025/approved/20250723.html" target="_blank" rel="noopener">$325 price ceiling and $175 floor</a> on future auctions. It also funded a <a href="https://www.nj.gov/bpu/newsroom/2025/approved/20250723.html" target="_blank" rel="noopener">$430 million relief package</a> that sent $100 to every one of its 3.9 million residential customers, so if you&#8217;re one of them, that check already landed. That&#8217;s a state government spending money to soften a price its own <a href="https://theenergycollective.com/capacity-market/">capacity market</a> produced, part of why utilities are pointing at the market&#8217;s design itself.</p>
<h2>The case for letting utilities build again</h2>
<p>Exelon hasn&#8217;t owned a power plant since it <a href="https://www.exeloncorp.com/newsroom/exelon-completes-separation-of-constellation" target="_blank" rel="noopener">spun off Constellation Energy on February 2, 2022</a>, and Maryland&#8217;s wires-only rule for utilities traces to a <a href="https://psc.maryland.gov/wp-content/uploads/2025/11/ElecRestrucWhitePaper2005.pdf" target="_blank" rel="noopener">1999 restructuring law</a> that let the state&#8217;s utilities sell off their generating stations. That split is why BGE and Pepco own the poles, substations and transmission lines that carry power to a house, but nothing that generates it, and it&#8217;s the rule Butler wants changed.</p>
<p>Butler&#8217;s case rests on financing. He says Exelon&#8217;s <a href="https://www.investing.com/news/stock-market-news/exelon-to-intensify-push-to-own-midatlantic-power-plants-ceo-says-4251873" target="_blank" rel="noopener">return on assets runs about 9.5%</a>, roughly half what he says independent power plant owners earn, and argues a regulated utility can borrow more cheaply and build faster because it already owns land and interconnection rights near its wires.</p>
<p>If regulators say yes, the profit behind that 9.5% return comes out of the same bill you pay every month. &#8220;<a href="https://www.semafor.com/article/04/16/2026/exelon-ceo-calvin-butler-says-rising-energy-costs-can-be-addressed-with-easier-rules" target="_blank" rel="noopener">We have inadequate supply to meet this rising demand</a>, and until we address that issue, all of our bills are going to continue to go up,&#8221; Butler said in April 2026.</p>
<p>Butler frames the scale as historic. He said in December 2025 that the industry hasn&#8217;t seen load growth &#8220;<a href="https://fortune.com/2025/12/24/exelon-calvin-butler-ai-data-center-energy-warning/" target="_blank" rel="noopener">of this magnitude</a>&#8221; in &#8220;probably the last four decades,&#8221; and utilities nationwide plan to spend <a href="https://fortune.com/2025/12/24/exelon-calvin-butler-ai-data-center-energy-warning/" target="_blank" rel="noopener">$1.1 trillion on infrastructure over the next five years</a> to keep pace. Exelon&#8217;s own results give him room to make the case. The company&#8217;s <a href="https://www.semafor.com/article/02/17/2026/exelons-controversial-play-for-affordable-electricity" target="_blank" rel="noopener">net income reached $2.8 billion in 2025</a>, up from $2.5 billion in 2024.</p>
<h2>The case against it</h2>
<p>Consumer advocates read the same numbers differently. <a href="https://insideclimatenews.org/news/19082025/pjm-utilites-power-plant-deregulation/" target="_blank" rel="noopener">John Howat of the National Consumer Law Center</a> says growth like this makes utilities see &#8220;dollar signs,&#8221; and that isn&#8217;t the same as the public interest. Maryland&#8217;s People&#8217;s Counsel, <a href="https://insideclimatenews.org/news/19082025/pjm-utilites-power-plant-deregulation/" target="_blank" rel="noopener">David Lapp</a>, says utility ownership lets a company &#8220;grow their profits by expanding their businesses into generation so they can shift risks on the ratepayers.&#8221; New Jersey&#8217;s rate counsel, <a href="https://insideclimatenews.org/news/19082025/pjm-utilites-power-plant-deregulation/" target="_blank" rel="noopener">Brian Lipman</a>, makes the same point about shifting risk from developers onto the people paying the bill.</p>
<p>If regulators do shift that risk onto ratepayers, it lands on the same delivery line that&#8217;s already up <a href="https://marylandmatters.org/2025/11/03/exelon-power-plant-regulated-generation/" target="_blank" rel="noopener">30% since 2020</a> on a BGE bill.</p>
<p>Independent power producers reject Butler&#8217;s premise outright. <a href="https://insideclimatenews.org/news/19082025/pjm-utilites-power-plant-deregulation/" target="_blank" rel="noopener">LS Power&#8217;s Marji Philips</a> said independent companies &#8220;were investing heavily in new plants,&#8221; disputing that the market is failing. The <a href="https://insideclimatenews.org/news/19082025/pjm-utilites-power-plant-deregulation/" target="_blank" rel="noopener">Electric Power Supply Association&#8217;s Todd Snitchler</a> has warned lawmakers against &#8220;a reversal in policy and a return to the monopoly utility approach for generation,&#8221; and <a href="https://insideclimatenews.org/news/19082025/pjm-utilites-power-plant-deregulation/" target="_blank" rel="noopener">Advanced Energy United&#8217;s Amisha Rai</a> argues the fix is more market competition.</p>
<h2>Maryland chose a rebate over an ownership answer</h2>
<p>State Sen. Kevin Harris tested the idea directly, introducing <a href="https://www.thebanner.com/community/climate-environment/bge-natural-gas-utility-power-plants-kevin-harris-bill-WZBT43VJXZGQ5ALTSSOY7W4IDU/" target="_blank" rel="noopener">a bill in February 2026</a> that would have directed Maryland regulators to require at least one utility to build new generation, limited to storage, wind, solar, biofuels and hydropower. Senate President Bill Ferguson said lawmakers had &#8220;<a href="https://www.thebanner.com/community/climate-environment/bge-natural-gas-utility-power-plants-kevin-harris-bill-WZBT43VJXZGQ5ALTSSOY7W4IDU/" target="_blank" rel="noopener">a level of skepticism</a>&#8221; about whether it would save ratepayers money.</p>
<p>That bill didn&#8217;t pass. Maryland&#8217;s legislature instead passed a <a href="https://www.utilitydive.com/news/maryland-legislature-utility-rate-relief-act-exelon-firstenergy/817431/" target="_blank" rel="noopener">rate relief measure</a> expected to cut residential bills by <a href="https://www.utilitydive.com/news/maryland-legislature-utility-rate-relief-act-exelon-firstenergy/817431/" target="_blank" rel="noopener">at least $150 a year</a>, without authorizing any utility to own a power plant. If you&#8217;re a BGE or Pepco customer, that&#8217;s the concrete result so far: <a href="https://www.utilitydive.com/news/maryland-legislature-utility-rate-relief-act-exelon-firstenergy/817431/" target="_blank" rel="noopener">$150 a year</a> off your bill, and no new power plant.</p>
<p>The ownership question itself is still unanswered. Butler has said he means to keep pressing lawmakers on it beyond Maryland, and PJM&#8217;s capacity auctions clearing above <a href="https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2028-2029/2028-2029-bra-results-report.pdf" target="_blank" rel="noopener">$325 a megawatt-day</a> are the reason other state legislatures keep getting asked to take up the same fight.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>How much wind and solar can the grid handle</title>
		<link>https://theenergycollective.com/renewable-grid-limit/</link>
		
		<dc:creator><![CDATA[Energy Collective]]></dc:creator>
		<pubDate>Mon, 28 Sep 2026 17:55:24 +0000</pubDate>
				<category><![CDATA[Grid & storage]]></category>
		<guid isPermaLink="false">https://theenergycollective.com/renewable-grid-limit/</guid>

					<description><![CDATA[How much wind and solar can a grid handle? The duck curve shows where the limit bites, and NREL modeling puts a reliable US grid at 60% to 80%.]]></description>
										<content:encoded><![CDATA[<p><em>Originally published May 27, 2015. Updated September 28, 2026.</em></p>
<p>The duck curve is the real limit on wind and solar, and CAISO projected in 2016 that covering its evening ramp could need up to <a href="https://www.caiso.com/documents/flexibleresourceshelprenewables_fastfacts.pdf" target="_blank" rel="noopener">11,000 additional megawatts within about three hours</a> by 2020, with spring days needing up to <a href="https://www.caiso.com/documents/flexibleresourceshelprenewables_fastfacts.pdf" target="_blank" rel="noopener">13,000 megawatts</a> in that same window. That&#8217;s an economic limit, not a shortage of sun or wind. Solar and storage together made up <a href="https://www.woodmac.com/press-releases/solar-storage-91-percent-us-new-power-capacity-q1-2026/" target="_blank" rel="noopener">91% of new US generating capacity</a> in the first quarter of 2026, so the grid is already being rebuilt around it.</p>
<h2>How the duck curve squeezes a grid</h2>
<p>The duck curve is what that economic limit looks like on a chart. CAISO defines net load as the gap between forecast demand and what wind and solar alone will supply, and its 2016 fast facts sheet shows that gap <a href="https://www.caiso.com/documents/flexibleresourceshelprenewables_fastfacts.pdf" target="_blank" rel="noopener">sagging at midday, then climbing steeply at dusk</a> as solar rises and falls each day.</p>
<p>Picture a duck&#8217;s outline sitting on top of that chart, with a flat back through the morning and a belly that sags as solar output rises. A neck rises fast once the sun drops and panels stop producing. CAISO built that shape from <a href="https://www.caiso.com/documents/flexibleresourceshelprenewables_fastfacts.pdf" target="_blank" rel="noopener">actual grid data covering every day from 2012 through 2020</a>, watching the belly deepen and the neck steepen as more solar came online each year.</p>
<p>That neck is the same evening window CAISO said could need up to <a href="https://www.caiso.com/documents/flexibleresourceshelprenewables_fastfacts.pdf" target="_blank" rel="noopener">13,000 more megawatts</a> in about three hours, right when your own dinner is on the stove and the lights come on. Batteries are the fix grid operators reach for. They store the midday surplus and release it during the evening climb instead of curtailing panels or starting up a gas plant.</p>
<h2>Batteries are pushing the ceiling higher</h2>
<p>Wood Mackenzie counted <a href="https://www.woodmac.com/press-releases/solar-storage-91-percent-us-new-power-capacity-q1-2026/" target="_blank" rel="noopener">7.8 gigawatts of new US solar capacity</a> added in the first quarter of 2026 alone, and a record <a href="https://www.woodmac.com/press-releases/solar-storage-91-percent-us-new-power-capacity-q1-2026/" target="_blank" rel="noopener">45% of home solar installations were paired with a battery</a> in that same quarter. If you&#8217;re pricing out a home system, that <a href="https://theenergycollective.com/home-battery-backup/">pairing with a home battery</a> is close to a coin flip now, and it&#8217;s what turns the duck curve&#8217;s evening neck from a problem into a non-issue, banking cheap midday power to use after dark.</p>
<p>Solar alone added <a href="https://www.powermag.com/solar-adds-43-gw-in-2025-fifth-straight-year-as-top-new-generation-source/" target="_blank" rel="noopener">about 43 gigawatts of new US generating capacity in 2025</a>, <a href="https://www.powermag.com/solar-adds-43-gw-in-2025-fifth-straight-year-as-top-new-generation-source/" target="_blank" rel="noopener">54% of everything new that went on the grid that year</a>, and the <a href="https://www.powermag.com/solar-adds-43-gw-in-2025-fifth-straight-year-as-top-new-generation-source/" target="_blank" rel="noopener">fifth year running that solar led the nation&#8217;s top new generation source</a>. Pairing that much solar with <a href="/battery-energy-storage/">battery storage</a> is the fix for the timing problem the duck curve describes. It lets a grid sell power in the evening hours instead of only at midday.</p>
<h2>How far the ceiling has already moved</h2>
<p><a href="https://theenergycollective.com/renewable-energy/">Renewable energy</a> overtook coal in the world&#8217;s electricity mix for the first time in 2025, supplying <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">33.8% of global electricity against coal&#8217;s 33.0%</a>, according to Ember. Wind and solar together met <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">99% of the growth in global electricity demand in 2025</a>, with solar covering <a href="https://ember-energy.org/latest-insights/global-electricity-review-2026/" target="_blank" rel="noopener">about three-quarters of that increase</a>. You won&#8217;t see that on your own electric bill yet, since it&#8217;s a global figure and the US still trails it, but it&#8217;s the same shift now playing out at home, earlier and faster overseas.</p>
<h2>What the numbers say about the US grid</h2>
<p>The US still lags the rest of the world on total renewable share. Renewables supplied <a href="https://www.eia.gov/tools/faqs/faq.php?id=427&amp;t=3" target="_blank" rel="noopener">21.4% of US electricity generation in 2023</a>, with wind contributing <a href="https://www.eia.gov/tools/faqs/faq.php?id=427&amp;t=3" target="_blank" rel="noopener">10.2%</a> and solar <a href="https://www.eia.gov/tools/faqs/faq.php?id=427&amp;t=3" target="_blank" rel="noopener">3.9%</a>, according to the US Energy Information Administration. Solar&#8217;s share has grown fast since then, reaching <a href="https://www.energy.gov/eere/solar/solar-energy-united-states" target="_blank" rel="noopener">8.2% of US generation in the twelve months through August 2025</a>, up from <a href="https://www.energy.gov/eere/solar/solar-energy-united-states" target="_blank" rel="noopener">6.9% in 2024</a>, according to the Department of Energy, which means roughly one in twelve kilowatt-hours reaching your outlets now started as sunlight.</p>
<p>Panels themselves have gotten far cheaper over the same years. A solar module cost <a href="https://ourworldindata.org/grapher/solar-pv-prices" target="_blank" rel="noopener">$2.51 per watt in 2010 and $0.265 in 2024</a>, both figures in 2025 dollars, a drop of about 89%, according to Our World in Data.</p>
<h2>Jesse Jenkins put a number on this ceiling in 2015</h2>
<p>Hitting a ceiling before running out of room isn&#8217;t a new worry for wind and solar. In a piece <a href="https://thebreakthrough.org/issues/energy/a-look-at-wind-and-solar-part-2" target="_blank" rel="noopener">published on Energy Collective on May 27, 2015</a>, then-MIT researcher Jesse Jenkins argued that variable renewables hit an economic limit set by <a href="/capacity-factor/">a source&#8217;s capacity factor</a>, the share of hours it can run at full output. Wind and solar cost almost nothing to run once built, so grid operators dispatch them first, and Jenkins argued that pushes wholesale prices down hardest in the exact hours wind and solar generate the most.</p>
<p>Jenkins put the ceiling for wind at <a href="https://thebreakthrough.org/issues/energy/a-look-at-wind-and-solar-part-2" target="_blank" rel="noopener">roughly 25% to 35% of electricity supply</a>. Solar&#8217;s ceiling, he argued, was lower, at <a href="https://thebreakthrough.org/issues/energy/a-look-at-wind-and-solar-part-2" target="_blank" rel="noopener">10% to 20% in most regions</a>. Combined, he estimated variable renewables topping out around <a href="https://thebreakthrough.org/issues/energy/a-look-at-wind-and-solar-part-2" target="_blank" rel="noopener">one-third to one-half of total electricity</a>.</p>
<p>He pointed to Ireland, where the grid operator was already capping instantaneous wind and solar output at <a href="https://thebreakthrough.org/issues/energy/a-look-at-wind-and-solar-part-2" target="_blank" rel="noopener">about 50% of demand</a> in 2015. If a US grid capped your local wind and solar output the way Ireland&#8217;s did then, you would see it as curtailment, a paid-for panel or turbine throttled back for no reason visible on your bill. Wind supplied <a href="https://www.eia.gov/tools/faqs/faq.php?id=427&amp;t=3" target="_blank" rel="noopener">10.2%</a> of US electricity in 2023 and solar added another <a href="https://www.eia.gov/tools/faqs/faq.php?id=427&amp;t=3" target="_blank" rel="noopener">3.9%</a>, still far short of the ceiling Jenkins estimated in 2015.</p>
<h2>What ERCOT&#8217;s summer records mean for a Texas bill</h2>
<p>ERCOT&#8217;s hourly load averaged a record <a href="https://www.eia.gov/todayinenergy/detail.php?id=68084" target="_blank" rel="noopener">74.5 gigawatts for the week ending August 22, 2026</a>, 10% above the highest weekly average from summer 2025. That also beat the prior record of <a href="https://www.eia.gov/todayinenergy/detail.php?id=68084" target="_blank" rel="noopener">70.0 gigawatts set in 2023</a> by 6%. The following week held nearly as high, averaging <a href="https://www.eia.gov/todayinenergy/detail.php?id=68084" target="_blank" rel="noopener">73.7 gigawatts for the week ending August 29, 2026</a>, and the six weeks before that one all beat the 2023 record too, according to the <a href="https://www.eia.gov/todayinenergy/detail.php?id=68084" target="_blank" rel="noopener">US Energy Information Administration</a>.</p>
<p>Wind, solar, storage and gas together kept those hours covered, all leaned on at once by ERCOT through the hottest weeks of summer 2026, so the lights stayed on if you&#8217;re on the Texas grid. The grid keeps handling more than it was built for, one added gigawatt of batteries and panels at a time.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 

Served from: theenergycollective.com @ 2026-11-26 03:07:14 by W3 Total Cache
-->